Professional Documents
Culture Documents
Fixed Fire Suppression Systems Testing Schedule
Fixed Fire Suppression Systems Testing Schedule
Policy
All fixed fire suppression systems shall be inspected, maintained and tested in accordance with this policy and procedure.
1. Scheduling and coordinating the required inspection, and the maintenance and testing of all fixed protection systems in
accordance with this policy;
2. Restoring any fixed fire protection to its normal operating condition after any maintenance, testing or usage;
3. Notifying Environmental Health and Safety during any scheduled (24 hours notice required) or unscheduled impairment
for a Red Tag Permit;
4. Notifying Environmental Health and Safety when all impairment is corrected; and
5. Providing documentation to Environmental Health and Safety when the required inspection, maintenance and testing is
performed.
Environmental Health and Safety is responsible for:
1. Reporting any questionable conditions discovered during the Annual Fire/General Safety Review to the responsible
department;
2. Responding to requests for Red Tag Permits, in a timely manner;
3. Making periodic tours of the areas during the shutdown of a fixed system;
4. Placing a copy of a Red Tag Permit in the lock box whenever one is issued;
5. Responding to requests for removal of fire protection locks;
6. Conducting monthly inspections of fire protection to ensure all valves are secured in the open position with appropriate
locks and chains;
7. Documenting Red Tag Permit issuances for review by University Insurer, City of Chicago Fire Department and City of
Chicago Fire Alarm Center;
8. Reviewing documentation from appropriate departments during the annual fire/general safety review;
9. Informing the City of Chicagos Office of Emergency Communications when a fire protection system is taken out of
service;
10. Informing the Universitys Dispatch Center when a fire protection system is taken out of service;
11. Informing the Universitys insurer when a fire protection system is taken out of service;
12. Informing the Universitys insurer when an acceptance test will be performed on a fixed fire suppression system; and
13. Reviewing the policy and procedure to ensure compliance.
Licensed contractors are responsible for:
1. Performing appropriate inspection and maintenance of fixed fire suppression systems when scheduled by appropriate
department; and
2. Providing documentation for appropriate departments when inspections and maintenance are complete.
Contractors and sub-contractors are responsible for complying with these procedures.
1. Sprinkler systems;
2. Standpipe and fire hose systems;
3. Fire pumps; and
4. Fixed chemical extinguishing systems.
All fixed fire suppression systems shall have the appropriate inspection and testing performed as outlined per this policy. The
following provides a description of what the inspections involve and the type of personnel required to conduct these
inspections. Responsible personnel shall utilize the following fixed fire suppression checklists:
Sprinkler Systems
Inspections
All sprinkler systems shall have a monthly and annual inspection performed. The following provides a description of what the
inspection involves and the type of personnel required to conduct these inspections.
Monthly Inspection
All sprinkler systems shall have a monthly inspection performed by an outside contractor licensed to conduct such
inspections.
The inspections of the spinkler system shall be documented on the Sprinkler System Checklist form and shall be filed in a
binder that is kept in the same room as the fire pump.
The monthly inspection shall consist of the following:
1. Ensuring all gauges on a dry pipe sprinkler system are in good condition and maintaining normal pressure;
2. Ensuring all valves greater than one and one-half inches are in the open and locked position;
3. Ensuring all gauges on a wet pipe sprinkler system are in good condition and maintaining normal pressure; and
4. Ensuring all alarm devices are free from damage and all electrical connections are secure.
Testing
The following provides a description of the required testing for sprinkler systems. All required testing shall be arranged by
the responsible department.
Acceptance Testing/Upgrades
All sprinkler systems installed in new construction or upgrading of a system shall have an acceptance test completed prior
to being placed into service. The acceptance test shall be arranged by the project manager or in conjunction with the
contractor installing the system. Upon scheduling of an acceptance test, the project manager shall notify Environmental
Health and Safety. Environmental Health and Safety shall notify the Universitys insurer.
The acceptance test procedures for sprinkler systems shall be conducted in accordance with the City of Chicago Fire
Prevention Bureau. The Bureau follows the criteria set forth in Chapter 13 Installation of Sprinkler Systems of the National
Fire Protection Association code and standards.
Quarterly Testing
All sprinkler system alarm devices such as water flow alarms and pressure switches shall be tested every three months. The
testing shall be performed by a person knowledgeable in the operation and function (e.g., contractor) of sprinkler systems.
Criteria for quarterly testing shall be in accordance with Chapter 25 Inspection, Testing and Maintenance of Water- Based
Fire Protection Systems of the National Fire Protection Association code and standards.
Annual Testing
A main drain test shall be performed on sprinkler systems annually to determine if the system is free from obstruction. This
test shall be performed by a person knowledgeable in the operation and function (e.g., contractor) of a sprinkler system.
Criteria for main drain testing shall be in accordance with Chapter 25 Inspection, Testing and Maintenance of Water-Based
Fire Protection Systems of the National Fire Protection Association code and standards.
Twenty-Year Test
Where fast response sprinkler heads have been in service for twenty years, they shall be replaced or representative samples
shall be sent to a recognized testing laboratory.
