State Load Despatch Center,Airoli (MSETCL) Statement I

Daily system Report for 12/May/2017 FRIDAY


I GENERATION (MUs) II EXCHANGES (MUs)
A) MSPGCL Daily Monthly E) InterState Exchanges Daily Monthly
1) Thermal 156.832 1833.855 1) Gujrat -1.580 -35.897
2) Hydro 4.276 54.960
3) Gas 6.653 99.604 2) Madhya Pradesh 12.929 135.752
Total MSPGCL 167.761 1988.419
B) 1) APML 55.829 701.157 3) Chattisgarh 6.100 74.780
2) JSWEL 16.383 257.583
4) Maharashtra Net 127.787 1518.576
3) VIPL 13.410 154.876
4) RPL(AMT) 16.415 181.306 5) Goa (Amona) -0.836 -9.680
5) WPCL 2.368 29.778
6) PGPL 0.000 0.000
Total 144.400 1683.531
7) Other IPP 6.799 61.211
a) Mumbai Schedule 26.582 293.676
C) 1) TPCL Thermal 14.131 179.363
42.027 b) Mumbai Drawl 34.155 380.193
2) TPCL Hydro 4.984
3) TPCL Gas 4.478 54.034 c) MSEDCL Bilateral * 35.898 489.356
4) R-INFRA Thermal 10.261 118.733 Include PX 3.659 122.351
D) STATE d) Mumbai Bilateral * 26.582 293.676
1) Thermal 292.428 3517.862 Include PX 2.112 24.350
(A1+C1+C4+(B1-B6)) Include Standby 0.000 0.000

2) Hydro (A2+C2) 9.260 96.987 H) ENERGY CATERED (MUs)


3) Gas (A3+B6+C3) 11.131 153.638 1) MSEDCL 399.705 4843.298
4) Wind 8.952 146.259 2) Mumbai Discoms 68.009 774.347
6) SOLAR 1.543 19.371
TOTAL STATE 323.314 3934.117 TOTAL STATE 467.714 5617.645
* Displayed for information, not added in total.
DETAILS OF MAHARASHTRA STATE PEAK DEMAND(MW) Statement II
PARTICULARS A. Morning Peak at B. Day Peak at 15 C. Evening Peak at D. Night Minimum
12 Hrs Hrs 20 Hrs at 24 Hrs
MSPGCL Thermal 6630 6562 6295 6289
MSPGCL Hydro 275 331 189 80
MSPGCL Gas 264 264 269 291
MSPGCL Total Generation 7169 7157 6753 6660
Central Sector Receipt 7208 7142 5817 4536
WIND 164 198 212 328
CPP / IPP Thermal 4865 4903 4428 4583
CPP / IPP Gas 0 0 0 0
SOLAR 234 169 0 0
Exchange with Mumbai -1511 -1584 -1476 -1666
MSEDCL DEMAND MET 18129 17985 15734 14441
Load Shedding 0 0 0 0
MSEDCL DEMAND 18129 17985 15734 14441
TPCL GENERATION 1321 1315 1114 764
R-INFRA GENERATION 500 502 389 388
MUMBAI DEMAND 3332 3401 2979 2818
STATE DEMAND MET 21461 21386 18713 17259
STATE DEMAND 21461 21386 18713 17259
Frequency (Hz) 49.89 49.82 49.86 49.91
FREQUENCY PARTICULARS
MAXIMUM FREQ. MINIMUM FREQ. AVERAGE FREQ. FREQ. BELOW 49.2 Hz
50.14 Hz at 10.01 Hrs 49.66 Hz at 22.18 Hrs 49.92 0 % of Time(min)
Note : The report is based on Operational Data and is for statistical purpose only.

