Petron

WORK TO GO LIST
DATE: WORK TO GO LIST No :

PROJECT: AL TAWEELA ALUMINA


CLIENT: BPJV
ITEM: STRUCTURAL STEEL
LOCATION: 240 UNIT 1

SYSTEM #: 240 AE GRID 1 TO 3 (I-L)

S.No ITEM No. DESCRIPTION LOCATION ACTION REMARKS

GRID I TO J

V2148 VERTCIAL BRACING TO BE INSTALLED G-1

V2149 VERTCIAL BRACING TO BE INSTALLED G-1

V2147 VERTCIAL BRACING TO BE INSTALLED G-1

V2115 VERTCIAL BRACING TO BE INSTALLED G-2

V2120 VERTCIAL BRACING TO BE INSTALLED G-2


BEAM
TO BE
B4235 G-2
INSTA
LLED
V2117 VERTCIAL BRACING TO BE INSTALLED G-2

V2143 VERTCIAL BRACING TO BE INSTALLED G-3

C2127 COLOUMN TO BE INSTALLED G-3

B2494 BEAM TO BE INSTALLED G2-3

H2221 HORIZONTAL BRACING TO BE INSTALLED (EL-13.25) G1-2

H2215 HORIZONTAL BRACING TO BE INSTALLED (EL-13.25) G1-2

H2217 HORIZONTAL BRACING TO BE INSTALLED (EL-13.25) G1-2

H2215 HORIZONTAL BRACING TO BE INSTALLED (EL-13.25) G1-2

H2220 HORIZONTAL BRACING TO BE INSTALLED (EL-13.25) G1-2

H2239 HORIZONTAL BRACING TO BE INSTALLED (EL-13.25) G2-3

H2237 HORIZONTAL BRACING TO BE INSTALLED (EL-13.25) G2-3

H2237 HORIZONTAL BRACING TO BE INSTALLED (EL-13.25) G2-3

H2236 HORIZONTAL BRACING TO BE INSTALLED (EL-13.25) G2-3

H2208 HORIZONTAL BRACING TO BE INSTALLED (EL-13.25) G2-3

H2227 HORIZONTAL BRACING TO BE INSTALLED (EL-13.25) G2-3

H2209 HORIZONTAL BRACING TO BE INSTALLED (EL-13.25) G2-3

H2209 HORIZONTAL BRACING TO BE INSTALLED (EL-13.25) G2-3

H2209 HORIZONTAL BRACING TO BE INSTALLED (EL-13.25) G2-3

H2225 HORIZONTAL BRACING TO BE INSTALLED (EL-13.25) G2-3

H2228 HORIZONTAL BRACING TO BE INSTALLED (EL-13.25) G2-3

H2226 HORIZONTAL BRACING TO BE INSTALLED (EL-13.25) G2-3

H2229 HORIZONTAL BRACING TO BE INSTALLED (EL-13.25) G2-3

H2229 HORIZONTAL BRACING TO BE INSTALLED (EL-13.25) G2-3

H2224 HORIZONTAL BRACING TO BE INSTALLED (EL-13.25) G2-3

H2214 HORIZONTAL BRACING TO BE INSTALLED (EL-13.25) G2-3

H2214 HORIZONTAL BRACING TO BE INSTALLED (EL-13.25) G2-3

H2224 HORIZONTAL BRACING TO BE INSTALLED (EL-13.25) G2-3

B2485 BEAM TO BE INSTALLED (EL 13.25) G2-3


B2484 BEAM TO BE INSTALLED (EL 13.25) G2-3

B2484 BEAM TO BE INSTALLED (EL 13.25) G2-3

GRID J-K

V2148 VERTICAL BRACING TO BE INSTALLED G-1

V2147 VERTICAL BRACING TO BE INSTALLED G-1

V2149 VERTICAL BRACING TO BE INSTALLED G-1

V2115 VERTICAL BRACING TO BE INSTALLED G-2

V2120 VERTICAL BRACING TO BE INSTALLED G-2

V2117 VERTICAL BRACING TO BE INSTALLED G-2

B2502 BEAM TO BE INSTALLED G-2

B2502 BEAM TO BE INSTALLED G2-3

V2022 VERTICAL BRACING TO BE INSTALLED G2-3

B2415 BEAM TO BE INSTALLED G2-3

H2220 HORIZONTAL BRACING TO BE INSTALLED (EL-13.25) G1-2

