Lampiran 1.

Time Frame Aktifitas Praktek Kerja Lapangan

TIME FRAME PRAKTEK KERJA LAPANGAN PT PAMAPERSADA SITE KIDECO


Juli Agustus September
NO KEGIAT AN
29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
Administrasi

Induksi P ama
1
Induksi Kideco

P engenalan Struktur Departemen

Observasi Drilling

Orientasi P ekerjaan Drilling

P engenalan SOP Drilling

P engenalan Unit P emboran

Aktifitas persiapan lokasi bor


2
Operasional P emboran

Cycle T ime

Key P erformance Indicator Drilling

Rate Of P enetration Drilling

P aska Drilling

Observasi Blasting

Orientasi SOP dan P ekerjaan Blasting

P engenalan P eralatan Blasting

3 P ersiapan Blasting

Orientasi Lapangan Blasting

P roses P ekerjaan Blasting

P aska Blasting

Collapse Data Report


4
P enyusunan data

5 Final P resentation
PLAN
AKTUAL
Lampiran 2. Drilling Performance

Tabel Observasi Drilling Lokasi 4G 9-10 Nama


Sajiyana
Operator
Dri l l Ti me Ja ck Na i k Tra vel Keda l a ma n Cycl e Ti me
No Ja ck Turun (Deti k) Material Claysand Stone
(deti k) (Deti k) (Deti k) (m) (Meni t)
1 25 433 17 55 8.5 8.83 Jenis Bit VAREL TRICONE 7 7/8"
2 27 365 17 43 8.5 7.53 Unit Drill TEREX REEDRILL SKF-11 DR095
3 24 351 14 44 8.5 7.22 Pull Down 600-700
4 23 411 16 48 8.5 8.30 Rotary 1800-2000
5 21 343 11 46 8.5 7.02 Air Flushing 80
6 19 385 13 42 8.5 7.65 Hidrolik 1000
7 25 311 12 41 8.5 6.48
8 19 304 11 43 8.5 6.28
9 23 284 12 45 8.5 6.07 UA (%) 67%
10 19 257 13 39 8.5 5.47 PA (%) 100%
11 22 290 13 42 8.5 6.12 Proty (m)
12 17 383 16 39 8.5 7.58 Produksi (m) 2.83
13 25 302 16 37 8.5 6.33
14 17 357 14 29 8.5 6.95
15 30 337 22 38 8.5 7.12 Total WH
135.60
16 22 395 29 37 8.5 8.05 (menit)
17 25 281 18 28 8.5 5.87 Total Depth
18 33 291 14 23 8.5 6.02 (m) 170
19 24 244 16 28 8.5 5.20
20 33 281 16 1.07 8.5 5.52
Avera ge 23.65 344.25 15.5 37.4035 8.5 6.78

Total Depth 1 Shift HM Awal Drill HM Akhir Drill Rate of Penetration


450.5 6510.1 6515.2 88.33333333
Perhitungan UA
Tabel UA Drilling RTSG DR 095
12 Jam / 720
1 Shift ( Siang )
Menit
Item
Waktu (Menit)
No Delay
1 a. P2H 15
2 b.Isi Solar
3 c. Cek U/C
4 d. Pindah Alat 20
5 e. Tunggu Alat Lain 45
6 f. Survey
7 g. Tunggu Blasting 40
8 h. Cuci Unit
9 i. Makan dan Istirahat 60
10 j. Over Capacity
11 k. Tunggu Operator
12 l. Ganti Shift 60
No Idle
1 a. Hujan
2 b. Demo
3 c. Masalah Customer
Total 240
Total Hambatan 240
Jam Kerja 720
Jam Kerja Efektif 480
UA (%) 67%
PA (%) 100%
Target UA Drilling / Bulan 55%
Lampiran C. Blasting Resume