Shift Engineer Shift Incharge


0 of 7
State Load Despatch Center,Airoli (MSETCL) Annexure-1
Daily and Progressive Generation,Maximum,Minimum for 12/May/2017
Generation Generation
Generating unit Daily Monthly Max Min Generating unit Daily Monthly Max Min
(Mus) (Mus) (MW) (MW) (Mus) (Mus) (MW) (MW)
Koradi PENCH (MS)
Unit 5 0.00 0.00 0 0 Pench (MS) 0.50 2.30 24 0
Unit 6 0.00 0.00 0 0 Total 0.50 2.30
Unit 7 3.80 44.74 165 134 Koyna
Unit 8 4.92 130.58 340 140 Stage 1-2 0.90 11.83 50 35
Unit 9 5.04 123.27 347 139 Stage 4 0.00 0.71 0 0
Unit 10 1.37 47.00 132 0 Stage 3 0.00 3.93 0 0
Total 15.14 345.59 Total 0.90 16.47
Bhusawal Hydro
Unit 2 0.00 0.00 0 0 KDPH 0.61 6.80 26 25
Unit 3 3.94 40.55 165 160 VTRNA 0.51 7.14 61 0
Unit 4 10.73 109.58 495 360 TILLARI 0.00 0.64 0 0
Unit 5 10.74 110.64 500 360 BHTGR/VEER 0.00 0.00 0 0
Total 25.42 260.76 BHIRA T.R. 0.20 2.00 70 0
Parli RNGR+BHTSA 0.00 2.76 0 0
Unit 4 0.00 0.00 0 0 BHANDARDRA 0.44 5.36 39 10
Unit 5 0.00 0.00 0 0 ELDARY 0.00 1.80 0 0
Unit 6 5.67 65.66 252 195 SMLHY_PTN 0.31 3.33 20 10
Unit 7 5.53 64.40 248 191 GHATGHAR 1.30 8.66 250 0
Unit 8 2.16 3.81 175 0 Total 3.37 38.49
Total 13.36 133.87 Wind
Chandrapur Total 8.95 146.26 0 0
Unit 3 4.41 52.57 190 165 Total 8.95 146.26
Unit 4 4.60 43.43 195 181 CPP
Unit 5 10.32 121.05 450 405 APML(Mus) 55.83 701.16 0 0
Unit 6 10.31 78.88 453 415 JSWEL(Mus) 16.38 257.58 0 0
Unit 7 0.00 0.00 0 0 VIPL(Mus) 13.41 154.88 0 0
Unit 8 10.32 111.47 490 385 RPLAMT(Mus 16.42 181.31 0 0
Unit 9 11.42 117.38 493 420 WPCL(Mus) 2.37 29.78 0 0
Total 51.38 524.77 Other(Mus) 6.80 61.21 0 0
Paras Total 111.20 1385.91
Unit 3 5.86 57.08 253 188 SOLAR
Unit 4 5.88 59.44 255 195 Total 1.54 19.37 0 0
Total 11.74 116.52 Total 1.54 19.37
Khaparkheda Tata
Unit 1 4.09 48.12 175 155 Trombay 5 8.98 115.50 472 307
Unit 2 4.09 47.27 180 145 Trombay 6 0.00 0.00 0 0
Unit 3 3.87 51.12 200 0 Trombay 7A 2.88 34.80 122 117
Unit 4 4.18 44.22 180 160 Trombay 7B 1.60 19.24 67 66
Unit 5 10.97 106.51 485 380 Trombay 8 5.16 63.86 242 200
Total 27.20 297.24 TATA Hydro 4.98 42.03 453 0
Nasik Total 23.59 275.42
Unit 3 4.22 52.22 200 165 R-INFRA
Unit 4 4.22 52.16 200 159 DTPS U-1&2 10.26 118.73 508 388
Unit 5 4.17 50.72 196 163 Total 10.26 118.73
Total 12.61 155.10
Uran
All Units 6.65 99.60 291 264
Total 6.65 99.60
PGPL
Unit 1 0.00 0.00 0 0
Unit 2 0.00 0.00 0 0
Total 0.00 0.00
1 of 7
* Infirm Power Summary Summary
Particulars Daily (Mus) Monthly Monthly Monthly
Particulars Daily (Mus) Particulars Daily (Mus)
(Mus) (Mus)
MSPGCL Thermal 156.83 1833.86 MSPGCL Total 167.76 1988.42
MSPGCL Thml+Gas 163.48 1933.46 Koyna 1,2 & 4 Total 0.90 12.54
MSPGCL Hydro 4.28 54.96 State Total 323.31 3934.12

