4.1 Objective

This Method Statement serves to document the procedure for the installation and testing
of Fan Coil Unit (FCU) on site.

4.2 Selection

AHU shall be selected based on Consultant calculated capacity. Coils will be selected
based on a 10F drop across it.

4.3 Submission

All material and installation method statements shall be submitted to the respective
consultant prior to installation works.

4.4 Manufacturing

All manufacturing shall be carried out off site in accordance to the factory quality
procedures.

4.5 Transportation and Storage

FCU shall be transported via lorry to site protected against the element of weather.

4.6 Installation

4.6.1 Installation Process

FCU shall be supported at 4 location. Length of hangar rods and size of FCU should be
used to determine the distance between hangar rods. FCU should come with extension
piece if necessary. Positions of anchor bolts are marked on the slab above prior to
drilling. Anchor-bolts are tightened with the mild steel channel where required. The
hangar rods are then bolted onto the channel. The FCU is hung onto the 4tie rods with
rubber pad.

Pipework shall include the necessary fittings, valves, strainers with consideration to
straight length requirement for modulating valves.

Ductwork shall be installed in accordance to the Method Statement for Ductwork.

4.7 Quality Control

Quality Control shall start from the factory, delivery until installation.
Quality Control shall include the following activity :
a) Checking of FCU for any damage to coil, dents improper sealing etc.
b) Checking of installation and connection to ductwork and pipework.
c) Checking of individual FCU operation and T & C.