You are on page 1of 2

NJS CONSULTANTS CO., LTD.

KARNAPHULI WATER SUPPLY PROJECT PHASE 2 (KWSP 2)

Attention: Mr. Chang Dou .Jung


Project Manager
Kolon- Kubota JV
Karnaphuli Water Supply Project 2 (KWSP2/W-1)

NJS Comments Sheet: No. Wl-0069 Date: 20 111 September 2016 Commented/Approved by: OCHIAI

Contractor's Letter No. W1-TCN-0152 Date 28 111 August 2016


NJS Received Date 29 111 August 2016
Category Facility Description Doc./Dwgs. No. Status

OGeneral Subsoil Investigation Submittal No- 0 Approved


Report (Nashirabad) D-02200-002-B
0 Approved as Noted
IZI Civil/Archi
Resubmission
IZI
is Required
OMechanical Additional information
0 is Required
OE!ectrical
0 Accepted

NJS Comments
W-1 Contractor submit the Subsoil Investigation Report (Nashirabad) as below;
I) Introduction

Fi~.-1: Bort Hole Li\youl Ph1n lit l\ll~lrllh{ld

(Contractor's
Letter) 2) Seismic Information for the Site
3) Field Exploration
4) Laboratory Test
5) Presentation of Test Results
6) Soil Condition at the Site
7) Assessment of Test Results
8) Evaluation of Bearing Capacity
BTl Depth Fteld (\mected I Dm I Skm End Pile
- Pde Pile Ptle
XO tmJ SPT SPT(N ) ~ ol Fnctwn B.-aring Cap;Jcit~ Capacity C'apactty 1n
lN) p1le (fsJKN (fb)I(J\- From Fs From Fb (KNj T~1n
(M) M' M' (KNJ (KN) (LS.

---,,---, ---~--- ___j "'> '"' '" --~ 15.13 =.z,~)


::.o I ~~--~-~ 19~9 33.os 52.97 ~~
4.:'i ,j.02 26i'3ii ::!:i ~"! 1]..5_; NUO :::.78
6.0 :'1._::5 29::-.09 ;:!f; ~::: 47.2:' 7~.(7 :;_iJ9
7.5 12 J? 8.0~ 8~1.:~ S:'i.:S 1~1.7:'i ~27.00 9.:6

Bo~ =M~t=t *.~1lt~~~~~! OA5

15.G ."I 3.'1 .:!: lJ 4901% -168.$6 I 77%3. 1~-IS.-19 ~O.YJ


165 ](J(l 57.5 ~g 5.~ 97'9:'..12 S\18.6~ 1-N-CS :!39:!.93 97.5'
18.0 ! ICIO I 575 ~s :-.~ Jtt1~Y.5~ I 9S0.3-I 16.~013 :!6W ..f7 106.<1-1
.. ___ I_~J.5 l J(IO 57 5 .lS.-"~- J ~ 10~.6!\ l 1!!.6~J1;1 , ~ 2S~S.OJ ~

House R.S#288, 350A/350B, Percival Hill, College Road, Chawk hazar, Chittagong, Bangladesh
E-mail: njskwsp2@gmail.com
He~rl Office: NJS Consult~nts Co., T,1ci., 1-1-1, Shihaura, Minato-Ku, Tokyo 105-0023 Japan
Tel: +81-3-6324-4344 FAX: +l\1-3-5324-4945 E-mail: n.i~tl,ni1ty.com
NJS CONSULTANTS CO., LTD.
KARNAPHULI WATER SUPPLY PROJECT PHASE 2 (KWSP 2)

9) Formula Used for Computation


10) Conclusions
I 1)References
12) Recommendations
13) Project Pictures
14) Figures
- Borehole Layout Plan and Nashirabad (Fig- 1)
- Pile Layout Plan showing the Boreholes at Nashirabad (Fig-2)
- Seismic Zoning Map (Fig-3)
- Level (m) at which SPT (N) Value >=50 for Nashirabad Site
15) Attachment
- Bore Log sheet
- Summary Sheet
- Grain Suze Distribution Curves
- Direct Shear Test
- Unconfined Compression Test
- Consolidation Test
I) Calculation of 8.3 The Skin Friction, End Bearing, Allowable Working Load of R.C.C Cast in situ
Piles shall be revised. However "8.4 Precast Pile" is acceptable.
2) Length of Investigation
Bore No. Invest. L(m)
2 I 19.5
(Engineer's 2 15.0
Comments) 3 15.0
4 13.5

Totnl 63.0
Note) Original Length oflnvestigation = 22rn!Nr x 4 Nr = 88m > 63.0m
Note:

(~~ /~~--,?c;:. ?
-~~.;;;'77~~
Masaharu TAKASUGI
Team Leader, KWSP 2
CC: Project Director, KWSP 2
Dep. Proj. Director, KWSP 2
NJ8 file/EugiueeJt> L:uw,;eJJJeJ

House R.S#288, 350A/350B, Percival Hill, College Road, Chawk bazar, Chittagong, Bangladesh
E-m8il: njskwsp2@gm8il.com
Head Office: NJS Consultants Co., Ltd .. 1-1-1, Shibaura, Minato-Ku, Tokyo I 05-0023 Japan
Tel: +81-3-6324-4344 FAX: +81-3-5324-4945 E-mail: ~nifty.com

You might also like