2 of 7
State Load Despatch Center,Airoli (MSETCL) Annexure-2
Hourly Load Data As on 12/May/2017

TIME MSPGCL GEN. CPP / IPP Mum. MSEDCL LOAD MSEDCL


CS CS MUMBAI STATE FREQ.
SR. TOTAL WIND SOLAR NET DEM. SHEDDI DEM.
SHARE RECPT DEMAND DEMAND (Hz)
NO. THM HY GAS THM GAS EXCH. MET NG WITH LS

1 6417 83 283 6783 552 4546 0 0 5294 5044 -1594 15331 0 15331 2707 18038 49.89

2 6344 88 284 6716 711 4470 0 0 5420 5459 -1415 15941 0 15941 2502 18443 49.94

3 6715 83 284 7082 673 4484 0 0 5685 5784 -1255 16768 0 16768 2341 19109 49.94

4 7098 83 285 7466 648 4490 0 0 5613 5461 -1151 16914 0 16914 2238 19152 49.92

5 7072 97 285 7454 586 4500 0 0 5561 5287 -1087 16740 0 16740 2173 18913 49.91

6 7025 89 285 7399 609 4555 0 0 5856 5769 -1091 17241 0 17241 2177 19418 49.97

7 6862 111 283 7256 525 4707 0 5 5901 6038 -1070 17461 0 17461 2156 19617 49.95

8 6710 116 282 7108 283 4709 0 51 6155 6358 -1063 17446 0 17446 2271 19717 49.96

9 6722 178 278 7178 156 4703 0 105 6339 6583 -1238 17487 0 17487 2689 20176 49.96

10 6755 326 279 7360 143 4686 0 151 6404 6272 -1191 17421 0 17421 2898 20319 49.95

11 6651 325 276 7252 168 4783 0 195 6678 6060 -1425 17033 0 17033 3231 20264 49.98

12 6630 275 264 7169 164 4865 0 234 7148 7208 -1511 18129 0 18129 3332 21461 49.89

13 6605 291 272 7168 141 4829 0 215 7105 6693 -1538 17508 0 17508 3361 20869 49.90

14 6605 346 272 7223 205 4790 0 193 7052 6930 -1484 17857 0 17857 3288 21145 49.86

15 6562 331 264 7157 198 4903 0 169 7054 7142 -1584 17985 0 17985 3401 21386 49.82

16 6613 266 272 7151 367 5077 0 131 7091 6706 -1638 17794 0 17794 3428 21222 49.91

17 6437 110 264 6811 356 4915 0 69 6980 7025 -1751 17425 0 17425 3372 20797 49.91

18 6328 185 277 6790 519 4417 0 24 6011 5864 -1622 15992 0 15992 3196 19188 49.97

19 5989 214 277 6480 370 4341 0 1 5736 5442 -1636 14998 0 14998 3010 18008 49.92

20 6295 189 269 6753 212 4428 0 0 5983 5817 -1476 15734 0 15734 2979 18713 49.86

21 5947 154 280 6381 238 4465 0 0 6047 5974 -1466 15592 0 15592 2835 18427 49.91

22 5935 146 268 6349 398 4398 0 0 5806 5770 -1581 15334 0 15334 2795 18129 49.90

23 6226 110 279 6615 402 4561 0 0 5219 5178 -1622 15134 0 15134 2811 17945 49.87

24 6289 80 291 6660 328 4583 0 0 4921 4536 -1666 14441 0 14441 2818 17259 49.91

156.8
MUs 4.28 6.65 167.76 8.95 111.20 0.00 1.54 147.06 144.40 -34.15 399.71 0.00 399.71 68.01 467.71 49.92
3
NOTE : ALL VALUES IN MW
Mumbai Net Exch is shown with reference to MSETCL system and (-) sign indicates MSETCL periphery to Mumbai system.

