CLAIM NO

CLIENT
CONTRACTOR
PERIOD
PROJECT

:- 01
:- COLOMBO DOCKYARD PLC
:- ASIAN ENGINEERING SERVICES (PVT) LTD.
:- FOR THE PERIOD OF 28TH MAY 2013 TO 20TH JULY 2013
:- WORKSHOP AT DOCK NO-3 SOUTH SIDE CDPLC
BOQ.

ITEM

DESCRIPTION

Previous Bill
UNIT

QTY.

A1 Preliminaries
A1-1 Allow sum mobilization to the site

Item

1.00

A1-2 Allow provisional sum for provde and maintain a performance


guarantee to the value equal to 10% of the contract price

Item

1.00

A1-3 Allow provisional sum for provde and maintain a mobilization


advance payment guarantee to the value equal to 10% for the
contract price.

Item

1.00

A1-4 Allow provisional sum for insurance for workmen compensation


for dead or injury ad third party liability.

Item

1.00

A1-5 Allo for providing sanitary acilities & temporary hut for
contractor's staff.

Item

1.00

A1-6 Setting out work

Item

1.00

B Demolition, Excavation and Earth work


B1-1 Demolition of existing Toilet,Office building & Shower area

Item

1.00

B1-1.1 Clearing the site & carting away debris from site

RATE

AMOUNT

Qty.

Amount

Current Bill
Qty

Amount

Total
Qty

Grand Total

Amount

300,000

300,000

1.00

300,000

300,000

100,000

100,000

1.00

100,000

100,000

M3

B1-2 Diverting of the existing service line beyond the cons. Work.

Item

1.00

B1-3 Clearing and preparation of the site

Item

1.00

B2 Excavation & Earth work Support


B2-1 Braking existing mass concrete floor

20.00

3,750

75,000

24.57

92,139

24.57

92,139

B2-2 Excavation of pits for Column foundation

260.00

1,500

390,000

193.32

289,980

193.32

289,980

B2-3 Provisional quantity for Earth work supports

Item

1.00

160,000

160,000

B3 Disposal
B3-1 Provisional item for disposal of surface water

Item

1.00

30,000

30,000

70%

21,000

70%

21,000

B3-2 Provisional item for disposal of de- water

Item

1.00

60,000

60,000

70%

42,000

70%

42,000

B4 Filling under floors


B4-1 Filling under floors & ramp with Gravel

50.00

4,400

220,000

B4-2 Filling under floors & ramp with Quary dust

130.00

6,100

793,000

B4-3 Filling under column foundation & ramp with Quary dust

70.00

6,100

427,000

121.33

740,100

121.33

740,100

C Concrete Work
C1 Grade 15 concrete
C1-1 Under column footings

5.00

18,000

90,000

4.52

81,360

4.52

81,360

C1-2 Ground beams

2.00

18,000

36,000

Approved Qty.

Amount

C1-3 Drainage and manholes

3.00

18,000

54,000

Grade 25 RC concrete
C1-4 Column footings

40.00

18,500

740,000

12.60

233,100

12.60

233,100

C1-5 Column shafts

9.00

18,500

166,500

2.78

51,515

2.78

51,515

C1-6 Ground beams

11.00

18,500

203,500

C1-7 Service ducts

5.00

18,500

92,500

C2 Form Work
C2-1 Sides of column footings

64.00

1,500

96,000

24.08

36,124

24.08

36,124

C2-2 Sides of column shafts

60.00

1,500

90,000

19.09

28,642

19.09

28,642

C2-3 Sides of ground beams

108.00

1,500

162,000

C2-4 Sides of service ducts

96.00

1,500

144,000

C2-5 Sides of drainages

72.00

1,500

108,000

C3 Reinforcements
C3-1 6mm

Kg

250.00

195

48,750

42.74

8,333

42.74

8,333

C3-2 10mm

Kg

1000.00

195

195,000

202.47

39,483

202.47

39,483

C3-3 12mm

Kg

200.00

195

39,000

29.79

5,810

29.79

5,810

C3-4 16mm

Kg

300.00

195

5,850

158.86

30,977

158.86

30,977

C3-5 20mm

Kg

150.00

195

29,250

D1-1 150mm t. hollow bricks foundation up to 3.0 M without plaster

52.00

1,500

78,000

TOTAL OF BOQ

CLAIM NO
CLIENT
CONTRACTOR
PERIOD
PROJECT

2,100,562

2,100,562

:- 01
:- COLOMBO DOCKYARD PLC
:- ASIAN ENGINEERING SERVICES (PVT) LTD.
:- FOR THE PERIOD OF 28TH MAY 2013 TO 20TH JULY 2013
:- WORKSHOP AT DOCK NO-3 SOUTH SIDE CDPLC
BOQ.

