COMPUTATION OF LOAD DUE TO VARIOUS TYPES OF PIER SUBSTRUCTURES :-

NOTE: ALL HIGHLIGHTED CELLS ARE TO BE TREATED AS INPUT DATA

2.90

RL 13.906
Pier cap top Level
1.50

RL 12.406
1.50

H.F.L.
12.600

12.806

RL -0.400
Top Level of foundation

SECTIONAL ELEVATION

0.75 3.40 0.75

1.50

0.75 5.00 0.75

SECTIONAL PLAN PIER

2.90

10.00
PLAN OF PIER CAP
LOAD CALCULATIONS

1 FORMATION LEVEL 17.410 m

2 BEARING LEVEL 14.385 m

3 BEARING HEIGHT 0.185 m

4 PIER CAP TOP LEVEL 13.950 m

5 WELL CAP/ FOUNDATION TOP TOP -0.400 m

6 FOUNDING LEVEL -31.00 m

7 SCOUR LEVEL MAX. -20.105 m

8 HIGHEST WATER LEVEL(HFL) 12.600 m

9 MAX. VELOCITY OF FLOW 3.00 m/sec

10 PIER CAP THICKNESS 1.50 m

11 PIER CAP WIDTH 2.90 m

12 PIER CAP LENGTH 10.00 m

13 PIER WALL THICKNESS 1.50 m

14(a) PIER WALL LENGTH AT TOP 6.50 m

14(b) PIER WALL LENGTH AT BASE 4.90 m

15(a) PIER WALL HAS SEMI CIRCULAR ENDS


-STRAIGHT PORTION OF PIER WALL AT TOP 3.40 m

15(b) PIER WALL HAS SEMI CIRCULAR ENDS


-STRAIGHT PORTION OF PIER WALL AT TOP 5.00 m

16(a) PLAN AREA OF PIER WALL AT BOTTOM,A1 6.87 m2

16(b) PLAN AREA OF PIER WALL AT TOP,A2 9.27 m2

16(c) Volume of pier shaft, V 1 102.92 m3


((A1+A2+(A1*A2)0.5)*H/3
17 WEIGHT OF SUB STRUCTURE UPTO FOOTING TOP

- PIER CAP 82.77 t

- RL of cg of pier cap 13.406 m

- Height of cg of pier cap w.r.t. pier base 13.806 m

- PIER WALL 247.02 t

- RL of cg of pier wall w.r.t to pier wall top 6.32 m

- Height of cg of pier wall w.r.t pier base 6.720 m

- 15% PORE PRESSURE UPLIFT 13.39 t

- PEDESTALS 1.50 t

18 TOTAL WEIGHT OF SUBSTRUCTURE

- UNDER DRY CONDITION 331.29 t

- UNDER SUBMERGED CONDITION 319.40 t

- HEIGHT OF COMBINED CG OF SUBSTRUCTURE 8.499 m

- RL OF COMBINED CG OF SUBSTRUCTURE 8.099 m


SUBSTRUCTURE LOAD CALCULATIONS FOR PIER SUBSTRUCTURE

3.40m
Pier cap top Level
1.00m RL 95.950

0.50m
700 mm wide inspection platform,depth varying
1.00m from 250mm to 200mm

pier centre line

H= 14.25m

2.00m
RL 80.200
Top of well cap / open foundation

SECTIONAL ELEVATION
ALONG L-L AXIS
11.00m
Pier cap top Level
RL 95.950
1.00m

0.50m

5.00m 2500mm wide inspection platform,depth varying


from 250mm to 200mm

pier centre line

14.25m

6.00m RL 80.200
Top of well cap / open foundation

CROSS - SECTION ALONG T-T AXIS


2.00m 1.00m

1.00m

0.50m

6.00m A2 A1 5.00m

SECTIONAL PLAN AT SECTIONAL PLAN AT


BASE LEVEL CAP LEVEL
LOAD CALCULATIONS:

