Site :
Item Description
(Provisional Quantities)
ZONE A1
FLOOR BEAM,SLAB and MAIN LIFT LOBBY
LABOUR QUARTER
Total
Remarks:
B.Q
Amount
[ / ] Yes
REVISED
] No
Workdone
%
1,285,719.84
10%
3,600.00
100%
49,284.00
66%
1,338,603.84
GRAND TOTAL(A):
less
i) Retention (5%) of grand total (A)
Prepared by: Mohd Shahrir
QS:
Nett Total:
PM:
Add Dayworks:
Accountant:
Nett Total:
Director:
Date:
[ / ] Yes
] No
Workdone
Amount
134,302.80
3,600.00
32,691.60
170,594.40
170,594.40
(8,529.72)
162,064.68
162,064.68
76,192.19
85,872.49
Item Description
Unit
Rate
Qty
Amount
Qty
WORKDONE
%
Amount
1
2
3
4
5
LS
M2
M2
M
M
16.00
16.00
3.50
3.50
6,933
300
-
1,650.00
110,928.00
4,800.00
rate only
rate only
6
a.
b.
c.
d.
FRAME
LEVEL 1,2,3 & 4
Sawn fwk to flr.beams and curve on plan
1st Floor
2nd Floor
3rd Floor
4th Floor
M2
M2
M2
M2
M2
16.00
16.00
16.00
16.00
16.00
24,459
-
391,344.00
-
LEVEL 5
7 Sawn fwk to flr.beams and curve on plan
M2
16.00
15,058
240,928.00
M2
16.00
UPPER FLOOR
LEVEL 1-4
Swn fwk to sus. Slabs
1st Floor
2nd Floor
3rd Floor
4th Floor
M2
M2
M2
M2
M2
16.00
16.00
16.00
16.00
16.00
24,746
-
395,936.00
-
4,917.00
6,771.00
5,977.00
5,977.00
40%
0%
0%
0%
M2
16.00
6,542
104,672.00
7,185.00
0%
M
M
M
M
M
3.50
3.50
3.50
3.50
3.50
2,300
-
8,050.00
-
0%
0%
0%
0%
0%
0%
0%
0%
5.89
5.89
5.89
5.89
5.89
0%
0%
0%
0%
0%
9
a.
b.
c.
d.
LEVEL 5
10 Swn fwk to soffit of sus. Slabs
______
11 Scupper drain, size 150mm w x 75mm dpt
a. 1st Floor
b. 2nd Floor
c. 3rd Floor
d. 4th Floor
100%
100%
0%
0%
0%
1,650.00
68,576.00
-
5,095.00
6,011.00
5,554.00
5,554.00
40%
0%
0%
0%
32,608.00
-
13,996.00
0%
0%
4,286.00
incl
rate only
31,468.80
-
12
a.
b.
c.
d.
M
M
M
M
M
3.50
3.50
3.50
3.50
3.50
rate only
13
a.
b.
c.
d.
e.
STAIRCASE
LEVEL GF 1,2,3,4 & 5
Swn fwk to side and soffit (Staircase 1)
Grd Floor
1st Floor
2nd Floor
3rd Floor
4th Floor
M2
M2
M2
M2
M2
M2
16.00
16.00
16.00
16.00
16.00
16.00
306
-
a.
b.
c.
d.
e.
M2
M2
M2
M2
M2
M2
16.00
16.00
16.00
16.00
16.00
16.00
5.89
5.89
5.89
5.89
5.89
0%
0%
0%
0%
0%
a.
b.
c.
d.
e.
M2
M2
M2
M2
M2
M2
16.00
16.00
16.00
16.00
16.00
16.00
5.89
5.89
5.89
5.89
5.89
0%
0%
0%
0%
0%
4,896.00
-
14
a.
b.
c.
d.
e.
M
M
M
M
M
M
2.72
2.72
2.72
2.72
2.72
2.72
572
-
a.
b.
c.
d.
e.
M
M
M
M
M
M
2.72
2.72
2.72
2.72
2.72
2.72
a.
b.
c.
d.
e.