ITEM

DESCRIPTION

Previous Bill
UNIT

QTY.

RATE

AMOUNT

Qty.

Amount

Current Bill
Qty

Amount

Total
Qty

Grand Total

Amount

Extra Work & Variation


Ex-w1 Braking existing RCC concrete floor

5,625

8.18

46,035

8.18

46,035

Ex-w2 Removal of debris

2,500

208.95

522,374

208.95

522,375

Breaker
Days

5,000

53.00

265,000

53.00

265,000

4 nos /
column

1,000

8.00

8,000
841,409

8.00

8,000
841,410

Ex-w3 Hire of concrete brakers

Ex-w4 Placing of Anchor bolts on column shafts


TOTAL ( EXTRA AND VARIATIONS)

Approved Qty.

Amount

MEASUREMENT SHEET
CLAIM NO
:- 01
CLIENT
:- COLOMBO DOCKYARD PLC
CONTRACTOR :- ASIAN ENGINEERING SERVICES (PVT) LTD.
PERIOD
:- FOR THE PERIOD OF 28TH MAY 2013 TO 20TH JULY 2013
PROJECT
:- WORKSHOP AT DOCK NO-3 SOUTH SIDE CDPLC
Item

Description

B2-1 Braking existing mass concrete floor - Grid line "C"


Colum base at
C12

Times

Length Breadth Height

Sub total

2.50

1.60

0.35

1.40

C16

2.30

1.60

0.35

1.29

C17

2.20

1.60

0.30

1.06

C18

2.50

1.60

0.30

1.20

Braking existing mass concrete floor - Grid line "A"


Colum base at
A12

3.10

1.90

0.10

0.59

A13

3.40

2.00

0.90

6.12

A14

2.50

2.30

0.10

0.58

A15

2.90

2.90

1.35

11.35

A16

3.10

2.90

0.11

0.99

Grid line "C" at


C12

2.80

2.30

2.316

14.92

C14

2.25

2.20

2.592

12.83

C15

2.50

2.30

2.695

15.50

C16

1.30

2.10

1.755

4.79

C17

3.10

2.40

2.370

17.63

C18

2.20

2.40

1.828

9.65

3.10

2.75

2.100

17.90

3.10

1.90

0.90

5.30

[ Excavation from Base top to Rubble packing]

3.10

1.60

1.04

5.16

[ Less volome of existing Base]

-1

0.70

0.60

1.04

-0.44

Total

Unit

24.57

93.22

10.02

B2-2 Excavation of pits for Column foundation

C19

Excavation of pits for Column foundation


Grid line "A" at
A12 [ Excavation up to existing Base top}

Item

Description
A13 [ Excavation up to existing Base top}

Times

Length Breadth Height

Sub total

3.40

2.00

0.81

5.51

[ Excavation from Base top to Rubble packing]

3.40

1.70

1.57

9.05

[ Less volome of existing Base]

-1

1.50

0.60

1.57

-1.41

[ Less volome of existing Base]

-1

0.60

0.60

1.57

-0.57

2.50

2.30

0.57

3.28

[ Excavation from Base top to Rubble packing]

2.50

2.00

1.81

9.03

[ Less volome of existing Base]

-1

1.20

0.60

1.81

-1.30

2.90

2.90

0.67

5.59

[ Excavation from Base top to Rubble packing]

2.90

2.60

1.49

11.23

[ Less volome of existing Base]

-1

1.50

0.60

1.49

-1.34

3.10

2.90

0.62

5.57

3.10

2.60

1.47

A14 [ Excavation up to existing Base top}

A15 [ Excavation up to existing Base top}

A16 [ Excavation up to existing Base top}


[ Excavation from Base top to Rubble packing]