Tabel Resume Aktivitas Peledakan

Geometri (m) Fragmentasi (mm) Efek Peledakan


Total Powder Blast Pola
No Lokasi 0- 60- 120- 180- PVS
Hole B S H Factor Ratio Peledakan G(mm) Noise(Dsb)
60 120 180 240 (mm/jam)
1 7B 1WALL 84 8 9 8 0.2 4.99 SEMI BOXCUT 30% 70% - - 2.5 0.16 114
2 SMD2 9W SELATAN 72 8 9 8 0.19 5.26 EXCELON 45% 55% - - 2.4 0.2 114
3 2C3 15/16 80 8 9 8 0.17 5.76 SEMI BOXCUT 30% 70% - - 2.3 0.23 114
4 7A 15-16 40 8 9 8 0.2 5.07 SEMI BOXCUT 55% 45% - - 2.2 0.15 112
5 RTSG 13A/13 70 8 9 8 0.21 4.74 SEMI BOXCUT 30% 70% - - 2.1 0.19 115
6 9E1 P.15 100 8 9 8 0.18 5.53 EXCELON 40% 60% - - 2.5 0.2 116
7 7B 4-5 UTARA 80 8 9 8 0.17 5.76 SEMI BOXCUT 70% 30% - - 2.2 0.19 112
8 RTS G 6W 101 8 9 8 0.17 5.76 SEMI BOXCUT 50% 50% - - 2 0.2 98
9 9E1 CB 94 8 9 8 0.2 5.11 SEMI BOXCUT 45% 55% - - 2.3 0.23 99
10 2C3 16-18 34 8 9 8 0.17 5.76 SEMI BOXCUT 55% 45% - - 2 0.24 100
11 9E1 16-18 75 8 9 8 0.18 5.48 SEMI BOXCUT 78% 22% - - 2.12 0.11 94
12 7B 1/1 P1 82 8 9 8 0.17 5.76 SEMI BOXCUT 43% 58% - - 2.1 0.13 96
13 SMD 2 9W 34 8 9 8 0.23 4.43 EXCELON 70% 30% - - 2.3 0.23 90
14 7B 4-5 96 8 9 8 0.19 5.18 SEMI BOXCUT 20% 80% - - 2 0.21 95
15 2C3 CB 76 8 9 8 0.17 5.76 EXCELON 25% 75% - - 2 0.16 99
16 RTS G 6-6 90 8 9 8 0.18 5.67 SEMI BOXCUT 20% 80% - - 3 0.18 103
17 7A 10-13A 50 8 9 8 0.19 5.34 SEMI BOXCUT 55% 45% - - 2 0.14 108
18 9E1 P 15 86 8 9 8 0.19 5.37 SEMI BOXCUT 35% 65% - - 2 0.16 110
19 SMD 2 8-9 50 8 9 8 0.17 5.76 AXCELON 40% 60% - - 2.1 0.19 115
20 7B 1-2 86 8 9 8 0.17 5.76 SEMI BOXCUT 70% 30% - - 2.2 0.21 101
21 SMD 2 8-9 120 8 9 8 0.18 5.54 EXCELON PRESPLIT 20% 80% - - 2.3 0.016 98
22 2C3 CB 50 8 9 8 0.17 5.76 SEMI BOXCUT 25% 75% - - 2.3 0.17 90
23 9E1 P15 150 8 9 8 0.19 5.33 SEMI BOXCUT 20% 80% - - 2.6 0.2 99
24 RTS G 6-6 71 8 9 8 0.19 5.15 AXCELON 55% 45% - - 2.3 0.23 91
25 7A 13/14 53 8 9 8 0.17 5.76 SEMI BOXCUT 55% 45% - m- 2.1 0.12 92
LAMPIRAN D

SPESIFIKASI DRILLING TEREX REEDRILL SKF-11


LAMPIRAN E

SPESIFIKASI BUCYRUS SKF


REEDRILL SKF 50
Reedrill : Merk product
S : Stone ( batuan )
K : Killer ( pembunuh / penghancur )
F : Fantastic ( tak terbatas / tak terhingga )
50 : Pull Down(1000xNumeric Name)

General Location Drawing


Tampak samping kanan
General Location Drawing
Tampak samping kiri
General Location Drawing
Tampak atas