Site :
Item Description
(Provisional Quantities)
ZONE A1
FLOOR BEAM,SLAB and MAIN LIFT LOBBY
LABOUR QUARTER
FORMWORK TO COLUMN
Total
Remarks:
B.Q
Amount
[ / ] Yes
REVISED
] No
Workdone
%
1,285,719.84
25%
3,600.00
100%
40,104.00
100%
1,329,423.84
GRAND TOTAL(A):
less
i) Retention (5%) of grand total (A)
ii) site cleanliness (1%) grand total (A)
QS:
Nett Total:
PM:
Add Dayworks:
Accountant:
Nett Total:
Director:
Paid by Cheque No.:
Date:
[ / ] Yes
] No
Workdone
Amount
316,486.38
3,600.00
39,960.00
2,873.60
362,919.98
362,919.98
(18,146.00)
(3,629.20)
341,144.78
0.00
341,144.78
(162,064.68)
(15,000.00)
164,080.10
Item Description
Unit
Rate
Qty
Amount
WORKDONE
Amount
1
2
3
4
5
LS
M2
M2
M
M
16.00
16.00
3.50
3.50
6,933
300
-
1,650.00
110,928.00
4,800.00
rate only
rate only
95%
95%
0%
0%
0%
1,567.50
65,147.20
-
6
a.
b.
c.
d.
FRAME
LEVEL 1,2,3 & 4
Sawn fwk to flr.beams and curve on plan
1st Floor
2nd Floor
3rd Floor
4th Floor
M2
M2
M2
M2
M2
16.00
16.00
16.00
16.00
16.00
24,459
-
391,344.00
-
100%
40%
0%
0%
81,520.00
38,470.40
-
LEVEL 5
7 Sawn fwk to flr.beams and curve on plan
M2
16.00
15,058
240,928.00
0%
M2
16.00
0%
UPPER FLOOR
LEVEL 1-4
Swn fwk to sus. Slabs
1st Floor
2nd Floor
3rd Floor
4th Floor
M2
M2
M2
M2
M2
16.00
16.00
16.00
16.00
16.00
24,746
-
395,936.00
-
100%
40%
0%
0%
M2
16.00
6,542
104,672.00
0%
M
M
M
M
M
3.50
3.50
3.50
3.50
3.50
2,300
-
8,050.00
-
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
9
a.
b.
c.
d.
LEVEL 5
10 Swn fwk to soffit of sus. Slabs
______
11 Scupper drain, size 150mm w x 75mm dpt
a. 1st Floor
b. 2nd Floor
c. 3rd Floor
d. 4th Floor
12
a.
b.
c.
d.
M
M
M
M
M
3.50
3.50
3.50
3.50
3.50
13
a.
b.
c.
d.
e.
STAIRCASE
LEVEL GF 1,2,3,4 & 5
Swn fwk to side and soffit (Staircase 1)
Grd Floor - by HCC
1st Floor - by HCC
2nd Floor - by HCC
3rd Floor - by HCC
4th Floor - by HCC
M2
M2
M2
M2
M2
M2
16.00
16.00
16.00
16.00
16.00
16.00
306
-
a.
b.
c.
d.
e.
M2
M2
M2
M2
M2
M2
16.00
16.00
16.00
16.00
16.00
16.00
rate only
78,672.00
43,334.40
-
rate only
-
4,896.00
-
M2
M2
M2
M2
M2
M2
16.00
16.00
16.00
16.00
16.00
16.00
14
a.
b.
c.
d.
e.
M
M
M
M
M
M
2.72
2.72
2.72
2.72
2.72
2.72
572
-
a.
b.
c.
d.
e.
M
M
M
M
M
M
2.72
2.72
2.72
2.72
2.72
2.72
a.
b.
c.
d.
e.
M
M
M
M
M
M
2.72
2.72
2.72
2.72
2.72
2.72
15
a.
b.
c.
d.
e.
f.