11.85
Total

Total

Unit

12.58

11.00

66.51
193.32

M
M

B3-2 Provisional item for disposal of de- water

20.06.2013

1.00

1.00

21.06.2013

1.00

1.00

24.06.2013

1.00

1.00

27.06.2013

1.00

1.00

29.06.2013

1.00

1.00

5.00 Days

B4-2 Filling under floors & ramp with Quary dust


Grid line "C" at
C12 [ Excavation from G.L to Rubble packing ]

2.80

2.30

3.065

19.74

[ Less volume of column base]

-1

2.00

1.90

0.475

-1.81

[ Less volume of column shaft up to G.L]

-1

0.70

0.50

1.420

-0.50

2.25

2.30

3.012

15.59

[ Less volume of column base]

-1

2.00

1.90

0.475

-1.81

[ Less volume of column shaft up to G.L]

-1

0.70

0.50

0.804

-0.28

2.50

2.30

3.095

17.80

-1

2.00

1.90

0.475

-1.81

C14 [ Excavation from G.L to Rubble packing ]

C15 [ Excavation from G.L to Rubble packing ]


[ Less volume of column base]

17.44

13.50

Item

Description
[ Less volume of column shaft up to G.L]

Times

Length Breadth Height

Sub total

4.96

17.42

1.89

18.33

2.68

5.27

6.46

-1.07

7.90

1.23

9.91

9.91
121.33

M
M

0.08

1.43

1.43

0.70

0.50

1.198

-0.42

1.30

2.10

2.259

6.17

[ Less volume of column base]

-1

1.85

1.20

0.475

-1.05

[ Less volume of column shaft up to G.L]

-1

0.70

0.50

0.429

-0.15

3.10

2.40

2.600

19.34

[ Less volume of column base]

-1

2.00

1.90

0.475

-1.81

[ Less volume of column shaft up to G.L]

-1

0.70

0.50

0.350

-0.12

2.20

2.40

0.812

4.29

[ Less volume of column base]

-1

2.50

1.90

0.475

-2.26

[ Less volume of column shaft up to G.L]

-1

0.70

0.50

0.412

-0.14

3.10

2.75

2.40

20.46

[ Less volume of column base]

-1

2.00

2.10

0.48

-2.00

[ Less volume of column shaft up to G.L]

-1

0.70

0.50

0.39

-0.13

3.10

1.60

0.59

2.93

-1

0.70

0.60

0.59

-0.25

3.40

1.70

1.17

6.73

[ Less volume of column base]

-1

1.50

0.60

1.17

-1.05

[ Less volume of column base]

-1

0.60

0.60

1.17

-0.42

2.50

2.00

1.51

7.55

-1

1.20

0.60

1.51

-1.09

2.90

2.60

1.19

8.97

-1

1.50

0.60

1.19

3.10

2.60

2.00

1.90

C17 [ Excavation from G.L to Rubble packing ]

C18 [ Excavation from G.L to Rubble packing ]

C19 [ Excavation from G.L to Rubble packing ]

Unit

15.57

-1

C16 [ Excavation from G.L to Rubble packing ]

Total

Filling under floors & ramp with Quary dust

Grid line "A" at


A12 [ Filling from Rubble packing to bottom of Base ]
[ Less volume of column base]
A13 [ Filling from Rubble packing to bottom of Base ]

A14 [ Filling from Rubble packing to bottom of Base ]


[ Less volume of column base]
A15 [ Filling from Rubble packing to bottom of Base ]
[ Less volume of column base]
A16 [ Filling from Rubble packing to bottom of Base ]

C
C1

Concrete Work
Grade 15 concrete
C12, C14, C15, C17, C19.

Item

Description
C16

Length Breadth Height

Sub total

1.85

1.30

0.30

0.72

1.00

0.50

0.30

0.15

1.60

1.00

0.08

0.12

1.30

0.25

0.08

0.02

2.04

2.15

0.35

1.54

0.55

0.69

0.35

0.13

1.35

0.50

0.08

2.70

1.80

C12, C14, C15, C16, C17, C18.

