Professional Documents
Culture Documents
CEIE 576
Construction has been a way of life since man knew how to create things. Construction
has brought us so many magnificent ideas and monuments that exist today from the Great
Pyramids of Giza to the Pisa Tower. Construction has brought forth these monuments and
brought and inspired the minds of engineers of future generations into what to build for the next
generation to marvel and be inspired. One of these companies that hoping to achieve this idea in
their work is Whitman, Requardt and Associates. Whitman, Requardt and Associates was
founded by a man named Ezra Whitman. According to the Whitman, Requardt and Associates
website he is known as pivotal figure in the design of the Baltimores Montebello Water
treatment Plant and the Back river Wastewater Treatment plant. It continues with stating that the
Montebello has been described as one of the biggest and most important undertakings in the
history of the city as it meant pure drinking water for all of Baltimore. It significantly reduced
deaths from typhoid that prior to 1915, killed almost 30,000 people. At its opening, Mayor
Preston credited Whitman, Requardt and Associates founder, Ezra Whitman. He stated, More
than four years ago, when I went into office, I appointed as Water Engineer Ezra B. Whitman, a
Baltimore boy who had won his laurels in the new sewerage works. It was an experimental
appointment, but I want to say that it was due to him, more than to any other one man, that the
credit for putting this great work through without a hitch is due.
1
(https://www.wrallp.com/about-us/100-year-tradition) The work that Ezra accomplished allowed
him to establish his own company and set the standards of the industry.
One of the employees who embrace this ideal that was set forth by the founder is William
Atkins, also known as Bill. He started in the industry as an Inspector trainee and worked all the
way to a Construction Manager. He started with VDOT in 2000 and was promoted to an
inspector in 2002, a Sr Inspector in 2004. A listing came out for a CM position in the Design
Build Section for VDOT so he applied for it and got the job in 2007. He obtained his CCM
(certified construction manager) in 2011. Then in 2016 decided to explore the private sector and
applied for a potion at Whitman, Requardt and Associates and started working for the company
as a construction manager 2. Bidding is a process which submits the proposal of tender for
blueprints, cost estimation and also material take off. The type of project to be taken and decision
is made by the vice president of CMI, Brian A. Henschel, in VA for the Whitman, Requardt and
Associates. Generally Whitman, Requardt and Associates find the project in all ways like VDOT
home page, local assistance home page, newspapers and also from lot of words while networking
at conferences. Theyve also received the projects from the same clients many times, as the result
of good customer satisfaction. For the bidding process the initial steps they take is to check
availability of people and also revenue. The bids are always carried on profit priority, usually
they carried out team work like set of people/parties are assigned for the bid process. For the
success and well being of the company the employees always have open door policy availability
round the clock. According to Mr Bill the hardest bid would be fine line of making money and
2
Finally, Whitman, Requardt and Associates theyve been successful in the industry for
their extreme commitment given by their employees. By allowing the discussions of projects to
be focused among profit will become secondary according to Bill if it allows the development of
relationship from clients. Although the decision are taken by the management members not
every hand gets a decision but if that were to occur there would no agreement in the project to
pursue. By the repeated clients we can say it has given a good customer satisfaction.
References:
wrallp.com/about-us/100-year-tradition.
https://www.linkedin.com/in/william-bill-atkins-ccm-22421b88/