You are on page 1of 4

OFFICE OF THE

PHONE: 051-8311557 GENERAL MANAGER (SO)


EXCHANGE: 051-9258177, 9258178 NATIONAL POWER CONTROL CENTRE,
FAX No. 051-9250851 SECTOR H-8/1, ISLAMABAD.

No. 12056-69/GM (S0)/PPC/M0 Dated: 05/08/2021

OFFICE ORDER

SUBJECT: REVISED MERIT ORDER

Revised Merit Order based on revised fuel prices (received to this office
on 04-08-2021) for the economic dispatch of thermal power plants (GENCO'S
IPPs) effective from 05-08-2021 (Time 16:15 Hrs), is hereby issued for
implementation.

/
GENERAL MANA ER (U)
• NPCC, NTDC ISLAMABAD

DISTRIBUTION:
Chief Engineer (Operation Planning), NPCC, NTDC, Islamabad
Chief Engineer (Network Operation), NPCC, NTDC, Islamabad
Director Private Power Control, NPCC, NTDC, Islamabad
Director Power Control, NPCC, NTDC, Islamabad.
• NPCC Control Room, all Supervisory Shift Engineers.
CoPY TO:
PS to Secretary Ministry of Power (Energy) for information please.
Special Secretary, Power Division for information please.
M.D (NTDC), WAPDA House Lahore for information please.
Registrar NEPRA, NEPRA Tower Islamabad,
Chief Financial Officer (CFO CPPA-GL), Shaheen Plaza, Plot no. 73-West, Blue Area Islamabad.
Chief Technical Officer (CTO CPPA-GL), Shaheen Plaza, Plot no. 73-West, Blue Area Islamabad.
Chief Technical Officer (GENCO Holding), OPF Building G-5/2 Islamabad.
General Manager Power System Planning NTDC, 4th Floor PIA Building Lahore.
Director LT NTDC, WAPDA House Lahore.
MERIT ORDER
_ Based on Revised Fuel Prices, Effective From 04-08-2021 Or Subsequent Date
Other Cost Fuel Cost VO&M Cost Specific Cost Status in Last Merit
Sr..
No Plant Groups Fuel Type
Rs./kWh Rs./kWh Rs./kWhr Rs./kWh Order
1 LIBERTY Power (Upto 61,904 MWh) Gas - 1.26897 0.54481 1.81378 1
2 UCH (upto 152,375 MWh) Gas 0,07644 1.40541 0.39260 1.87445 2
3 Engro Power Thar Coal - 2.50210 1.07110 3.57320 3
4 747 MW GUDDU (CCP) Gas , - _ 5.94510 0.51430 6.45940 4
5 LIBERTY Power (Above 61,904 MWh) Gas* - 6.34485 _ _ 0.54481 6.88966 5
, .
6 China Power HUB Gen CO ‘ Coal - 6.44160 _. 0.50920 6.95080 6
7 KAPCO B-I Gas - 6.80852 0.39781 7.20633 7
8 UCH-II , Gas - 6.89280 0.35100 7.24380 8
9 Guddu (CCP) B-1 (Unit 11-13) Gas - 7.31270 0.06890 7.38160 9
10 UCH (above 152,375 MWh) Gas 0.07644 7.03676 • 0.39260 7.50580 10
11 Foundation Power , Gas - 6.90815 0.60540 7.51355 ' 11
- 12 PORT QASIM , Coal - 7.39790 0.19180 7.58970 12
13 Engro PoWerGen . Gas - 7.35909 0.53480 7.89389 1 13
14 GTPS Faisalabad B-IV (Unit 5-9) Gas - _ 7.76900 0.16250 7.93150 14
15 ,KAPCO B-II . Gas - 7.46781 0.46533 , 7.93314 , 15
16 GUddu (CCP) B-II (Unit 5-10) Gas - 8.12500 0.06890 8.19390 . 16
, 17 KAPCO B-111 Gas - 7,72358 0.89692 8.62050 17
18 747 MW GUODU (0C) . Gas - 8.87260 0.51430 9.38690 18 ,
