PROJECT: PROJECT: 2 X 660 MW IB THERMAL POWER STATION

TEST REPORT CURRENT TRANSFORMER


IDCT-PMCC 4A

CLIENT ODHISHA POWER GENERATION CORPORATION LTD Page 1 of 5


EPC-BOP BGR ENERGY SYSTEMS LTD - POWER PROJECT DIVISION Date: 5.6.2017

1. Board Details

1 STATION NAME/BOARD Unit 3 & 4 /4A BOARD


2 AREA/LOCATION IDCT PMCC
3 DRAWING NUMBER DOL3/533
4 RATING 200A

2. Verification of Name Plate Details

Results (Ok/ Not


Feeder No. Sl. No. Make Ratio VA Class INS.CL Ok)
R:16/T-493636 PRAGATI 200/1 10 1.0 B OK
3R3
B:16/T-493630 PRAGATI 200/1 10 1.0 B OK
R:16/T-493611 PRAGATI 200/1 10 1.0 B OK
4R5
B:16/T-493606 PRAGATI 200/1 10 1.0 B OK
R:16/T-493617 PRAGATI 200/1 10 1.0 B OK
5R5
B:16/T-493614 PRAGATI 200/1 10 1.0 B OK
R:16/T-493578 PRAGATI 200/1 10 1.0 B OK
6R3
B:16/T-493612 PRAGATI 200/1 10 1.0 B OK
R:16/T-493642 PRAGATI 200/1 10 1.0 B OK
7R5
B:16/T-493613 PRAGATI 200/1 10 1.0 B OK
R:16/T-493637 PRAGATI 200/1 10 1.0 B OK
8R5
B:16/T-493656 PRAGATI 200/1 10 1.0 B OK
R:16/T-493658 PRAGATI 200/1 10 1.0 B OK
9R3
B:16/T-493659 PRAGATI 200/1 10 1.0 B OK

Acceptance Criteria: Ratings,make & Type shall be as per approved Drawing

NAME DESIGNATION SIGNATURE DATE


TEST ENGR. SURESH M Testing Engr.
BGRESL ELANGOVAN Sr.Engr.
OPGCL
PROJECT: PROJECT: 2 X 660 MW IB THERMAL POWER STATION

TEST REPORT CURRENT TRANSFORMER


IDCT-PMCC 4A

CLIENT ODHISHA POWER GENERATION CORPORATION LTD Page 2 of 5


EPC-BOP BGR ENERGY SYSTEMS LTD - POWER PROJECT DIVISION Date: 5.6.2017

3. Physical Verification of Wiring Tightness from Primary & secondary terminals to


Protective &Metering terminals

Wiring Tightness (Ok/Not Ok)


Feeder no.
Protection/Metering R Y B Remarks

5R5 Metering OK - OK

6R3 Metering OK - OK

7R4 Metering OK - OK

3R2 Metering OK - OK

8R4 Metering OK - OK

4R4 Metering OK - OK

9R3 Metering OK - OK
Acceptance Criteria: There shall not be any loose connections and Terminal connections
shall be as per approved Drg

4. Ratio test

Ratio
Feeder Protection/ Results(Ok
R Y B Remarks
No. Metering /NotOk)
Sec Pri Sec Pri
Pri(A) Sec (A)
(A) (A) (A) (A)
50 0.248 - - 50 0.247 OK
100 0.497 - - 100 0.498 OK
5R5 METERING
150 0.750 - - 150 0.749 OK
200 0.998 - - 200 0.996 OK
50 0.248 - - 50 0.249 OK
100 0.497 - - 100 0.497 OK
6R3 METERING
150 0.748 - - 150 0.749 OK
200 0.998 - - 200 1.001 OK