Where the representative sample of the sprinkler heads fails to meet the test requirements, all sprinkler heads the sample
represents shall be replaced by the contractor.
Test procedures shall be repeated every ten years thereafter.
If the sprinkler head is going to tested instead of replaced, testing shall be performed using the same sampling methodology
as indicated in the previous section.
Obstruction Investigation
An obstruction investigation shall be conducted by the contractor to ensure that sprinkler system piping remains clear of all
obstructive foreign matter. An obstruction investigation shall be conducted on sprinkler systems if one of the following
conditions exists:
1. Defective intake screens on a fire pump taking suction from open bodies of water;
2. Discharge of obstructive material during routine water tests;
3. Foreign materials in fire pumps, dry valves or in check valves;
4. Heavy discoloration of water during drain tests or plugging of inspectors test connections;
5. Plugged sprinklers;
6. Plugged piping in sprinkler systems dismantled during building renovation projects;
7. Failure to flush yard piping or surrounding public mains following new installation or repairs;
8. A record of broken public mains in the vicinity;
9. Abnormally frequent false-tripping of dry pipe valve(s);
10. A system is returned to service after an extended period of downtime (greater than one year); and
11. There is reason to believe that the sprinkler system contains sodium silicate or its derivatives.
Flushing Procedures
If an obstruction investigation indicates the presence of sufficient material to obstruct sprinklers, conduct a complete flushing
program every five years. The work shall be performed by a person having knowledge in the operation and function (e.g.
contractor) of a sprinkler system.
Criteria for sprinkler system flushing shall be in accordance with Chapter 25 Inspection, Testing and Maintenance of Water-
Based Fire Protection Systems of the National Fire Protection Association code and standards.
When the control valve for the standpipe system is located within a stairwell, the maximum length of hose shall not exceed
100 feet. If the control valve is located in areas other than the stairwell, the length of hose shall not exceed 75 feet.
All fire hose on Class II and Class III standpipe systems shall be equipped with a shut-off type nozzle.
All valves greater than one and one-half inches are locked in the open position with a chain and sturdy lock. The removal of
such locks shall be under the direction of the shop supervisor.
Testing
Acceptance Test
All standpipe and hose systems installed in new construction or upgrading of a system shall have an acceptance test
completed prior to being placed into service. The acceptance test shall be arranged by the project manager or in conjunction
with the contractor installing the system. Upon scheduling of an acceptance test, the project manager shall notify
Environmental Health and Safety. Environmental Health and Safety shall notify the Universitys insurer.
The acceptance test procedures for standpipe systems shall be conducted in accordance with the City of Chicago Fire
Prevention Bureau. The Bureau follows the criteria set forth in Chapter 14 Installation of Standpipe and Hose Systems of
the National Fire Protection Association code and standards.
Hose Testing
All fire hose shall have an annual maintenance check completed by a contractor or by an in-house service that is licensed
by the City of Chicago Fire Prevention Bureau and/or the State of Illinois. All maintenance and hydrostatic testing performed
by the service shall be in accordance with Chapter 1962 Care, Use, and Service Testing of Fire Hose including Connections
and Nozzles of the National Fire Protection Association code and standards.
Fire Pumps
Inspection
All fire pumps shall have a monthly and annual inspection performed on them. The following provides a description of what
the inspection involves and the type of personnel required to conduct these inspections.
Monthly Inspection
All fire pumps shall have a monthly inspection. The work shall be performed by a person having knowledge in the operation
and function (e.g., contractor) of a fire pump.
The monthly inspections shall documented on the Fire Pump Checklist form and shall be filed in a binder that is kept in the
same room as the fire pump.
The monthly inspection shall consist of:
1. Ensuring adequate heat is within the room or area in which the fire pump is located during the cold weather months;
2. Ensuring the pump suction and discharge valves are fully open;
3. Ensuring the pump gauges read normal operating pressures;
4. Ensuring the fuel tank is at least two-thirds full on diesel driven pumps;
5. Checking for leaks around piping;
6. Ensuring the controller selector switch is in the on position and illuminated; and
7. Ensuring that water supply valves to the fire pump are secured in the open position with a sturdy chain and padlock.
Testing
Acceptance Testing
All fire pumps shall have an acceptance test completed prior to placing the pump into service. The test shall be arranged by
the project manager in conjunction with the contractor.
The criteria for acceptance testing shall be in accordance with Chapter 20 Installation of Centrifugal Fire Pumps of the
National Fire Protection Association code and standards.
The Architects Office shall contact Environmental Health and Safety upon scheduling the acceptance test. Environmental
Health and Safety shall inform the Universitys insurer of the date and time of the acceptance test. All test results shall be
submitted to Environmental Health and Safety.
Monthly Testing
All fire pumps shall have a monthly test. The work shall be performed by a person having knowledge in the operation and
function (e.g., contractor) of a fire pump.
Annual Testing
All fire pumps shall have an annual test of the system performed by a private contractor knowledgeable in the operations
and functions of a fire pump. This inspection and test shall be scheduled by the responsible department as noted under the
Authority and Responsibility section within this policy.
Environmental Health and Safety shall be notified upon all annual fire pump scheduling.