2.00

C13

C19

Total

Unit

1.02

0.05

1.72

0.08

0.36

0.36
4.52

M
M

1.90

0.40

9.12

2.50

1.80

0.40

1.80

2.10

2.00

0.40

1.68

12.60

C12

0.70

0.50

1.57

0.55

C13

0.70

0.50

0.37

0.13

C14

0.70

0.50

1.40

0.49

C15

0.70

0.50

1.39

0.49

C16

0.70

0.50

0.48

0.17

C17

0.70

0.50

1.22

0.43

C18

0.70

0.50

0.44

0.15

C19

0.70

0.50

1.10

0.38

2.78

C12, , C14, C15, C17, C18, C19.

7.80

0.48

22.23

C18

3.90

0.48

1.85

24.08

C18

C13

C1-4

Times

Grade 25 RC concrete
Column footings

C1-5 Column shafts

C2 Form Work
C2-1 Sides of column footings

C2-2 Sides of column shafts

Item

Description

Times

Length Breadth Height

Sub total

C12

2.40

1.57

3.76

C13

2.40

0.37

0.88

C14

2.40

1.40

3.36

C15

2.40

1.39

3.34

C16

2.40

0.48

1.14

C17

2.40

1.22

2.92

C18

2.40

0.44

1.06

C19

2.40

1.10

2.63

50

2.20

110.00

50

1.65

82.50

10

2.10

168.00

10

2.00

160.00

C12

2.67

5.34

C13

1.47

2.93

C14

2.50

5.00

C15

2.49

4.99

C16

1.58

3.15

C17

2.32

4.63

C18

1.54

3.08

C19

2.20

4.39

Total

19.09

Unit

C3 Reinforcements
C3-1 6mm [ Column shafts]

192.50 L.Mtr.
42.74 Kg

C3-2 10mm [ For Col Bases]


C12, C13,C14, C15, C16, C17, C18, C19.

328.00 L.Mtr.
202.47 Kg

C3-3 12mm [ Column shafts]

C3 Reinforcements

33.51 L.Mtr.
29.79 Kg

Item

Times

Description

Length Breadth Height

Sub total

Total

Unit

C3-4 16mm
C12

2.67

16.01

C13

1.47

8.80

C14

2.50

15.00

C15

2.49

14.96

C16

1.58

9.46

C17

2.32

13.90

C18

1.54

9.25

C19

2.20

13.17

100.54 L.Mtr.
158.86

Kg

8.18

Ex-1 Braking existing RCC concrete floor - Grid line "C"