1 FORMATION LEVEL 100.300 m

2 BEARING LEVEL 96.450 m

3 PIER CAP TOP LEVEL 95.950 m

4 TOP OF WELL CAP 80.200 m

5 FOUNDING LEVEL 51.500 m


6 WEIGHT OF SUB STRUCTURE UPTO WELL CAP TOP

a) Weight of varying portion of pier shaft :-

Height of varying portion (m) = 14.25 m

Area of section at top of pier, A1 = 4.79 m2

Area of section at bottom of pier, A2 = 11.14 m2

Area of section at HFL, A3 = 10.68 m2

Volume of pier shaft, V = 110.32 m3


((A1+A2+(A1*A2)0.5)*H/3

b) Weight of the Pier cap :-

Height of uniform portion (m) = 1.00 m

C/S Area of the uniform portion = 37.40 m2

Volume of the uniform portion = 37.4*1.0 = 37.4 m3

Height of varying portion (m) = 0.50 m

Volume of the varying portion = 37.4+(1.2*5.2)+((37.4*(1.2*5.2))^0.5))*0.5/3


= 9.82 m3

Volume of pier cap, = 47.22 m3


((A1+A2+(A1*A2)0.5)*H/3

c) Weight of the Inspection platform :-

Total surface area of the platform = (2*(2.5*(3.4+2*0.7))+2*(11.0*0.7))

= 39.40 m2

Average depth of the platform = 0.225 m

Total volume of the inspection platform = 39.4*0.225 = 8.865 m3

Weight of railing on the inspection platform @ 0.3t/m = [2*(4.8+16.0)]*0.3 = 12.48 t

TOTAL WEIGHT OF PIER SHAFT = 399.38 t

WEIGHT DUE TO PEDESTALS = 1.50 t

TOTAL WEIGHT OF SUBSTRUCTURE = 413.36 t


COMPUTATION OF COMBINED C.G. OF PIER SHAFT FROM PIER CAP LEVEL
FOR SEISMIC ANALYSIS:

Horizontal C.G. of varying portion of pier shaft = 8.073 m

Horizontal C.G. of uniform portion of pier cap = 0.500 m

Horizontal C.G. of varying portion of pier cap = 0.187 m

Horizontal C.G. of inspection platform = 0.125 m

Height of Combined C.G. of substructure from pier cap t = 6.721 m

Therefore RL of combined C.G. of substructure w.r.t. top


of pier cap level = 89.229 m

Height of combined C.G. wrt well cap top = 9.029 m


SUBSTRUCTURE LOAD CALCULATIONS FOR PIER SUBSTRUCTURE

1.60m
Pier cap top Level
RL 28.390

pier centre line

H= 3.75m

RL 24.640

1.10m

` 1.34m

RL 23.300
0.80m

0.50m

RL 22.500 Founding level

5.00m

SECTIONAL ELEVATION
2.00m 2.75m

1.00m 1.375m

5.15m 3.15m A2 A1 3.15m 5.90m

1.00m
1.375m

SECTIONAL PLAN AT SECTIONAL PLAN AT


BASE LEVEL CAP LEVEL
LOAD CALCULATIONS:

1 FORMATION LEVEL 30.640 m

2 BEARING LEVEL 30.305 m

3 PIER CAP TOP LEVEL 28.390 m

4 FOOTING TOP 23.300 m

5 FOUNDING LEVEL 22.500 m

6 WEIGHT OF SUB STRUCTURE UPTO FOOTING TOP

a) Weight of varying portion of pier shaft :-

Height of varying portion (m) = 3.75 m

Area of section at top of pier, A1 = 14.60 m2

Area of section at bottom of pier, A2 = 9.44 m2

Volume of pier shaft, V1 = 44.73 m3


((A1+A2+(A1*A2)0.5)*H/3
b) Weight of constant bottom portion of pier shaft :-

Height of varying portion (m) = 1.34 m

Area of pier section = 9.44 m2

Volume of pier shaft, V = 12.65 m3

Therefore total volume of pier shaft = 57.38 m3

TOTAL WEIGHT OF PIER SHAFT = 137.72 t

WEIGHT DUE TO PEDESTALS = 1.50 t

7 TOTAL WEIGHT OF SUBSTRUCTURE = 139.22 t

COMPUTATION OF COMBINED C.G. OF PIER SHAFT FROM PIER CAP LEVEL


FOR SEISMIC ANALYSIS:

Horizontal C.G. of varying portion of pier shaft = 1.741 m

Horizontal C.G. of constant portion of pier shaft = 0.670 m

Combined C.G. of pier shaft from pier cap top level = 2.332 m

Therefore RL of combined C.G. of pier shaft w.r.t. top


of pier cap level = 26.058 m
5.90m
Pier cap top Level
RL 28.390

pier centre line

3.75m

3.15m

RL 24.640

0.50m 3.15m 0.50m

1.34m

Foundation depth RL 22.500


Founding Level

Foundation width

CROSS - SECTION