NJS Comments Sheet: No. Wl-0069 Date: 20 111 September 2016 Commented/Approved by: OCHIAI
NJS Comments
W-1 Contractor submit the Subsoil Investigation Report (Nashirabad) as below;
I) Introduction
(Contractor's
Letter) 2) Seismic Information for the Site
3) Field Exploration
4) Laboratory Test
5) Presentation of Test Results
6) Soil Condition at the Site
7) Assessment of Test Results
8) Evaluation of Bearing Capacity
BTl Depth Fteld (\mected I Dm I Skm End Pile
- Pde Pile Ptle
XO tmJ SPT SPT(N ) ~ ol Fnctwn B.-aring Cap;Jcit~ Capacity C'apactty 1n
lN) p1le (fsJKN (fb)I(J\- From Fs From Fb (KNj T~1n
(M) M' M' (KNJ (KN) (LS.
House R.S#288, 350A/350B, Percival Hill, College Road, Chawk hazar, Chittagong, Bangladesh
E-mail: njskwsp2@gmail.com
He~rl Office: NJS Consult~nts Co., T,1ci., 1-1-1, Shihaura, Minato-Ku, Tokyo 105-0023 Japan
Tel: +81-3-6324-4344 FAX: +l\1-3-5324-4945 E-mail: n.i~tl,ni1ty.com
NJS CONSULTANTS CO., LTD.
KARNAPHULI WATER SUPPLY PROJECT PHASE 2 (KWSP 2)
Totnl 63.0
Note) Original Length oflnvestigation = 22rn!Nr x 4 Nr = 88m > 63.0m
Note:
(~~ /~~--,?c;:. ?
-~~.;;;'77~~
Masaharu TAKASUGI
Team Leader, KWSP 2
CC: Project Director, KWSP 2
Dep. Proj. Director, KWSP 2
NJ8 file/EugiueeJt> L:uw,;eJJJeJ
House R.S#288, 350A/350B, Percival Hill, College Road, Chawk bazar, Chittagong, Bangladesh
E-m8il: njskwsp2@gm8il.com
Head Office: NJS Consultants Co., Ltd .. 1-1-1, Shibaura, Minato-Ku, Tokyo I 05-0023 Japan
Tel: +81-3-6324-4344 FAX: +81-3-5324-4945 E-mail: ~nifty.com