Colum base at
Ditto in - C13

2.50

1.60

0.45

1.80

Ditto in - C13

2.20

1.60

0.40

1.41

Ditto in - C13

2.30

1.60

0.40

1.47

Ditto in - C13

2.40

1.60

0.30

1.15

Existing Plinth Beam at C19

2.50

1.60

0.30

1.20

Existing Plinth Beam at C18

2.40

1.60

0.30

1.15

Buckets

1.00

5.00

Buckets

11

1.00

11.00

Ex-w2 Removal of debris


Lorry

GIN

1 6/6/2013

Date

LI-8105

0001-

G.P

2 7/6/2013

LI-4348

0002-

162767

3 12/6/2013

LJ-9157

0003-

162771

4.46

2.30

1.10

11.28

LJ-9157

0003-

162768

4.46

2.30

1.10

11.28

LJ-9157

0003-

162769

4.46

2.30

1.10

11.28

LJ-9157

0003-

4.46

2.30

1.10

11.28

4 13/6/2013

LD-9338

0004-

162774

4.00

2.27

1.00

9.08

5 13/6/2013

LI-0505

0005-

162773

4.10

2.30

0.93

8.77

6 14/6/2013

LK-5469

0006-

162776

4.10

2.30

0.93

8.77

Item

Times

Description

Length Breadth Height

Sub total

Total

Unit

7 14/6/2013

LD-9338

0007-

162775

4.00

2.27

1.00

9.08

8 17/6/2013

LD-8181

0008-

162779

4.00

2.30

0.93

8.56

9 12/6/2013

LE-7833

0009-

162780

4.00

2.30

0.93

8.56

10 20/6/2013

LA-1759

0010-

4.47

2.27

0.92

9.34

11 27/6/2013

LK-5469

0011-

162778

4.00

2.30

0.95

8.74

12

1/7/2013

LK-5469

0012-

162781

4.00

2.30

0.95

8.74

13

2/7/2013

LK-5469

0013-

4.00

2.30

0.95

8.74

14

3/7/2013

LA-1794

0014-

4.10

2.30

0.95

8.96

15

5/7/2013 HQ-8308

0015-

162784

1.60

3.12

0.56

2.80

16

5/7/2013 HQ-8308

0016-

162785

1.60

3.12

0.56

2.80

17

6/7/2013 HQ-8308

0017-

1.60

3.12

0.56

2.80

18

6/7/2013 HQ-8308

0018-

1.60

3.12

0.56

2.80

19

8/7/2013 HQ-8308

0019-

1.60

3.12

0.56

2.80

20

8/7/2013 HQ-8308

0020-

1.60

3.12

0.56

2.80

21

9/7/2013 HQ-8308

0021-

1.60

3.12

0.56

2.80

22

9/7/2013 HQ-8308

0022-

1.60

3.12

0.56

2.80

23

9/7/2013 HQ-8308

0023-

1.60

3.12

0.56

2.80

24

11/7/2013 HQ-8308

0024-

162789

1.60

3.12

0.56

2.80

25 15/7/2013

HQ-8308

0025-

162800

1.60

3.12

0.56

2.80

26 15/7/2013

HQ-8308

0026-

162801

1.60

3.12

0.56

2.80

4.00

2.30

0.93

8.56

1.60

3.12

0.56

2.80

27 15/7/2013

LE-7833

0027-

28 15/7/2013

HQ-8308

0028-

166302

29 16/7/2013

HQ-8308

0029-

1.60

3.12

0.56

2.80

30 16/7/2013

HQ-8308

0030-

1.60

3.12

0.56

2.80

208.95

Item

Description

Times

Length Breadth Height

Sub total

Ex-w3 Hire of concrete brakers


Date
30/5/2013

1.00

1.00

31/5/2013

1.00

1.00

1/6/2013

1.00

1.00

2/6/2013

1.00

1.00

3/6/2013

1.00

2.00

4/6/2013

1.00

2.00

5/6/2013

1.00

4.00

6/6/2013

1.00

4.00

7/6/2013

1.00

4.00

8/6/2013

1.00

4.00

9/6/2013

1.00

4.00

10/6/2013

1.00

4.00

11/6/2013

1.00

4.00

21/6/2013

1.00

1.00

22/6/2013

1.00

1.00

23/6/2013

1.00

1.00

24/6/2013

1.00

1.00

25/6/13

1.00

1.00

27/6/2013

1.00

1.00

28/6/2013

1.00

1.00

Total

Unit

Item

Description

Times

Length Breadth Height

Sub total

29/6/2013

1.00

1.00

30/6/2013

1.00

1.00

6/7/2013

1.00

1.00

7/6/2013

1.00

1.00

8/7/2013

1.00

1.00

12/7/2013

1.00

1.00

13/7/2013

1.00

1.00

14/7/2013

1.00

1.00

15/7/2013

1.00

1.00

16/7/2013

1.00

1.00

Total

Unit

53.00 Days

MEASUREMENT SHEET
CLAIM NO
CLIENT
CONTRACTOR
PERIOD
PROJECT
Item

:- 01
:- COLOMBO DOCKYARD PLC
:- ASIAN ENGINEERING SERVICES (PVT) LTD.
:- FOR THE PERIOD OF 20TH JULY2013 TO 20TH AUGEST 2013
:- WORKSHOP AT DOCK NO-3 SOUTH SIDE CDPLC
Times