The annual inspection and testing of fire pumps shall be in accordance with Chapter 25 Inspection, Testing and Maintenance
of Water-Based Fire Protection Systems of the National Fire Protection Association code and standards.
Monthly Inspection
A monthly inspection shall be performed on all fixed chemical extinguishing systems by a person knowledgeable in the
operation and function (e.g., contractor) of the extinguishing system.
If a questionable condition is discovered that would prohibit proper operation of the device, the person performing the review
shall immediately contact the responsible department as described under the section Authority and Responsibility in this
policy. The responsible department shall contact a trained private contractor to perform the proper maintenance on the
system and Environmental Health and Safety for any such fixed fire suppression repairs.
Maintenance
Semi-Annual Maintenance
The semi-annual maintenance of a chemical extinguishing system shall be performed by a private contractor trained in the
knowledge and operation of the system.
Criteria for semi-annual maintenance of fixed extinguishing systems shall be in accordance with the following Chapters of
the National Fire Protection Associations code and standards:
Chapter 17 Dry Chemical Extinguishing Systems;
Chapter 17 Wet Chemical Extinguishing Systems;
Chapter 12 Carbon Dioxide Extinguishing Systems; and
Chapter 12A Halogenated Agent Extinguishing Systems.
A copy of the semi-annual maintenance criteria can be obtained by contacting Environmental Health and Safety at 773-702-
9999.
Impairment Procedures
Before Shutdown
Shutting down fire protection equipment shall be planned. All equipment such as excavating, pipe plugs, repair parts and
personnel shall be ready prior to taking the system out of service.
Before the shutdown of the fire protection equipment, the supervisor of
theemployee performing the work shall follow these procedures:
1. Notify Environmental Health and Safety of the shutdown at least 24 hours in advance; and
2. Obtain a Red Tag Permit and request removal of locks from Environmental Health and Safety.
Notification
To obtain a Red Tag Permit, contact a representative from Environmental Health and Safety at 773-702-9999 at least 24
hours prior to the start of the project.
Before the shutdown of the fire protection equipment, a representative from Environmental Health and Safety shall:
1. Tour the area or building prior to shutting down the fire protection system;
2. Ensure that proper steps are taken to shut down any fire alarm systems. Refer to the Fire Detection Systems policy;
3. Notify the City of Chicago Fire Department as to the reason forimpairment and the approximate amount of time the
system will be impaired;
4. Notify the Universitys Police Dispatch Center as to the reason for impairment and the approximate amount of time the
system will be impaired; and
5. Notify the Universitys insurer as to the reason for impairment and the approximate amount of time the system will be
impaired.
The purpose of the tour is to ensure that proper precautions are taken andhazardous processes are restricted. If necessary,
the Safety Officer shall coordinate with the supervisor to arrange for temporary protection such as charged hose lines, the
setting up of temporary sprinkler protection and/or extra extinguishers.
If the project involves any type of cutting, welding or brazing, the supervisor or his/her designee shall obtain a Hot Work
Permit. Refer to the Welding, Cutting and Brazing policy.
Permit Posting
When all precautions are taken, the Environmental Health and Safety representative shall issue a Red Tag Permit. The
permit consists of three parts and shall be posted as follows:
1. Limit the practice of hazardous processes (e.g., usage of open flame, mixing and transferring of chemicals);
2. Restrict smoking within the building; and
3. Restrict cutting, welding or brazing within the building.
Fire Watch
All University employees performing the fire watch shall be trained by Environmental Health and Safety in Fire Safety and
Evacuation. When outside contractors are performing the fire watch, Environmental Health and Safety shall ensure their
knowledge of the following:
1. Periodically inspecting the areas and rooms within the affected building(s) to ensure hazards do not exist;
2. Ensuring adequate fire protection equipment is available and in working condition; and
3. Limiting hazardous work practices such as welding, cutting, brazing or the usage of open flame.
1. Notifying Environmental Health and Safety that the system has been restored;
2. Ensuring that all fire protection is placed back into automatic service;
If sprinkler protection was impaired, conducting a two-inch drain test at the sprinkler riser;
1. Ensuring that sprinkler control valves are locked in the open position;
2. Resetting the fire alarm system in normal operating condition;
3. Removing the Red Tag Permit from the equipment and completing the remaining information; and
4. Forwarding the Red Tag Permit to Environmental Health and Safety.
Upon notification of restored impairment, Environmental Health and Safety shall:
1. Remove the Red Tag Permit from the buildings Lock Box;
2. Notify the Universitys insurer that the impairment is complete;
3. Notify the Universitys Police Dispatch Center that the impairment is complete; and
4. Notify the City of Chicago Fire Department that the impairment is complete.
Emergency Shutdown
When a system is taken out of service unexpectedly, such as sprinkler pipes breaking or otherwise physically damaged,
stabilize the situation and initiate the Before the Shutdown precautions outlined in the previous section.
All monthly and annual testing reports of fire suppression systems shall be maintained by Environmental Health and Safety.
The appropriate department shall forward all monthly and annual testing, maintenance and inspection reports to
Environmental Health and Safety.