You are on page 1of 1

PROJECT

CHENANI NASHRI TUNNEL


CATEGORY
TUNNELS
CLIENT
CHENANI NASHRI TUNNELWAY LIMITED (CTNL)
LOCATION
STATE OF JAMMU AND KASHMIR, INDIA
PROJECT YEAR
2013 - Em curso
CONSTRUCTION VALUE
350.000.000

MAIN CHARACTERSTICS
The 9,2 km long Patnitop tunnel, being built at the foot of the Himalayan
mountains, will connect the districts of Chenani and Nashri. It is a
bidirectional tunnel with 1x1 lanes and parallel to the main tunnel has been
provided an emergency tunnel. The links between the main tunnel and the
emergency tunnel are made every 300 m for pedestrian access and each
1,2 kilometers for vehicles. It has a wide range of equipments, such as
lighting, ventilation and ITCS devices.

PROVIDED SERVICES
Technical assistance for Operation & Maintenance and design review for
MEP works: ventilation; ITCS; and lighting.

LISBON FUNCHAL PRAIA DAKAR LUANDA MENONGUE MAPUTO


PRAA DE ALVALADE, RUA DR. PITA EDIFCIO AV. DE SANTIAGO, VDN - CIT HEUR RUA DAMIO DE GIS, RUA 1 DE MAIO, CASA AV. MRTIRES DE
N 7 9 ANDAR STADIUM, BLOCO 1 A1 EDIFCIO ORDEM DOS GOURGUI 75C - 2ME N. 16 - 18 S/N FRENTE JUSTIA, INHAMINGA, N 170, 12
1700 - 036 LISBOA | R/C 9000 - 160 FUNCHAL ENGENHEIROS, 1DIR TAGE BAIRRO DE ALVALADE 1 ESQ. MENONGUE | DTO - BAIXA
PORTUGAL MADEIRA | PORTUGAL PALMAREJO,PRAIA | B. P. 6701 DAKAR | LUANDA | ANGOLA ANGOLA MAPUTO |
+351 219 108 930 +351 291 700 160 CABO VERDE SNGAL +244 222 327 150 +244 936 394 200 MOAMBIQUE
lisboa@nrv-norvia.com madeira@nrv-norvia.com +238 262 44 60 +221 338 644 408 angola@nrv-norvia.com angola@nrv-norvia.com +258 21 305 397
caboverde@nrv- westafrica@nrv- mz@nrv-norvia.com
norvia.com norvia.com

You might also like