You are on page 1of 1

1300 5000

2300 2700 1300 2300 2700

1500
CB
CO CO

WC

CO

BEDROOM 1 LEGEND
2100

CO

4600
FD

FD

LC DC
CB CATCH BASIN
SEPTIC TANK
KITCHEN CO CLEAN OUT

5700
LAV WC

2600
LAV LAVATORY
CO WET VENT

FD FLOOR DRAIN

7000
WET VENT

FD

T&B WC WATER CLOSET


5900

SEWAGE LINE
CB LAV WET VENT
LIVING ROOM DINING
3800

2400

2400
CB

SEWAGE LINE MASTER


BEDROOM

1300
CB

3601 2700 3600 2700

TO PUBLIC DRAINAGE LINE

TO PUBLIC SEWAGE LINE

SEWAGE & STORM DRAINAGE LAYOUT SEWAGE & STORM DRAINAGE LAYOUT
1 (GROUND FLOOR) 2 (SECOND FLOOR)
SCALE 1:100 M SCALE
C 2 C 2 1:100 M

NAME: CRUZ, KEN HAROLD BOMBEO PROJECT TITLE: SHEET CONTENT: GRADE:
BULACAN STATE UNIVERSITY
COLLEGE OF ARCHITECTURE & FINE ARTS
SECTION: BSAR-4B
SEWAGE & STORM DRAINAGE LAYOUT
(GROUND FLOOR)
DATE: NOVEMBER 23 2017 SEWAGE & STORM DRAINAGE LAYOUT
THESE DRAWINGS, AS INSTRUMENTS OF SERVICE, ARE THE PROPERTY AND DOCUMENTS OF THE
DESIGNER. IT SHALL BE UNLAWFUL FOR ANY PERSON WITHOUT THE WRITTEN CONSENT OF THE DESIGNER OR
PROPOSED TWO STOREY RESIDENCE (SECOND FLOOR)
AUTHOR OF SAID DOCUMENTS TO DUPLICATE OR COPY SAID INSTRUMENTS.

SUBMITTED TO: AR. MACGIL DE LEON

You might also like