NAME DESIGNATION SIGNATURE DATE


TEST ENGR. SURESH M Testing Engr.
BGRESL ELANGOVAN Sr.Engr.
OPGCL
PROJECT: PROJECT: 2 X 660 MW IB THERMAL POWER STATION

TEST REPORT CURRENT TRANSFORMER


IDCT-PMCC 4A

CLIENT ODHISHA POWER GENERATION CORPORATION LTD Page 3 of 5


EPC-BOP BGR ENERGY SYSTEMS LTD - POWER PROJECT DIVISION Date: 5.6.2017

50 0.251 - - 50 0.250 OK
100 0.499 - - 100 0.498 OK
7R4 METERING
150 0.749 - - 150 0.749 OK
200 0,999 - - 200 0.998 OK
50 0.251 - - 50 0.249 OK
100 0.499 - - 100 0.498 OK
3R2 METERING
150 0.749 - - 150 0.750 OK
200 0.999 - - 200 1.001 OK
50 0.249 - - 50 0.248 OK
100 0.499 - - 100 0.498 OK
8R4 METERING
150 0.749 - - 150 0.748 OK
200 1.001 - - 200 0.998 OK
50 0.249 - - 50 0.250 OK
100 0.499 - - 100 0.500 OK
4R4 METERING
150 0.749 - - 150 0.751 OK
200 1.001 - - 200 1.001 OK
50 0.249 - - 50 0.250 OK
9R3 METERING 100 0.499 - - 100 0.499 OK
150 0.749 - - 150 0.751 OK
200 1.001 - 200 - 0.999 OK
Acceptance Criteria: Ratio Error at rated Current is +/- 1%

5. Measurement of Secondary Winding resistance for Protection CTs

Resistance in
Feeder No. R Y B Remarks
3R3 1.1 - 1.2 OK
4R5 1.2 - 1.1 OK
5R5 1.2 - 1.1 OK
6R3 1.1 - 1.2 OK
7R5 1.2 - 1.2 OK

NAME DESIGNATION SIGNATURE DATE


TEST ENGR. SURESH M Testing Engr.
BGRESL ELANGOVAN Sr.Engr.
OPGCL
PROJECT: PROJECT: 2 X 660 MW IB THERMAL POWER STATION

TEST REPORT CURRENT TRANSFORMER


IDCT-PMCC 4A

CLIENT ODHISHA POWER GENERATION CORPORATION LTD Page 4 of 5


EPC-BOP BGR ENERGY SYSTEMS LTD - POWER PROJECT DIVISION Date: 5.6.2017

8R5 1.1 - 1.1 OK


9R3 1.2 - 1.2 OK

Acceptance Criteria: There shall not be any abrupt difference from Factory value.
6. Measurement of Insulation Resistance for CTs

Resistance in
Feeder No. Reference R Y B Remarks
Pri Earth >1G - >1G OK
3R3 Sec Earth >1G - >1G OK
Pri Sec >1G - >1G OK
Pri Earth >1G - >1G OK
4R5 Sec Earth >1G - >1G OK
Pri Sec >1G - >1G OK
Pri Earth >1G - >1G OK
5R5 Sec Earth >1G - >1G OK
Pri Sec >1G - >1G OK
Pri Earth >1G - >1G OK
6R3 Sec Earth >1G - >1G OK
Pri Sec >1G - >1G OK
Pri Earth >1G - >1G OK
7R5 Sec Earth >1G - >1G OK
Pri Sec >1G - >1G OK
Pri Earth >1G - >1G OK
8R5 Sec Earth >1G - >1G OK
Pri Sec >1G - >1G OK
Pri Earth >1G - >1G OK
9R3 Sec Earth >1G - >1G OK
Pri Sec >1G - >1G OK

NAME DESIGNATION SIGNATURE DATE


TEST ENGR. SURESH M Testing Engr.
BGRESL ELANGOVAN Sr.Engr.
OPGCL
PROJECT: PROJECT: 2 X 660 MW IB THERMAL POWER STATION

TEST REPORT CURRENT TRANSFORMER


IDCT-PMCC 4A

CLIENT ODHISHA POWER GENERATION CORPORATION LTD Page 5 of 5


EPC-BOP BGR ENERGY SYSTEMS LTD - POWER PROJECT DIVISION Date: 5.6.2017

7.Polarity test:
Wiring Tightness (Ok/Not Ok)
Feeder no.
Protection/Metering R Y B Remarks

3R3 Metering OK - OK

4R5 Metering OK - OK

5R5 Metering OK - OK

6R3 Metering OK - OK

7R5 Metering OK - OK

8R5 Metering OK - OK

9R3 Metering OK - OK
8.Remarks

Test results of all the CTs in the board are found satisfactory.

NAME DESIGNATION SIGNATURE DATE


TEST ENGR. SURESH M Testing Engr.
BGRESL ELANGOVAN Sr.Engr.
OPGCL