3 of 7
State Load Despatch Center,Airoli (MSETCL) Statement-VI
Details of Generating Unit Outages/Trippings for 12/May/2017
Position as on 6.30 Hrs of 13/May/2017
Generating Name of Generating Unit Capacity Tripped Tripped Sync.Date Sync. Time Reason of Outage Expected
Company Date Time Date

PLANNED OUTAGE

Economic shutdown,(AOH
for 06.03.2016 To
TPC-G Trombay 6 500 15/07/2015 17.08 Continued. 04.04.2016) Unit Test
synch.07.04.2016 (12.03
To 12.30hrs)After overhaul
Turbine Problem, continued
MSPGCL Chandrapur Unit 7 500 25/01/2017 19.32 Continued.
under COH
FORCED OUTAGE

RGPPL Dabhol 1B 230 28/05/2013 22:02 Continued. Gas Shortage.

RGPPL Dabhol 1X 290 27/06/2013 21.46 Continued. Gas Shortage

RGPPL Dabhol 1A 230 27/06/2013 21.47 Continued. Gas Shortage

MSPGCL Koradi Unit 6 210 09/07/2015 00.00 Continued. EE R&M LE Work

IPP SWPGL U-1 135 16/02/2016 17.09 Continued. No PPA.

IPP SWPGL U-2 135 29/02/2016 21.46 Continued. No PPA

MSPGCL Parli Unit 4 210 01/04/2016 00.00 Continued. Economic shutdown

MSPGCL Parli Unit 5 210 01/04/2016 00.00 Continued. Economic shutdown


Boiler Tube
Leakage(Converted to Zero
MSPGCL Bhusawal Unit 2 210 14/06/2016 19.35 Continued.
Shedule By MSEDCL. from
00.00Hrs dt.19-6-16)
MSPGCL Uran Unit 8 108 14/08/2016 07.56 Continued. Maintenance work

RGPPL Dabhol 2A 230 24/08/2016 13.31 Continued. Change Over.


ID Fan problem, Converted
to Zero Schedule By
MSEDCL from 00.00hrs/22-
MSPGCL Koradi Unit 5 200 05/09/2016 00.21 Continued. 9-16. Shutdown taken on
18.10.2016 at 00:00Hrs for
Turbine inspection and
maintenance work
PGPL PGPL U1 262 07/02/2017 17.30 Continued. No Schedule

PGPL PGPL U2 126 07/02/2017 17.30 Continued. No Schedule

IPP RPL(AMT) U-5 270 15/04/2017 08.59 Continued. Coal Shortage

IPP RPL(AMT) U-4 270 15/04/2017 12.08 Continued. Coal Shortage


installation &
MSPGCL Koyna Unit 5 80 08/05/2017 08.20 Continued. commissioning of numerical
relay.
CPP SWPGL U-4 135 09/05/2017 05.10 Continued. ESP PROBLEM.

MSPGCL Uran Unit 6 108 09/05/2017 17.23 13/05/2017 00.25 Due to damper discrepency

IPP JSW (J) U2 300 11/05/2017 05.35 Continued. No Schedule.

MSPGCL Parli Unit 8 250 12/05/2017 10.25 12/05/2017 14.48 PA Fan problem

MSPGCL Koradi Unit 10 660 12/05/2017 13.17 Continued. CHP Bunkering Problem.

MSPGCL Khaparkheda Unit 3 210 12/05/2017 20.04 12/05/2017 23.06 Furnace Pressure High

MSPGCL Parli Unit 8 250 12/05/2017 20.10 Continued. FD Fan Vibration High.

