You are on page 1of 4

GRADE CONTROL

Mine Planning Software Empowers


Grade Controllers
User-friendly, collaboration-enabling, data-devouring modeling tools and
functionalities eliminate guesswork and simplify sharing
By Jesse Morton, Technical Writer

In an effort to increase productivity, more clude sample data, face mapping, grade Illustrated working reports for use else-
miners are turning to orebody modeling models, reserve reports and plans, assay where in the enterprise can be extracted
software to generate accurate models, and geological data, drilling (exploration from the digital mine. Vulcan gives users
maps, plans and forecasts. These systems and production), channel and grab sam- the ability to access the model and hover
create 3-D models of orebodies based on ples, the company reported. A grade over any of the drill holes and the data and
drill hole sampling and other data, which control model is generated in minutes to visualize and interrogate. The interpre-
can impact every downstream process via an automated specification-driven tation of the blast is very clear in the col-
from planning production to predicting process. The grade control model can be ored blocks, which give you the high, low
the changes in head grade for the plant. reconciled against the exploration block and waste designation, Slade said. Us-
Many of todays software and solution model to generate accurate tonnage, ing very standard tools, it can give you a re-
offerings provide accurate, dynamic and grade and ounces, accurate reserves re- serve report instantly, which presents the
user-friendly orebody and subsurface ports, profit information. bench polygons that are sent to the sur-
mapping. Three of the biggest are dis- Dynamic animations enable simple veyors. The surveyors go out and indicate
cussed below. expression of complex information that where those polygons are on the blast. Al-
can then be conveyed and used across ternatively, for GPS- and/or Wi-Fi-connect-
Vulcan Integrates and an enterprise, Robert Slade, senior vice ed mines, this information can be instantly
Optimizes president, sales, said. A picture speaks accessed by equipment operators to guide
Last April, Maptek released Vulcan Ver- a thousand words. We can combine all of excavation and material dispatch.
sion 10, which featured a number of new the relevant data into one 3-D working One of Vulcans selling points, Slade
tools. Those include the Automated Pit window ... that is not only the data from said, is the integration of Exploration to
Designer, Data Analyzer, Uniform Condi- the drill holes, he said. It also captures Scheduling tools in one user-friendly and
tioning, Maptek Workbench, Interactive all of the topography, the current mining powerful interface. Vulcans time-tested
Block Planner and Split Pit Solids. faces. You also have enormous amounts and proven exploration database, CAD,
Maptek Vulcan assimilates numerous of data from other pieces of information: triangulation and block modeling toolsets
and vast datasets to create 3-D, animat- The dump areas, the roads, the accesses. now incorporate productivity and optimiza-
ed, custom models, on which virtual op- Where was the face on Friday morning? tion tools like never before. These include
erations can be tested. Data sources in- Where is it now? the latest implementation of the Stope
Optimizer module (Version 3) now incor-
porating Risk Analysis, plus 6- and 8-point
stope shape capability, he said. Mine
Planning advancements include the latest
release of Vulcans Gantt Scheduler and
Mapteks Evolution Mine Scheduling suite,
incorporating genetic algorithms and dis-
tributed cloud processing. When it comes
to the toolset integrated and accessible
from the platform, Slade added, Vulcan
Depending on the volume of informa- has the best in the industry by far.
tion incorporated, Vulcan can develop Take for example, the Vulcan Gantt
a block model in minutes, the company Scheduler tool, described by Slade as a
reports. Once a model is generated for game-changer. Imports and exports are a
a stope, several reports can be created thing of the past with our latest integration
for storing grade block data in output developments, he said. The tool features
databases. Reports can be produced
functionalities offered by Microsoft Proj-
immediately after grade block creation
and customized for managers, met- ect. And it integrates all the power and
allurgists, engineers and geologists, functionality of Vulcans mine design and
the company says. (Photo: Maptek) modeling capability to deliver animated

