Authors: Alex Barnhart, Mazin AlZidjali, Kelsi Moser, Michael Schausten

Development
Schedule
9/2/2017 9/17/2017 10/2/2017 10/17/2017 11/1/2017 11/16/2017 12/1/2017 12/16/2017
Restatement of Deliverables

Meet with Dr. Santi

Circuit Boosts 12VDC to 120VAC

Use Circuit to Power Lamp

Use Circuit to Power Leaf blower

Have Product Packaged and Ready

Status Report #2

Invention Disclosure

Utility Assessment Report

Duration
Task Name Start End (days)

Restatement of Deliverables 9/5/2017 9/8/2017 3

Ensure the circuit is functional 9/8/2017 9/12/2017 4

Meet with Dr. Santi 9/12/2017 9/15/2017 3

Circuit Produces AC Signal 9/15/2017 9/22/2017 7

Circuit Boosts 12VDC to 120VAC 9/22/2017 10/2/2017 10


Status Report #1 9/29/2017 9/29/2017 1
Use Circuit to Power Lamp 10/2/2017 10/6/2017 4
Subsystem Validation 10/2/2017 10/11/2017 9
Use Circuit to Power Leaf blower 10/6/2017 10/13/2017 7
Peer Evaluations 10/11/2017 10/13/2017 2
Have Product Packaged and
Ready 10/11/2017 11/3/2017 23
Interim Progress Review 10/31/2017 11/2/2017 3
Status Report #2 11/3/2017 11/3/2017 1
Technical Manual 11/3/2017 11/13/2017 11
Invention Disclosure 11/3/2017 11/15/2017 13
Final Demonstration 11/3/2017 11/29/2017 26
Utility Assessment Report 11/29/2017 12/1/2017 3
Authors: Alex Barnhart, Mazin AlZidjali, Kelsi Moser, Michael Schausten