MSPGCL Uran Unit 6 108 13/05/2017 00.52 13/05/2017 01.32 Damper Discrepency.

4 of 7
State Load Despatch Center,Airoli (MSETCL) Statement-VI
Details of Generating Unit Outages/Trippings for 12/May/2017
Position as on 6.30 Hrs of 13/May/2017
Generating Name of Generating Unit Capacity Tripped Tripped Sync.Date Sync. Time Reason of Outage Expected
Company Date Time Date

MSPGCL Khaparkheda Unit 3 210 13/05/2017 02.08 Continued. Furnace Pressure High

5 of 7
State Load Despatch Center,Airoli (MSETCL) Statement-VII
Details of Line outages/Trippings for 12/May/2017
Position as on 6.30 Hrs of 13/May/2017

Name of Line Inter State / Tripped Tripped Sync. Date Sync. Outage Reason of Outage
Intra State Date Time Time Type

500 KV LINE Outages/Trippings

HVDC Pole-I IntraState 13/05/2017 01.37 13/05/2017 06.45 PO Cold Washing Insulator String.

400 KV LINE Outages/Trippings


Line converted as 220 kV Solapur
Karad Solapur (PG) InterState 03/05/2017 11:49 Continued. PO
(PG)- Jeur from LOC 403
PMU Work @ SSNL End,RFG @
Dhule Sar'Sarovar I InterState 12/05/2017 14.27 Continued. PO
17.22 Hrs.
Ektuni-Bableshwar ckt II IntraState 01/05/2017 22.55 Continued. HT to control line load.

Khadka-Aurangabad (Waluj) IntraState 11/05/2017 20.33 12/05/2017 06.11 HT Over Voltage

Cahndrapur II - Dhariwal II IntraState 12/05/2017 06.48 12/05/2017 17.25 PO Line Maintenance work

Nagothane - Dabhol-II IntraState 12/05/2017 10.05 12/05/2017 18.47 PO Attending Hot Spot

Jejuri- Koynastage-IV IntraState 12/05/2017 18.38 Continued. T D/P,B Ph. to E Z-2.

Padghe - Nagothane - I IntraState 12/05/2017 22.48 Continued. T Distance Protection

Bhusawal-Aurangabad IntraState 13/05/2017 00.08 13/05/2017 05.57 HT Over Voltage

400 KV ICT Outages/Trippings


400/220/33 Kv 315 Mva Ict 1
IntraState 12/05/2017 07.33 12/05/2017 12.22 PO Testing Work
@Dhule
220 KV LINE Outages/Trippings

Mudshingi - Chikodi InterState 11/05/2017 06.01 13/05/2017 00.01 HT No Schedule.

Talandage - Chikodi InterState 11/05/2017 06.06 13/05/2017 00.02 HT No Schedule.

Talandage - Chikodi InterState 12/05/2017 06.05 Continued. HT No schedule

Tillari Amona InterState 12/05/2017 16.40 13/05/2017 02.20 T R Ph. CC Burst @ Tillari.

Mahalakshmi Amona InterState 12/05/2017 16.40 12/05/2017 17.45 T Breaker Trip from Amona End.

Mudshingi Chikodi InterState 13/05/2017 06.00 Continued. HT No Schedule.


Bunching of conductor Loc no 86
Disconnecting of jumer at Loc no
Chandrapur GCR - Warora - I IntraState 05/04/2015 09.13 Continued. PO
86 & 107 and de-energising the
line bet.86 to 107.
Bunching of conductor Loc no 86
Disconnecting of jumer at Loc no
Chandrapur GCR - Wani IntraState 05/04/2015 09.15 Continued. PO
86 & 107 and de-energising the
line bet.86 to 107.
make lilo arrangement for newly
Waluj - Jalna 1 IntraState 08/05/2017 08.35 Continued. PO
const.
Gadchandur - Virur-I IntraState 10/05/2017 17.22 Continued. T PDR Operated.