M
M
M
M
M
M
2.72
2.72
2.72
2.72
2.72
2.72
M2
M2
M2
M2
M2
M2
M2
16.00
16.00
16.00
16.00
16.00
16.00
16.00
863
-
M2
M2
M2
M2
M2
M2
M2
16.00
16.00
16.00
16.00
16.00
16.00
16.00
M2
M2
M2
M2
M2
M2
M2
16.00
16.00
16.00
16.00
16.00
16.00
16.00
300
-
M2
16.00
147
15
a.
b.
c.
d.
e.
f.
a.
b.
c.
d.
e.
f.
16
a.
b.
c.
d.
e.
f.
SUNDRIES
17 Sawn fwk to 'R.C STEPS
Total
1,555.84
-
46.84
46.84
46.84
46.84
46.84
0%
0%
0%
0%
0%
46.84
46.84
46.84
46.84
46.84
0%
0%
0%
0%
0%
46.84
46.84
46.84
46.84
46.84
0%
0%
0%
0%
0%
131.92
131.92
131.92
131.92
131.92
131.92
0%
0%
0%
0%
0%
0%
36.50
36.50
36.50
36.50
36.50
36.50
0%
0%
0%
0%
0%
0%
4,800.00
-
0%
0%
0%
0%
0%
0%
2,352.00
0%
13,808.00
-
1,285,719.84
134,302.80
CADANGAN PEMBANGUNAN KEDIAMAN KOS SEDERHANA SKIM PRIMA YANG MENGANDUNGI:-BLOK A & B PENGSAPURI 19-43 TINGKAT (2074 UNIT),
-5 TINGKAT PODIUM TEMPAT LETAK KERETA,
-KEDAI/DEWAN KOMUNITI/ PEJABAT PENGURUSAN/ SURAU/ TADIKA/ TASKA/ GIMNASIUM & PENCAWANG TNB DI ATAS LOT 40955 & LOT 40962,
ALAM DAMAI, MUKIM PETALING, DAERAH KUALA LUMPUR
Variation Order no.1 - Labour Quarter
DESCRIPTION
BQ
REF.
UNIT
RATE
QTY.
AMOUNT
(RM)
(RM)
WORKDONE
QTY
Amount
Labour Quarter
a
NOS
180.00
3,600.00
3,600.00
12/2/2014
20
100%
3,600.00
3,600.00
SUBJECT: SUPPLY LABOUR FOR CONSTRUCTION ON SITE DETENTION AND RAINWATER HARVESTING TANK -VO.1
Item
Description
Unit
Qty
Rate
ADDITION
Amount
WORKDONE
%
Amount
qty
PROVISIONAL QUANTITIES
ON SITE DETENTION
size 80m length x 7m width x 6.00m depth
1.00
1.40
1.41
1.42
1.43
Drain (8 nos)
Sawn formwork, base
Sawn formwork, wall
Sawn formwork, to side of wall opening
Sawn formwork, cover slab
m2
m2
m2
m2
12
353
35.00
388
18.00
18.00
18.00
18.00
216.00
6,354.00
630.00
6,984.00
12.00
353.00
35.00
388.00
100%
100%
100%
100%
216.00
6,354.00
630.00
6,984.00
2.00
2.40
2.41
2.43
Sump (9 nos)
Sawn formwork, base
Sawn formwork, wall
Sawn formwork, cover slab (incl. opening)
m2
m2
m2
14
1,266
160
18.00
18.00
18.00
252.00
22,788.00
2,880.00
14.00
1,266.00
160.00
100%
70%
80%
252.00
15,951.60
2,304.00
Sub-Total (A)
40,104.00
32,691.60
PROVISIONAL QUANTITIES
RAINWATER HARVESTING TANK
size 35m length x 6m width x 4.150m depth
1.00
1.40
1.41
1.42
1.43
Drain (3 nos)
Sawn formwork, base
Sawn formwork, wall
Sawn formwork, to side of wall opening
Sawn formwork, cover slab
m2
m2
m2
m2
5.00
155.00
12
165.00
18.00
18.00
18.00
18.00
90.00
2,790.00
216.00
2,970.00
0%
0%
0%
0%
2.00
2.40
2.41
2.42
Sump (4 nos)
Sawn formwork, base
Sawn formwork, wall
Sawn formwork, cover slab (incl. opening)
m2
m2
m2
5.00
142.00
26.00
18.00
18.00
18.00
90.00
2,556.00
468.00
0%
0%
0%
Sub-Total (B)
9,180.00
TOTAL
49,284.00
Page 6 of 6
32,691.60