Description

Length Breadth Height Sub total

Total

Filling under floor


B
B.4.3 Grid -A
A12

1
1

3.1
3.1

1.600
1.900

0.450
0.900
7.533

Less

1
1
1

2.4
0.7
0.7

1.600
0.500
0.600

0.475
0.500
0.450
-2.131
5.402

A13

1
1

3.4
3.4

1.700
2.000

0.615
0.955

less

1
1
1

2.85
1.5
0.7

1.950
0.600
0.500

0.475
0.615
0.440

10.049

0.154
-3.347
6.701

A14

1
1

2.5
2.5

2.300
2.300

0.835
0.975

Less

1
1
1

1.2
2.4
0.7

0.600
2.100
0.500

0.835
0.475
0.500

10.408

-3.170
7.237
A15

1
1

2.9
2.9

2.900
2.900

0.565
0.925

less

1
1
1

1.5
2.4
0.7

0.600
2.400
0.500

0.565
0.475
0.450

12.531

-3.402
9.129

A 16

1
1

3.1
3.1

2.600
2.900

0.445
0.620
9.161

Less

1
1

2.4
0.7

2.200
0.500

0.475
0.590
-2.715
6.446
34.915

C1.1

G-15 concrete
Gride A
A-12
A-13
Deduct
A-14
Deduct
A-15
Deduct

2.4

1.600

0.075

0.288

1
1
1
1
1
1

2.85
1.30
2.40
1.20
2.40
1.50

1.950
0.600
2.100
0.350
2.400
0.350

0.075
0.075
0.075
0.075
0.075
0.075

0.417
-0.059
0.378
-0.032
0.432
-0.039

2.40

2.200

0.075

0.396

A-16
1.781
C1.4

G 25 RC Concrete
Grid A column footings
A12
A13
Deduct
A14
Deduct
A15
Deduct
A16

1
1
1
1
1
1
1
1

2.40
2.85
1.30
2.40
1.20
2.40
1.50
2.40

1.600
1.950
0.600
2.100
0.350
2.400
0.350
2.200

0.400
0.400
0.400
0.400
0.300
0.400
0.300
0.400

1.536
2.223
-0.312
2.016
-0.126
2.304
-0.158
2.112
9.596

C1.5

Column shaft
A12
A13
A14
A15
A16

1
1
1
1
1

0.70
0.70
0.70
0.70
0.70

0.500
0.500
0.500
0.500
0.500

0.500
0.440
0.500
0.450
0.590

0.175
0.154
0.175
0.158
0.207
0.868

C1.6

Concrete G 25 ground beam


Grid A 12 to A 16

25.00

0.700

0.500

8.750
8.750

Column concreting

C11-C12
(h=(420+420+410)/3)

6.00

0.300

0.415

0.747

(h=(340+380+410)/3

5.00

0.300

0.375

0.563

(h=(390+380+300)/3)