Phursungi-Parvati IntraState 11/05/2017 23.47 12/05/2017 00.26 HT Removing Bird Nest.


Rusted D Shackel Replacement
Mahad - Pedambe IntraState 12/05/2017 07.55 12/05/2017 17.55 PO
Work.
Replacement of Damaged Disc
Purti-Bhugaon IntraState 12/05/2017 08.55 12/05/2017 19.37 PO
Insulator Strings.
Wada - Bhaveghar IntraState 12/05/2017 10.07 12/05/2017 12.10 PO Testing Work

Padghe - Nalasopara IntraState 12/05/2017 10.34 12/05/2017 16.58 PO Outage.

Karad(400kv) - Wathar IntraState 12/05/2017 10.55 12/05/2017 17.35 PO Insulator String Replacement.

Waluj-Padegaon I IntraState 12/05/2017 10.57 12/05/2017 20.22 PO Attending Hot Spot

Deepnagar Khadaka 2 IntraState 12/05/2017 13.55 12/05/2017 20.12 PO Attending Hot Spot

Parli 3 (Oldgcr)-Harangul Ckt I IntraState 12/05/2017 16.33 12/05/2017 16.41 T While Downloading DR.
Line is Tripped from Tillari End
220kv Halkarni- Tillary IntraState 12/05/2017 16.35 12/05/2017 18.23 T
Only,Breaker Problem.
Halkarni-Mahalaxmiline IntraState 12/05/2017 16.40 12/05/2017 17.45 T Distance Protection

Taloja Ii - OCIL-II IntraState 12/05/2017 19.15 12/05/2017 20.24 T Distance Protection

Pophali - Kdph IntraState 12/05/2017 19.18 12/05/2017 21.50 T Distance Protection

Kharghar-PGPL IntraState 12/05/2017 19.45 Continued. T Distance Protection

HT : Hand Tripping, MT : Multiple Tripping, T : Tripping, PO : Planned Outage, EO : Emergency Outage, OO : Opportunity Outage

6 of 7
State Load Despatch Center,Airoli (MSETCL) Statement-VII
Details of Line outages/Trippings for 12/May/2017
Position as on 6.30 Hrs of 13/May/2017

Name of Line Inter State / Tripped Tripped Sync. Date Sync. Outage Reason of Outage
Intra State Date Time Time Type

220 KV ICT Outages/Trippings


Failed on internal Fault(Now
220/100 Kv 200 MVA ICT III
IntraState 21/09/2014 09.16 Continued. T repaired and ready for
@Borivali
commissioning)
220/132 Kv 200 MVA ICT III
IntraState 12/05/2017 07.45 12/05/2017 12.24 PO Attending Hot Spot
@Ambazari
220/100 Kv 200 Mva Alstom Ict 2
IntraState 12/05/2017 08.34 12/05/2017 17.15 PO Testing Work
@Apta
220/33kV 125 MVA Transformer 2
IntraState 12/05/2017 10.00 12/05/2017 15.58 PO Annual Maintenance Work
@REL Borivali
220/132 Kv 100 Mva Ict 1 @Phaltan
IntraState 12/05/2017 10.28 12/05/2017 15.51 PO LA Replacement Work.
Midc
132 KV LINE Outages/Trippings

Hingna-Ii-Khapari IntraState 12/05/2017 14.47 12/05/2017 17.31 T Distance Protection


LTS Operated @ 220KV
Harangul - Nilanga IntraState 12/05/2017 16.33 12/05/2017 16.41 T
Harangul.
LTS Operated @ 220KV
Harangul-Jagruti sugar IntraState 12/05/2017 16.39 12/05/2017 17.08 T
Harangul.
110 KV LINE Outages/Trippings

Khopoli Lodhivali Chembur IntraState 12/05/2017 19.36 12/05/2017 19.48 T Distance Protection

HT : Hand Tripping, MT : Multiple Tripping, T : Tripping, PO : Planned Outage, EO : Emergency Outage, OO : Opportunity Outage