28 E&MJ FEBRUARY 2017 www.e-mj.com

EMJ_pg28-33.indd 28 2/9/17 9:38 AM


GRADE CONTROL

mining sequences that empower users to


conduct tests, plan operations, hone pro-
cesses, and make forecasts, Slade said.
These animations convey more informa-
tion than Microsoft Project Gantt charts.
Plus, they are more user-friendly, he said.
Not everyone understands a (Micro-
soft Project) Gantt chart. They dont relate
to where your development is at the end of
May, where your stopes have progressed
to at the end of June, Slade said. Where
should we be at any point in time? What
is the amount of metal we are going to
realize from that work? What year is metal
production going to drop and for what rea-
son? Those sorts of questions can be an-
swered and illustrated with those anima-
tions, those 3-D moving pictures, which
go beyond a Gantt chart representation.
Maptek reportedly is primed to release
an update to their new Grade Control
package that will enable automated gen-
eration of bench block out polygons.
Minesights grade control solutions simplify the acquisition of information for cut planning and daily reporting, the
Our future is the automation and optimi- company reports. MineSight has comprehensive reserve and modeling utilities that are integrated throughout all
zation of polygon shapes that are used to of our planning tools, Seth Gering, software quality assurance engineer, says. This means that MineSight users
produce the grade control result, meaning can use the same resource estimation methodology and data for all parts of the planning and grade control process
identifying the tons and grade of each ore without having to manually transfer data between projects. (Graphic: Hexagon)
classification, high grade or low grade,
Slade said. Drawing the material desti- a good time because it puts pressure on constraints relaxation; fixed cost by phase
nation shapes by hand is really the only everyone to do things better and faster. and destination; ability to export cut ge-
tedious part of this whole process. A user ometry to MineSight 3D (MS3D) objects
has to come in and make that call, iterat- MineSight Empowers and MS3D End-of-Period tool; and speed
ing through multiple combinations. What Acquired by Hexagon in 2014, geology improvements for reserve calculation.
if they could hit a button and then that and mine planning software platform Mi- This and an optimization tool for stope
line would automatically pull out exactly neSight made headlines last August with design to be released in the near future
the optimum line or shape? the latest release of MineSight Planning will bring together powerful visualiza-
Slade said Vulcan can give a miner Suite Version 9.6, which the company said tion, modeling, scheduling and recon-
a competitive advantage in a period of featured improvements to the MineSight ciliation all into one single user environ-
general uncertainty within the sector. He Schedule Optimizer (MSSO) software. ment, Seth Gering, product manager,
pointed to Lundin Minings Eagle mine in With the update, the company re- operational planning, said. We are look-
Michigan, for example, which deployed ported, MSSO now provides a complete ing forward to improving workflow.
Vulcan in 2014. [It] is being used by all planning, operations and safety workflow. Simplified, MineSight, like its com-
technical services departments includ- It fully supports stratigraphic models, petition, is a cyber hub, a platform that
ing engineering and geology, the miner also known as Gridded Seam Models. enables distant users to operate in a cen-
told Forge, Mapteks technical magazine. Mining geometries [polygones or solids] tralized location, and to deploy a software
The mine needed to produce an on-the- can be imported into MSSO either from suite to manage data and generate a 3-D
fly block model outlining higher grade MineSight 3D viewer or from an existing digital twin of a mine. What separates it
zones as well as lithology changes within MineSight Planner project, Hexagon re- from the competition, Gering said, is its
a single stope. Engineers also wanted to ported. Through integration with Mine- dynamism. Our clients are collecting in-
determine mineable stope shapes based Sight Reserve, reserves associated with formation to make better decisions using a
on current metal prices. the geometries along with a list of mining variety of different systems, so our tools al-
Lundin was motivated by the same seams available in the GSM are used for low users to connect to virtually any source
economic forces that are compelling oth- proper reserve allocation. through a configurable interface, he said.
er miners to adopt state-of-the-art geology, The version features cashflow con- For example, we had one client that had
grade control and mine planning software straints, allowing you to define cashflow spent a lot of time building and populat-
packages, Slade said. Mining has become limits, Hexagon said. It also allows for ing a fragmentation database and wanted
marginal over the past decade. Its been customized benching with options for de- to use that information coupled with their
difficult. Prices have been low. Capital is fining elevation range for polygonal geom- grade control system for data analysis and
hard to find, he said. However, it is also etries. Other highlights include advanced making better decisions. This was not a

