0yogzhj9c9 - DOUBLE POLE STRUCTURE PDF
0yogzhj9c9 - DOUBLE POLE STRUCTURE PDF
2 x MC 100 NOTES
600
INCOMING 1.ALL DIMENSIONS ARE TO BE READ AND
OVERHEAD LINE 50 X 50 X 6 NOT TO BE MEASURED.
LA 2.ALL DIMENSIONS ARE IN MM UNLESS
OUT GOING
OTHERWISE SPECIFIED
CABLE
`
1200
GANG
MC75
33KV
90 LBS. RAIL
1200
PLAN OR. EQVT.
TWO POLE STRUCTURE DROP - OUT
2 x MC 75
FOR CABLE TERMINATION FUSE
50 X 50 X 6
INCOMING
10500
OVERHEAD LINE CABLE
BOX
LA
2 x MC 100
5500
DANGER BOARD
3660
ANTI - CLIMBING
4500
DEVICE
2440
OPERATING
HANDLE GI PIPE
40 x 5 MM G.I
1 X 150 DIA.
1250
OUTGOING EARTH STRIP
CABLE
300
GROUND S.NO. REVISIONS DATE
300
KEY LINE DIAGRAM
2000
REVISIONS
DETAIL - A CLIENT
BRAHMAPUTRA CRACKER AND
150 MIN POLYMER LIMITED
750 DIA
PROJECT
PLAIN CONCRETE
150
DEALT BY
CHECKED BY
CLIENT'S SIGN
DETAIL - A
NOTES:-
1. STRUCTURE/MEMBER/FOUNDATION SIZES GIVEN ARE THE MINIMUM REQUIRED. CONTRACTOR TO CALCULATE THE ACTUAL
REQUIREMENTS BASED ON FORCES, SAG, WIND VELOCITY AND OTHER STRUCTURAL PARAMETERSAND PROVIDE THE SAME ARCHITECT'S SIGN
WITHOUT ANY COST/SCHEDULE IMPLICATIONS. THEFOUNDATION SHALL BE DESIGNED FOR CALCULATED FORCE USING
CONCRETE OF MIN. GRADE M20.
2. SUITABLE PROTECTIVE GAURD WIRE SHALL BE PROVIDED AS PER REC STANDARDS AT ROAD CROSSINGS.
3. THE POLE HEIGHTS ARE SUITABLE FOR A MAXIMUM SAG OF 1510 MM FOR 33KV LINES AT THE HIGHEST OPERATATIVE TEMP.
4. SUITABLE GUY WIRE ARRANGEMENT SHALL BE PROVIDED FOR POLE STRUCTURES AS REQUIRED. ESPECIALLY AT THE END
OF LINE AND AT TURNINGS. CONSULTANT
5. THE ARRANGEMENT SHALL BE USED AT TERMINATING POINT OF OVERHEAD LINES. ARCHITECTS, ENGINEERS,
VALUERS & PLANNERS
M.D. ROAD, CHANDMARI
GUWAHATI-781003 RAJKHOWAS
AARCHI
DRAWING TITLE
DRAWING NO.