19 HCPC Gas 1.88660 6.71361 0.83750 9.43771 19
.
20 Muzaffargarh B-II (Unit 4) Gas - 9.46890 0.16250 9.63140 20
... .
,.. 21 ,Muzaffargarh B-1 (Unit -3) - Gas - 9.48230 0.16250 9.64480 21
.22 Jamshoro B-It (Unit 4) Gas - 9.65670 0.09250 9.74920 22
,
23 Muzaffargarh 8-1 (Unit -1) Gas - 9.68440 0.16250 9.84690 23
24 Jamshoro B-11 (Unit 3) Gas 9.86160 0.09250 9.95410 24
-
25 Muzaffargarh B-1 (Unit -2) Gas - 9.81200 0.16250 9.97450 25
' 26 Jamshoro B-I1 (Unit 2) Gas - 10..12630 0,09250 10.21880 26
27 Muzaffargarh B-Ill (Unit -5) Gas - 10.06360 0.16250 ., 10.22610 27
_ 28 Sahiwal Power Coal - 10.17310 0.18240 10.35550 28 .
29 Muzaffargarh B-III (Unit -6) Gas - , 10.32980 . 0.16250 , 10.49230 29
30 KAPCO B-1 (S/Cycl) Gas - 10.21278 0.39781 10.61059 30
31 KAPCO B-11 (S/Cycl) Gas - 11.20172 , 0.46533 11.66704 , 31
..
32 Jamshoro B-11(Unit 4) Mix.(*****) - 12.06450 0.09250 12.15700 32
33 NPPMC - HBS (CC) RLNG - 12.20496 0.19370 12.39866 33
,
34 Jamshoro B-11 (Unit 3) Mix.("***) - 12.32950 0.09250 12.42200 34
35 KAPCO B-111 (S/Cycl) Gas - 11.58537 0.89692 12.48229 35
,
36 NPPMC - Baloki (CC) RLNG - 12.27428 021610 12.49038 , 36
37 ,Jamshoro B-I1 (Unit 2) Mix.( ). 12.66550 0.09250 12.75800 37
._ ,
38 QATPL - Bhikki (CC) RLNG - 12.32277 0.54240 12.86517 38 ,
39 Orient Power Company Ltd RLNG - 15.00840 0.36310 15.37150 40
40 . Sapphire Electric Co .RLNG - 14.99820 0.61090 15.60910 41
41 Muzaffargarh B-11 (Un)t 4) Mix.(*) , - 15.45535 0.16250 15.61785 42
,
42 -HalmorePower RLNG - 14.99910 0.62050 15.61960 43
43 Sail Power RLNG - 15.00980 0.61770 15.62750 44
44 Muzaffargarh B-I (Unit 3) Mix.(**) - 15.47845 0.16250 15.64095 45
45 Nandipur (CC) RLNG - 15.20930 0.58130 15.79060 46
46 Muzaffargarh B-I (Unit 1) Mix,(•) - 15.81850 0.16250 15.98100 47
-
47 Jamshoro B-II (Unit 4) Mix.(**) -15.91440 0.09250 16.00690 48
.
48 KAPCO B-I RLNG - 15.66772 0.39781 16.06553 49
.
49 Muzaffargarh B-1 (Unit 2) Mix.(**) - ' 16.03280 0.16250 16.19530 50
..
50 , Jamshoro B-11 (Unit 3) Mix.() - 16.25540 0.09250 16.34790 51
61 Muzaffargarh B-III (Unit 5) Mix.(**) - 16.45685 0.16250 16.61935 52
, 52 Jamshoro B-I1 (Unit 2) Mix.(**) - 16.70155 .0.09250 16.79405 53
53 ROUSCH RLNG - ,... 16.52185 0.40969 16.93154. , 54
54 Muzaffargarh B-111 (Unit 6) , Mix.(**) - 16.90695 0.16250 17.06945 55
55 Attock Gen RFO - 15.91400 1.52150 , 17.43550 56
56 -KAPCO B-11 RLNG - 17.18486 0A6533 , 17.65019 - 57 .
57 NIshat Chunian Power Ltd RFO - , 16.19380 , 1.46610 17.65990 58
58 GIPS Faisalabad B-IV (Unit 5-9) , RLNG - 17.87790 0.16250 .. 18.04040 59
59 ALTERN ENERGY LTD. (Ph-11) RLNG - 16.99744 1.12720 18.12464 60 .
60 FKPCL RLNG - 17.16997 1.10014 18.27011 61
61 KEL RFO A - 17.424 0.87526 . 18.32650 62