www.e-mj.com FEBRUARY 2017 E&MJ 29

EMJ_pg28-33.indd 29 2/9/17 9:38 AM


GRADE CONTROL

problem because we could easily connect one operation that was spending more GEMS, a geology and mining collaborative
to assay, geology, survey or other systems than 20 hours per week manually trans- system engineered to support cross-func-
through the configurable interface. ferring data between planning, assay and tional teams within an enterprise.
MineSight facilitates information-shar- FMS. With MineSight, they were able At the core of Dassault Systmes of-
ing and collaboration. Although most sys- to integrate information from fragmenta- ferings is the 3DEXPERIENCE Platform,
tems are now SQL or API based, there are tion, planning, drill and blast, and FMS described as a business experience
many that still require ASCII or DXF for sources that both reduced staff downtime platform, which the company reported
data transfer. Our solution is easily con- and increased truck load/dump cycles by in September had reached its 10,000th
figurable and scalable so that operations about 13% or 100 trucks per day. production user. Nicolas Jeanne, se-
can share information using any format A U.S. mine that implemented Mine- nior manager, natural resources industry
they have today and in the future, Gering Sight-optimized grade control and drill and solution experience, said the platform,
said. We often implement grade control blast systems arrived at an innovative grade which serves as a cyber hub and can be
systems during the early stages of the control workflow that was presented at our premises- or cloud-based, enables users
mining process when not all Fleet Man- annual MineQuest conference and resulted at disparate locations to access a single
agement Systems (FMS) or other systems in a 12% cost savings for the drill and blast version of the truth.
are in place. However, because our system teams, Gering said. All of this was done The platform is really about technical
is configurable, we can easily incorporate by the users themselves and reinforces our collaboration, data management and con-
new systems in the grade control workflow goals for making tools that are easy to use tinuous innovation he said. Being able
as they are implemented or come online. and easy to implement. Therein lies the to ensure you are centralizing and sharing
The savings are real, he said. Informa- utility of the platform. It empowers users to data that are reliable and up-to-date is a
tion and data-sharing enables engineers gain control of their workflows and to make key expectation of mining companies, and
to spend less time manually transferring them faster, easier and safer, he said. this is something we are providing through
data. Ive seen sites where users are MSSO continues to add value to the mine the 3DEXPERIENCE Platform.
manually copying tonnages, grade, and planning workflow in many areas. The platform facilitates fluid naviga-
plant information or using a variety of tion to the apps, including social and col-
Excel sheets and csv files, Gering said. Dassault Offers Virtual laborative apps, intelligence apps, simu-
This takes time and could compromise Reality lation apps and 3-D modeling apps, like
data integrity. Engineers should be spend- Centered on geology and grade control, Surpac. The company described Surpac
ing time analyzing data and improving Surpac is one of Dassault Systmes mine as the worlds most popular geology and
processes instead of copying data manu- planning software applications offered un- mine planning software, which delivers
ally. Consider for example, Gering said, der its Geovia brand, which also includes efficiency and accuracy through ease-of-

Surpac, geology and mine planning software under the Geovia brand, is slated for two updates in 2017, Andy Mulholland, Dassault Systmes, portfolio management director,
says. The future for GEOVIA in mining centers on the Dassault Systmes 3DEXPERIENCE platform, a unique business platform delivered both on-cloud and on-premises, and
which will facilitate collaboration and integration across the entire mine value chain. (Photo: Dassault Systmes)

