Petr 425

Completion Project
Due
12/06/16

Try Hard St 20B

TD 6895 KB PBTD 6845 KB


KB 10
Casing 51/2 17#/ft top and bottom
Cement top calculated to be 6554 ft from surface.
Well was originally completed 6795-6754, this zone has been depleted.

New Pay zones


1) 5482-90 KB, sandstone 10% porosity Sw .40 Dry gas
2) 5505-10 KB, sandstone 8% porosity Sw .40 Dry Gas

This well will be fraced, the area rule of thumb for this formation is
1500 gallons/ft of net pay.

A complete completion procedure for this well.