(71'
CY'
*t<

er,(2-\\

N1)6'
MERIT ORDER
Based on Revised Fuel Prices, Effective From 04-08-2021 Or Subsequent Date
62 KAPCO B-111 , RLNG - 17.77344 0.89692 18.67036 63 .
63 Atlas Power *REO - 17.83020 1.46960 19.29980 64
, 64 LALPIR (Pvt) Ltd RFO - 19.16365 0.25071 19.41436 65
65 KAPCO B-I , HSD - 19.11291 0.40002 19.51293 66
_
66 , Nishat Power Ltd RFO - 18.05320 1.46960 19.52280 67
-
, 67. Narowal Power RFO - 18.63590 1.32650 19.96240 68
, . 68 Liberty Power Tech Limited _ RFO - 18.34702 1.61620 19.96322 ' 69
69 KAPCO B-I RFO - 19.39960 0.69005 20.08965 70
70 -HUBCO RFO - 19.92093 0.26000 20.18093 39
7-1 Davis Energen RLNG - 19.63646 0.84540 20.48186 71
72 PAKGEN Power Ltd. RFO - 20.23907 , 0.25071 20.48978 72
73 Jamshoro B-I (Unit 1) RFO - 20.72620 0.09250 20.81870 73
74 -Ha!more Power HSD - 20.28820 0.89580 21.18400 74
-
NPPMC - HBS (CC) HSD - 20.98115 0.25120 21.23235 75
. 75 ,
76 Orient Power Company Ltd HSD - 20.69740 0.59530 _ 21.29270 76
77 Muzaffargarh B-11 (Unit 4) RFO - 21,15680 0.16250 21.31930 77
78 Muzaffargarh B-I (Unit -3) , . RFO - 21.18840 0.16250 21.35090 78
79 NPPMC - Baloki (CC) HSD - 21.14197 0.27420 21.41617 79
80 QATPL - Bhikki (CC) HSD - 20.65729 0.78260 21.43989 80
81 Sapphire Electric Co HSD - 20.58350 0.88170 , 21.46520 81
,.. 82 KAPCO B-11 HSD . 20.97665 0.53782 21.51447 82
83 , Muzaffargarh B-11 (Unit 4) Mix.(****) - 21.47335 0.16250 21.63585 83
84 Muzaffargarh B-I (Unit 3) Mix.(****) - 21.50460 0.16250 21.66710 84
85 Saif Power HSD - , 20.80330 0.89160 21.69490 85
86 Muzaffargarh B-I (Unit -1) RFO - 21.65390 0.16250 21.81640 86
-
87 -Muzaffargarh 8-11 (Unit 4) RLNG - 21.78990 0.16250 21.95240 87
88 Muzaffargarh B-I (Unit -3) RLNG , - 21.82080 0.16250 21.98330 , 88
89 Muzaffargarh B-I (Unit -2) RFO - 21.94720 0.16250 22.10970 89
90 SABA , RFO - 21.85875 0,25641 22.11516 90 ,
91 Muzaffargarh B-1 (Unit 1) Mix.(****) - 21.96980 0.16250 22.13230 91 ,
_
- 21.29139 0.97134 22,26273 92
92 KAPCO 8-11 _ RFO
93 Jamshoro B-11 (Unit 4) RFO - ,.. 22.17210 0.09250 .22.26460 93
94 Muzaffargarh 8-1 (Unit 2) Mix.(') - 22.26335 0.16250 22.42585 94
95 Muzaffargarh . B-I (Unit -1) RLNG - 22.28570 0.16250 22.44820 95
96 Muzaffargarh B-111 (Unit -5) RFO , - 22.52780 0.16250 22.69030 96
97 Jamshoro B-II (Unit -4) Mix.(****) - 22.62235 , 0.09250 22.71485 97 .
98 Jamshoro B-II (Unit 3) RFO - 22.64920 , .0.09250 22.74170 98 ,
,
99 Muzaffargarh B-1 (Unit -2) RLNG - 22.57950 0.16250 22.74200 99
100 ALTERN ENERGY LTD, (Ph-I) RLNG - 21.84001 1.12720 22.96721 100
101 ,Muzaffargarh B-111 (Unit 5) Mix.(***.) - 22.84305 0.16250 - 23.00555 101
102 KAPCO B-111 HSD - 21.69432 1.35812 23.05244 102
103 Jamshoro B-Il (Unit 4) RLNG - 23.07260 0.09250 23.16510 103
,
104 Jamshoro B-11 (Unit 3) i Mix.() - 23.10560 0.09250 23.19810 104
105 Muzaffargarh B-111 (Unit -6) RFO - 23.14390 0.16250 , 23.30640 105'
106 ,Muzaffargarh B-111 (Unit -5) RLNG - 23.15830 0.16250 23.32080 106
107 ,,Jamshoro B-11 (Unit 2) , RFO - 23.27680 0.09250 23.36930 107 .
108 Engro PowerGen HSD - 22.91799 0.54590 23.54389 108
,
109 Muzaffargarh B-Ill (Unit 6) Mix.(****) I, - 23.45735 0.16250 23.61985 109
110 Jamshoro B-11 (Unit 3) RLNG - 23.56200 0.09250 23,65450 110
Jamshoro 8-11 (Unit 2) Mix ..
Mix.(****) - 23.73570 0.09250 23.82820 - 111
,_ 111
112 KAPCO B-I (S/Cycl) RLNG - 23.50158 0.39781 , 23.89939 112
113 ,Muzaffargarh B-111 (Unit -6) RLNG , - 1, 23.77080 0.16250 23.93330 113
114 Jamshoro B-11 (Unit 2) _ RLNG . - 24.19460 0.09250 24.28710 114
115 ,KAPCO B-II (S/Cycl) RLNG - 25.77729 0.46533 26.24262 115
116 KAPCO B-III (S/Cycl) RLNG - 26.66016 0.89692 27.55708* 116
117 KAPCO • B-1 (S/Cycl)_ , HSD - 28.66937 0.40002 29.06938 117 .
118 KAPCO B-I (S/Cycl) RFO , - 29.09940 0.69005 29.78945 118 ,
119 KAPCO B-II(S/Cycl) HSD - 31.46498 0.53782 32.00279 119
_
120 ., KAPCO B-11 (S/Cycl) RFO - 31,93709 0.97134 32.90842 120
121 KAPCO B-III (S/Cycl) - HSD - 32.54148 1.35812 33.89960 121
MERIT ORDER
Based on Revised Fuel Prices, Effective From 0408-2021 Or Subsequent Date
The calculation of fuel costRs./kWh and O&M cost Rs./kWh has not been calculated by NPCC Islamabad; The same has been communicated to
NPCC by Chief Financial Officer CPPA-G vide letter No.CPPA-G/M1172502-09, dated 04-08-2021 received in the office of General Manager (System
Operation) through Email dated 04-08-2021, because NPCC has no any Data regarding heat rate, fuel cost and O&M cost etc.
Notes:
1 Fuel Index for HUBCO also includes Heat Rate & C.Value on the basis of 100% load. The PLAC payable to HUBCO may please be kept in
view by NPCC.
2 General Sales' Tax is not included in the above calculations.
3 RFO rates are on per Metric Ton, HSD rates are on per Litre, Gas rates are in MMBTU except KAPCO and FKPCL.