5.00

0.300

0.355

0.533

1.70

0.300

0.400

0.204

(h=(410+360+450)/3

5.50

0.300

0.405

0.668

h=(460+370+450)/3

5.50

0.300

0.425

0.701

h=(380+480+400)/3

5.50

0.300

0.420

0.693

h=(380+390+430)/3

5.50

0.300

0.400

0.660

C12-C13
C13-C14

C14-C15
C15-C16

C16-C17

C17-C18

C18-C19
4.769
13.519

C2
C2.1

Form work
Side of column footing
A12

1.4
2.4

1
1
1

2.40
1.40
1.60

0.400
0.400
0.400

0.960
0.560
0.640

1
1
1

2.85
1.40
1.90

0.400
0.400
0.400

1.140
0.560
0.760

1
1
1

2.40
2.10
1.60

0.400
0.400
0.400

0.960
0.840
0.640

1.6
A13

1.4

2.85

1.9
A14

2.1

2.4

1.6

A15

2.4

2.4

1
1
1

2.40
2.40
2.20

0.400
0.400
0.400

0.960
0.960
0.880

2
2

2.40
2.20

0.400
0.400

1.920
1.760

2.2
A16
2.2
2.4

2.4

13.540

2.2
C2.2

Side of column shaft


A12
A13
A14
A15
A16

2
2
2
2
2
2
2
2
2
2

0.50
0.70
0.50
0.70
0.50
0.70
0.50
0.70
0.50
0.70

0.500
0.500
0.440
0.440
0.500
0.500
0.450
0.450
0.590
0.590

0.500
0.700
0.440
0.616
0.500
0.700
0.450
0.630
0.590
0.826
5.952

C 2.3 Form work Ground beam

2
2

25.00
0.70

0.500
0.500

25.000
0.700

2
2
2
2
2
2
2
2

6.00
5.00
5.00
1.70
5.50
5.50
5.50
5.50

0.415
0.375
0.355
0.400
0.405
0.425
0.420
0.400

4.980
3.750
3.550
1.360
4.455
4.675
4.620
4.400

25.700

C11-C12
C12-C13
C13-C14
C14-C15
C15-C16
C16-C17
C17-C18
C18-C19

31.790
57.490

C3
Reinforcement
C.3.1 6mm
Mild steel
600

400
100
A12

100

2.15

0.222

3.341

A13

2.15

0.222

3.341

A14

2.15

0.222

3.341

A15

2.15

0.222

3.341

A16

2.15

0.222

3.818
17.183

C3.2

Beam
C-11-C12

1 31

0.90

0.222

6.194

C12-C14
C14-C15

2 26
1 8

0.90
0.90

0.222
0.222

10.390
1.598

C15-C19

28 4

0.90

0.222

22.378
40.559

10mm
A12
100

2300

100

11

2.50

0.617

16.968

100

1400

100

19

1.60

0.617

18.757

A13
100

2700

100

10

2.90

0.617

17.893

100

1400

100

1.60

0.617

3.949

100

1230

100

10

1.43

0.617

8.823

100

1930

100

10

1.93

0.617

11.908

A14
100

2300

100

13

2.50

0.617

20.053

100

1100

100

1.80

0.617

3.332

100

1920

100

2.12

0.617

11.772

40.559
57.742

100

100

A15
100

2300

100

100
100

600
100

2270

100

100

1800

100

A16
100

2300

100

100

2000

100

10

1.70

0.617

10.489

15
4
6
13

2.50
0.80
2.47
2.00

0.617
0.617
0.617
0.617

0.000
23.138
1.974
9.144
16.042

17
19

2.50
2.20

0.617
0.617

26.223
25.791
226.254

Ground beam 10mm R/F


600
A12-A13
400
A13-A14
A14-A15
A15-A16

18
18
18
18
24

2.10
1.35
2.10
1.35
2.10

0.617
0.617
0.617
0.617
0.617

23.323
14.993
23.323
14.993
31.097

24

1.35

0.617

19.991

21

2.10

0.617

27.210

21

1.35

0.617

17.492
172.421
398.675

C3.3

12mm

100
2

1.77

0.888

3.144

1.71

0.888

3.037

A 12
1290

400
100
A13
1210

400
A14

100

1.77

0.888

3.144

1.72

0.888

3.055

1.86

0.888

3.303

1275

100

400

A15
1220

400
A16

100

15.682

1360

400
12mm R/F
C11-C14
C15-C16
150
C16-C18
150
C18-C19
150

6.4

18.15

0.888

64.469

1.20

0.888

4.262

6.70

0.888

23.798

150

12.4

150

12.70

0.888

45.110

6.4

150

6.70

0.888

23.798

1.20

0.888

4.262

1200

165.701
181.383

C3.4

16 mm
A12
A13
A13
A14

6
6
6
6

1.77
1.71
1.77
1.72

1.580
1.580
1.580
1.580

16.780
16.211
16.780
16.306

A15

1.86

1.580

17.633
83.708

C3.5

20mm
Top reinforcement

32.45

2.470

160.303

30.00

2.470

148.200

31.65

2.470

156.351

31.35

2.470

232.304

30.00

2.470

148.200

32.15

2.470

158.821

32.00

2.470

79.040

30.65

2.470

151.411

32.10

2.470

79.287

30.00

2.470

74.100

Bottom reinforcement

1388.017

Ex

Extra work

Ex-03 Apply level scread on column top at


75mm thick Conbentra GP with
formwork and chip and clean all surface.
Grid -C

8.00

8.000

Grid -A

5.00

5.000
13.000

Remove two nos of door and close it by


Ex-04 cement block work(1:5 motar)

1
1

0.90
0.98

1.950
2.100

1.755
2.048
3.803

Unit

m3

m3

m3

m3

m3
m3

m3

m3

m3

m3

m3
m3

m2

m2

m2

m2
m2

Kg

Kg
kg

Kg

Kg
Kg

Kg

Kg
Kg

Kg

Kg

Nos

m2