State Load Despatch Center,Airoli (MSETCL) Annexure-2
Hourly Load Data As on 12/May/2017
1 6417 83 283 6783 552 4546 0 0 5294 5044 -1594 15331 0 15331 2707 18038 49.89
2 6344 88 284 6716 711 4470 0 0 5420 5459 -1415 15941 0 15941 2502 18443 49.94
3 6715 83 284 7082 673 4484 0 0 5685 5784 -1255 16768 0 16768 2341 19109 49.94
4 7098 83 285 7466 648 4490 0 0 5613 5461 -1151 16914 0 16914 2238 19152 49.92
5 7072 97 285 7454 586 4500 0 0 5561 5287 -1087 16740 0 16740 2173 18913 49.91
6 7025 89 285 7399 609 4555 0 0 5856 5769 -1091 17241 0 17241 2177 19418 49.97
7 6862 111 283 7256 525 4707 0 5 5901 6038 -1070 17461 0 17461 2156 19617 49.95
8 6710 116 282 7108 283 4709 0 51 6155 6358 -1063 17446 0 17446 2271 19717 49.96
9 6722 178 278 7178 156 4703 0 105 6339 6583 -1238 17487 0 17487 2689 20176 49.96
10 6755 326 279 7360 143 4686 0 151 6404 6272 -1191 17421 0 17421 2898 20319 49.95
11 6651 325 276 7252 168 4783 0 195 6678 6060 -1425 17033 0 17033 3231 20264 49.98
12 6630 275 264 7169 164 4865 0 234 7148 7208 -1511 18129 0 18129 3332 21461 49.89
13 6605 291 272 7168 141 4829 0 215 7105 6693 -1538 17508 0 17508 3361 20869 49.90
14 6605 346 272 7223 205 4790 0 193 7052 6930 -1484 17857 0 17857 3288 21145 49.86
15 6562 331 264 7157 198 4903 0 169 7054 7142 -1584 17985 0 17985 3401 21386 49.82
16 6613 266 272 7151 367 5077 0 131 7091 6706 -1638 17794 0 17794 3428 21222 49.91
17 6437 110 264 6811 356 4915 0 69 6980 7025 -1751 17425 0 17425 3372 20797 49.91
18 6328 185 277 6790 519 4417 0 24 6011 5864 -1622 15992 0 15992 3196 19188 49.97
19 5989 214 277 6480 370 4341 0 1 5736 5442 -1636 14998 0 14998 3010 18008 49.92
20 6295 189 269 6753 212 4428 0 0 5983 5817 -1476 15734 0 15734 2979 18713 49.86
21 5947 154 280 6381 238 4465 0 0 6047 5974 -1466 15592 0 15592 2835 18427 49.91
22 5935 146 268 6349 398 4398 0 0 5806 5770 -1581 15334 0 15334 2795 18129 49.90
23 6226 110 279 6615 402 4561 0 0 5219 5178 -1622 15134 0 15134 2811 17945 49.87
24 6289 80 291 6660 328 4583 0 0 4921 4536 -1666 14441 0 14441 2818 17259 49.91
156.8
MUs 4.28 6.65 167.76 8.95 111.20 0.00 1.54 147.06 144.40 -34.15 399.71 0.00 399.71 68.01 467.71 49.92
3
NOTE : ALL VALUES IN MW
Mumbai Net Exch is shown with reference to MSETCL system and (-) sign indicates MSETCL periphery to Mumbai system.
3 of 7
State Load Despatch Center,Airoli (MSETCL) Statement-VI
Details of Generating Unit Outages/Trippings for 12/May/2017
Position as on 6.30 Hrs of 13/May/2017
Generating Name of Generating Unit Capacity Tripped Tripped Sync.Date Sync. Time Reason of Outage Expected
Company Date Time Date
PLANNED OUTAGE
Economic shutdown,(AOH
for 06.03.2016 To
TPC-G Trombay 6 500 15/07/2015 17.08 Continued. 04.04.2016) Unit Test
synch.07.04.2016 (12.03
To 12.30hrs)After overhaul
Turbine Problem, continued
MSPGCL Chandrapur Unit 7 500 25/01/2017 19.32 Continued.
under COH
FORCED OUTAGE
MSPGCL Uran Unit 6 108 09/05/2017 17.23 13/05/2017 00.25 Due to damper discrepency
MSPGCL Parli Unit 8 250 12/05/2017 10.25 12/05/2017 14.48 PA Fan problem
MSPGCL Koradi Unit 10 660 12/05/2017 13.17 Continued. CHP Bunkering Problem.
MSPGCL Khaparkheda Unit 3 210 12/05/2017 20.04 12/05/2017 23.06 Furnace Pressure High
MSPGCL Parli Unit 8 250 12/05/2017 20.10 Continued. FD Fan Vibration High.
MSPGCL Uran Unit 6 108 13/05/2017 00.52 13/05/2017 01.32 Damper Discrepency.
4 of 7
State Load Despatch Center,Airoli (MSETCL) Statement-VI
Details of Generating Unit Outages/Trippings for 12/May/2017
Position as on 6.30 Hrs of 13/May/2017
Generating Name of Generating Unit Capacity Tripped Tripped Sync.Date Sync. Time Reason of Outage Expected
Company Date Time Date
MSPGCL Khaparkheda Unit 3 210 13/05/2017 02.08 Continued. Furnace Pressure High
5 of 7
State Load Despatch Center,Airoli (MSETCL) Statement-VII
Details of Line outages/Trippings for 12/May/2017
Position as on 6.30 Hrs of 13/May/2017
Name of Line Inter State / Tripped Tripped Sync. Date Sync. Outage Reason of Outage
Intra State Date Time Time Type
HVDC Pole-I IntraState 13/05/2017 01.37 13/05/2017 06.45 PO Cold Washing Insulator String.
Cahndrapur II - Dhariwal II IntraState 12/05/2017 06.48 12/05/2017 17.25 PO Line Maintenance work
Nagothane - Dabhol-II IntraState 12/05/2017 10.05 12/05/2017 18.47 PO Attending Hot Spot
Tillari Amona InterState 12/05/2017 16.40 13/05/2017 02.20 T R Ph. CC Burst @ Tillari.
Mahalakshmi Amona InterState 12/05/2017 16.40 12/05/2017 17.45 T Breaker Trip from Amona End.
Karad(400kv) - Wathar IntraState 12/05/2017 10.55 12/05/2017 17.35 PO Insulator String Replacement.
Deepnagar Khadaka 2 IntraState 12/05/2017 13.55 12/05/2017 20.12 PO Attending Hot Spot
Parli 3 (Oldgcr)-Harangul Ckt I IntraState 12/05/2017 16.33 12/05/2017 16.41 T While Downloading DR.
Line is Tripped from Tillari End
220kv Halkarni- Tillary IntraState 12/05/2017 16.35 12/05/2017 18.23 T
Only,Breaker Problem.
Halkarni-Mahalaxmiline IntraState 12/05/2017 16.40 12/05/2017 17.45 T Distance Protection
HT : Hand Tripping, MT : Multiple Tripping, T : Tripping, PO : Planned Outage, EO : Emergency Outage, OO : Opportunity Outage
6 of 7
State Load Despatch Center,Airoli (MSETCL) Statement-VII
Details of Line outages/Trippings for 12/May/2017
Position as on 6.30 Hrs of 13/May/2017
Name of Line Inter State / Tripped Tripped Sync. Date Sync. Outage Reason of Outage
Intra State Date Time Time Type
Khopoli Lodhivali Chembur IntraState 12/05/2017 19.36 12/05/2017 19.48 T Distance Protection