H2215 HORIZONTAL BRACING TO BE INSTALLED (EL-13.25) G1-2

H2217 HORIZONTAL BRACING TO BE INSTALLED (EL-13.25) G1-2

H2217 HORIZONTAL BRACING TO BE INSTALLED (EL-13.25) G1-2

H2215 HORIZONTAL BRACING TO BE INSTALLED (EL-13.25) G1-2

H2220 HORIZONTAL BRACING TO BE INSTALLED (EL-13.25) G1-2

H2217 HORIZONTAL BRACING TO BE INSTALLED (EL-13.25) G1-2

H2239 HORIZONTAL BRACING TO BE INSTALLED (EL-13.25) G2-3

H2237 HORIZONTAL BRACING TO BE INSTALLED (EL-13.25) G2-3

H2237 HORIZONTAL BRACING TO BE INSTALLED (EL-13.25) G2-3

H2238 HORIZONTAL BRACING TO BE INSTALLED (EL-13.25) G2-3

H2208 HORIZONTAL BRACING TO BE INSTALLED (EL-13.25) G2-3

H2227 HORIZONTAL BRACING TO BE INSTALLED (EL-13.25) G2-3

H2209 HORIZONTAL BRACING TO BE INSTALLED (EL-13.25) G2-3

H2209 HORIZONTAL BRACING TO BE INSTALLED (EL-13.25) G2-3

H2225 HORIZONTAL BRACING TO BE INSTALLED (EL-13.25) G2-3

H2225 HORIZONTAL BRACING TO BE INSTALLED (EL-13.25) G2-3

H2228 HORIZONTAL BRACING TO BE INSTALLED (EL-13.25) G2-3

H2229 HORIZONTAL BRACING TO BE INSTALLED (EL-13.25) G2-3

H2224 HORIZONTAL BRACING TO BE INSTALLED (EL-13.25) G2-3

H2214 HORIZONTAL BRACING TO BE INSTALLED (EL-13.25) G2-3

H2214 HORIZONTAL BRACING TO BE INSTALLED (EL-13.25) G2-3

H2224 HORIZONTAL BRACING TO BE INSTALLED (EL-13.25) G2-3

H2229 HORIZONTAL BRACING TO BE INSTALLED (EL-13.25) G2-3

H2226 HORIZONTAL BRACING TO BE INSTALLED (EL-13.25) G2-3

H2225 HORIZONTAL BRACING TO BE INSTALLED (EL-13.25) G2-3

B2484 BEAM TO BE INSTALLED (EL 13.25) G2-3

B2485 BEAM TO BE INSTALLED (EL 13.25) G2-3


B2484 BEAM TO BE INSTALLED (EL 13.25) G2-3
GRID K-L

M2028 PIPE SUPPORT TO BE INSTALLED G-1

B4174 BEAM TO BE INSTALLED G-2

B2521 BEAM TO BE INSTALLED G-2

V2143 VERTICAL BRACING TO BE INSTALLED G-3

C2127 COLUMN TO BE INSTALLED G-3

B2355 BEAM TO BE INSTALLED G-3

B4362 BEAM TO BE INSTALLED G1-2

B4356 BEAM TO BE INSTALLED G1-2

B2143 BEAM TO BE INSTALLED G2-3

H2221 HORIZONTAL BRACING TO BE INSTALLED (EL-13.25) G1-2

H2216 HORIZONTAL BRACING TO BE INSTALLED (EL-13.25) G1-2

H2217 HORIZONTAL BRACING TO BE INSTALLED (EL-13.25) G1-2

H2215 HORIZONTAL BRACING TO BE INSTALLED (EL-13.25) G1-2

H2220 HORIZONTAL BRACING TO BE INSTALLED (EL-13.25) G1-2

H2206 HORIZONTAL BRACING TO BE INSTALLED (EL-13.25) G1-2

H2223 HORIZONTAL BRACING TO BE INSTALLED (EL-13.25) G1-2

B2116 BEAM TO BE INSTALLED (EL -13.25) G1-2

B2115 BEAM TO BE INSTALLED (EL -13.25) G1-2

Remarks :- FOR ELEVATION +9.280 PLEASE REFER THE DRAWING (240AE-S0-S01-20006-001 )

Petron BPJV Owner


Name:

Sign:

Date:

Doc.Ref: PEC-BPJV-C781-Form.002 Rev 0 Date: 04.06.2016