4 Other cost of Uch Power is due to Excise duty on gas.

5 RFO Revised Rates are calculated on the basis of average OMC rates provided by relevant 1PP for FCC projections.

6 While the IPPs operating on RLNG. RLNG price latest available has been taken notified by OGRA for the current month.

7 Fixed costs including fixed fuel costs (being non incremental) have not been used for merit order compilation pursuant to SDC 14.3.2 of the
Grid Code 2005:
8 Plant Availabilty on Any specific Fuel must be confirmed before the Dispatch is given.
9 The FCC rates have been assumed at 100% plant factor i.e. unity Part Load Correction factor:These rates may vary at different operation /
Despatch level after application of Part Load Correction (PLAC) factors given in•the PPA. Therefore, PLAC be taken into account before
issuing despatch instructions.

10 The 2002 policy gas projects require minimum despatch of 50% against their availability otherwise, shortfall energy have to be paid.
11 Guddu (W/O CCP) B-I unit 11-13 and B-Il unit 5-10 are excluded due to the tarifinot approved by NEPRA.However NPCC could restore 0.0
operation of TPS Guddu old blocks subject to understanding that payment will bpmade on C.0 tariff untill open cycle tariff is granted by
NEPRA.
12 Engro PowerGen excluded on Mixed Fuel (50% HSD and 50% Gas) due to Marginal Cost concept i.e. additional demand to be made on
alternate fuel.
13 Reference.to anomaly observed in the fuel procurement data provided by M/S HUBCOare revised /updated,fuel procurement data has been
obtained from the Company and accordingly updated In thp Merit Order
** Mixed: 50% FO and 50% Gas
*** Mixed: 50% HSD and 50% Gas
**** Mixed: 50% FO and 50% RLNG
***** Mixed: Gas and RLNG

System Operator will ensure stable power supply in accordance with the Grid Code clause SDC -1.4.3 Page 185 Grid Code and specially the
Note:
subclause 1.4.3.3 Page 185 Grid Code & subciause 1.4.3.4 Page 186 Grid Code
Merit list issued is only a part of that Grid Code for operation,
System Operator will give fircztOte smooth, stable, uninterrupted power supply by utilizing all available resources
as per demand. ,

e
\
)2.4b
hA

Chief Technical Officer (G


\, n
— sing V V General Manager Power ys em Panning

I-1\—

Chief Technica Officer (CTO CPPA-G) Chief Fna cial Offi er (CFO CPPA-G)

21tio7
n)
General Manager (System Oper PC (NTDC)
Convener

:7\97

You might also like