Following defects need to be attended during shut down on

priority

1. Primary water flow low indication appearing frequently.


2. EX-139 motor not available.
3. LPBP Spray line frequently leakage while it operates.
4. GTR Xmer gauge glass oil level( MOG) cleaning to be done.
5. CEP drain to be cleaned by submersible pump.
6. Drain provided before isolating valve of AS2.
7. Boiler filling pump heavy gland leakage.
8. ACW outlet return line leakage at turbine lift.