30 E&MJ FEBRUARY 2017 www.e-mj.com

EMJ_pg28-33.indd 30 2/9/17 9:38 AM


GRADE CONTROL

use, powerful 3-D graphics, and workflow Data can also be used directly from other live in a virtual reality environment. In
automation that can be aligned to compa- formats with the data plug-ins module. short, miners can shape a digital mine so
ny-specific processes and data flows. Geovia software is the recognized real they can virtually blast it.
Drilling data, as well as performance world leader of integrated geology and The concept of a digital twin is a true
data captured by the equipment, is as- mine planning solutions, Mulholland singularity whose significance has been
similated and managed by the 3DEXPE- said. MineSched delivers interoperabil- marginalized in the ceaseless eruption of
RIENCE Platform. Like its competition, ity through integration with every major high-tech innovations comprising the on-
Surpac reconciles drill hole and sampling geology and mine planning software pack- going space age revolution. Its conceptual
data with virtual mine models, and can age on the market. InSite integrates predecessor is the legal entity, defined
create user-friendly, 3-D graphics, to in- with almost any data source, providing by Blacks Law as an entity, other than
clude short-term block models that are a single view of the truth with a holistic a natural person, who has sufficient ex-
data-rich, colorful and scalable. These view of the operations from pit to port. istence in legal contemplation that it can
models are further informed by data from Make that virtual pit to port. Dassault function legally, be sued or sue, and make
mines all over the world to ensure a grade Systmes announced January 5 that decisions through agents as in the case
control framework that provides a clear un- 3DEXPERIENCE Platform users can now of corporations. Whereas maritime law
derstanding of grade variations, and allows view, explore and validate product designs birthed the legal entity, big data birthed
for improved decision making to drive prof- in immersive virtual reality at any stage of the digital twin, a dynamic but defined
itability, the company reported. the product development process with sup- cyber entity, be it a person or a compa-
GEOVIA technology allows users to port from the HTC Vive Business Edition ny, with sensor and sampling data instead
import data from various sources, man- virtual reality system. Users don a head- of blood, and pixels instead of skin cells.
age survey station data and interface set and work at their desktop, from which Users can operate and experiment on it.
with data collectors, Andy Mulholland, they can access, view and explore a native From it they can extrapolate and forecast.
portfolio management director, said. Se- virtual model, giving an enhanced spa- If the digital twin is the logical out-
lecting from a variety of instrument types tial impression for a deeper understanding come of the rise of the Internet of Things
and reduction techniques, surveyors can of an objects depth, solidness and design (IoT) and the resulting deluge of data that
establish profiles to streamline the data that cannot be achieved with a computer has purged mining of guesswork and esti-
entry process or download measurements screen alone, the company reported. mates, then the 3DEXPERIENCE Mine is
directly from total stations and GPS re- Broken down, this means a decentral- the ark for plying those waters, Jeanne
corders, he said. Triangulated surfac- ized enterprise can operate out of a cen- said. Mining companies are facing larg-
es can be created from status maps and tralized cyber hub, the 3DEXPERIENCE er and large databases all the time, he
then used to determine volumes moved Mine, and use a common software suite said. We are talking about big data and
between two or more working periods. to shape its digital twin, which can now IoT. That is why it is crucial to leverage all
this data together using a single appro-
priate framework. That is the idea of the
3DEXPERIENCE Mine.
Three updates to the Geovia brand
in 2017 are expected, Mulholland said.
GEOVIA is introducing a new cloud-based
next-generation rapid geological modeling
capability, to be delivered under an in-
novative SaaS (Software-as-as-Service)
model on the 3DEXPERIENCE platform
and seamlessly integrated to GEOVIAs
desktop applications, he said. Addi-
tionally, 2017 will see the introduction of
advanced point cloud technology into Sur-
pac for processing and utilizing the vast
amount of scanning information available
from unmanned aerial vehicle drone sur-
veys and vehicle mounted underground
survey equipment. Also coming in 2017
is a new algorithm for GEOVIA Whittle that
greatly reduces the time taken to develop
a strategic mine plan thus allowing input
sensitivity analyses to be completed in
rapid succession giving the mine planner
The HTC Vive Business Edition headset enables 3DEXPERIENCE Platform users to plug and play an HTC Vive a readymade library of off-the-shelf plans
Business Edition head-mounted display and work at their desktop with natural navigation in a stereoscopic virtual that can be used as and when the operat-
reality environment, Dassault Systmes reports. (Photo: HTC) ing environment changes.

32 E&MJ FEBRUARY 2017 www.e-mj.com

EMJ_pg28-33.indd 32 2/9/17 9:38 AM

You might also like