M2
M2
M2
M2
M2
M2
M2
16.00
16.00
16.00
16.00
16.00
16.00
16.00
863
-
a.
b.
c.
d.
e.
f.
M2
M2
M2
M2
M2
M2
16.00
16.00
16.00
16.00
16.00
16.00
a.
b.
c.
d.
e.
f.
M2
M2
M2
M2
M2
M2
M2
16.00
16.00
16.00
16.00
16.00
16.00
16.00
16
a.
b.
c.
d.
e.
f.
M2
M2
M2
M2
M2
M2
M2
16.00
16.00
16.00
16.00
16.00
16.00
16.00
300
-
a.
b.
c.
d.
M2
M2
M2
M2
16.00
16.00
16.00
16.00
a.
b.
c.
d.
e.
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
1,555.84
-
13,808.00
-
100%
95%
0%
0%
0%
0%
729.60
565.44
-
100%
95%
0%
0%
0%
0%
656.64
508.90
-
0%
0%
0%
0%
0%
0%
4,800.00
-
100%
95%
0%
0%
0%
0%
1,505.60
1,151.55
-
100%
95%
0%
0%
1,505.60
1,151.55
-
e. 4th floor
f. 5th floor
SUNDRIES
17 Sawn fwk to 'R.C STEPS
Total
M2
M2
16.00
16.00
M2
16.00
147
2,352.00
1,285,719.84
0%
0%
0%
316,486.38
SUBJECT: SUPPLY LABOUR FOR CONSTRUCTION ON SITE DETENTION AND RAINWATER HARVESTING TANK -VO.1
Item
Description
Unit
Qty
Rate
ADDITION
Amount
WORKDONE
Amount
PROVISIONAL QUANTITIES
ON SITE DETENTION
size 80m length x 7m width x 6.00m depth
1.00
1.40
1.41
1.42
1.43
Drain (8 nos)
Sawn formwork, base
Sawn formwork, wall
Sawn formwork, to side of wall opening
Sawn formwork, cover slab
m2
m2
m2
m2
12
353
35.00
388
18.00
18.00
18.00
18.00
216.00
6,354.00
630.00
6,984.00
100%
100%
100%
100%
216.00
6,354.00
630.00
6,984.00
2.00
2.40
2.41
2.43
Sump (9 nos)
Sawn formwork, base
Sawn formwork, wall
Sawn formwork, cover slab (incl. opening)
m2
m2
m2
14
1,266
160
18.00
18.00
18.00
252.00
22,788.00
2,880.00
100%
100%
95%
252.00
22,788.00
2,736.00
40,104.00
Sub-Total (A)
39,960.00
PROVISIONAL QUANTITIES
RAINWATER HARVESTING TANK
size 35m length x 6m width x 4.150m depth
1.00
1.40
1.41
1.42
1.43
Drain (3 nos)
Sawn formwork, base
Sawn formwork, wall
Sawn formwork, to side of wall opening
Sawn formwork, cover slab
m2
m2
m2
m2
5.00
155.00
12
165.00
18.00
18.00
18.00
18.00
90.00
2,790.00
216.00
2,970.00
0%
0%
0%
0%
2.00
2.40
2.41
2.42
Sump (4 nos)
Sawn formwork, base
Sawn formwork, wall
Sawn formwork, cover slab (incl. opening)
m2
m2
m2
5.00
142.00
26.00
18.00
18.00
18.00
90.00
2,556.00
468.00
0%
0%
0%
9,180.00
Sub-Total (B)
TOTAL
49,284.00
Page 6 of 7
39,960.00
Item Description
1
a
b
c
d
e
FRAME
Swn fwk to Column
grd floor (COB-8)
1st to 2nd floor (C1-11, C2-6, C19-1)
2nd to 3rd floor
3rd to 4th floor
4th to 5th floor
Total
Unit
M2
M2
M2
M2
M2
Rate
16.00
16.00
16.00
16.00
16.00
Qty
Amount
WORKDONE
Amount
100%
100%
0%
0%
0%
195.20
2,678.40
2,873.60