CIC Guidelines
Preface, Preamble
and Glossary
CIC Guidelines

Preface The New Zealand Construction Industry Council (CIC) is a not


for profit industry association of associations in the building and
Developments in the industry are ongoing. Matters such as
Health and Safety in Design and the Workplace, Environmentally
construction design and property sectors. It is the collaborative Sustainable Design, and Building Information Modelling have
voice of the built environment industry in New Zealand and become integrated into the delivery of building processes.
operates at the interface between government (central and local)
and industry. The wide use of the Guidelines has demonstrated some omissions
in them, and there is now a wish to see the Guidelines include all
The Council was formally established in 2003, and emerged stages of the design and construction process. The inclusion of
from an informal association of organisations which previously new stages will see the Guidelines develop into this comprehen-
operated under the name of the Construction Liaison Group. sive document.

CIC Members are also not-for-profit organisations and bodies A more structured process of periodic review is anticipated, which
for professions involved in the delivery of our built environment- we believe should be undertaken every 35 years.
designers and specifiers (architects, designers, engineers etc.),
contractors and suppliers (manufacturers, distributors, contrac- NZCIC is again grateful for the considerable time and effort
tors, builders etc.) and a range of other building professionals generously contributed by the individuals of the Committee and
(compliance, research, surveyors, developers etc.). their Subcommittees.

The CIC is a collaborative group for information, networking, The industry has obligations to the Clients and Consumers who
research and advocacy towards a better built environment for contract their services to ensure that they know what they
all New Zealanders. An Executive Council leads the proactive have commissioned, and what can be expected for the fees
strategy and a wider General Council informs and connects. The charged. Genuine competition achieved through transparency,
CIC interacts with users of the built environment through the responsibility and fair play throughout all project stages are seen
media and through CIC Members. as important to the industry.

The Council began development of the Design Documentation These Guidelines are recommended for use in all building
Guidelines in 2003 following growing concerns of the impact (and projects, and are considered important in the overall development
limited understanding) of poor documentation on the building of building projects. They are part of a suite of guidelines and
industry in New Zealand. At that time guidelines were the subject best practice for the industry, as well as for Clients and decision
of wide industry consultation, as well as an international search makers. Suggestions for their improvement as a result of their use
on best practice. are always welcome.

Since their original adoption by the industry the Guidelines have


become widely adopted and used, and now represent the single
most cohesive interdisciplinary Design Guidelines available in
NewZealand. David Kelly, Chairman

2 of 16
CIC Guidelines

Preamble Introduction Background

The ultimate aim for all involved in designing and Since the introduction of the Design Guidelines they The quality of design documentation, and the
constructing all aspects of a building should be to have been widely adopted through the industry, It cooperation of the entire project team, is critical to
enhance the quality of our built environment. is now considered appropriate to include all stages the success of any building project.
of the design and project management processes.
The design is one part of this process, and these This should enable the industry to define the roles Buildings today are much more complex in all facets,
guidelines establish for all parties involved in a of all parties to the design process through all including not only the physical aspects of form,
project their tasks and responsibilities, together phases of a project, from Project Establishment to structure, services, envelope and interiors, but a
with coordination and design interfaces through all PostCompletion. process that is informed by procurement, environ-
disciplines. Careful identification of client brief and mental, safety and post occupancy requirements.
needs, together with advice by consultants to the The original Guidelines included particular schedules
clients on the most advantageous outcomes, are for each design discipline and design phase which
important ancillary functions that should be linked to made developing an overall scope document, where
these Guidelines. The commentary below provides each party had visibility as to the roles and inputs Who has created the guidelines?
background to the development of the attached others, difficult. The new format combines the
Guidelines and outlines how the Guidelines may activities undertaken by each Consultant through The document has been drafted by a committee
beused. each of the project stages. This will allow a full endorsed by the NZ Construction Industry Council
cross- disciplinary view of the design by stage, which (NZCIC). The committee consists of representatives
The Guidelines are intended as general checklists should avoid scope omissions and deliver a clear from the organisations listed below who have
and benchmarks to define the design process understanding of inter-disciplinary activities. established their own discipline-specific subcom-
for building projects, including interiors, as mittee and consulted widely to ensure that the
distinguished from civil works, industrial process and The Guidelines are intended to be edited to reflect Guidelines are workable and will benefit the entire
infrastructure projects. They are intended to provide to the appropriate level of project complexity and building industry.
an industry-wide multi-disciplinary schedule of service agreed with the Client. They are presented as
design activities typically undertaken. Noting that no an editable PDF which allows for efficient prepara- ACENZ (Association of Consulting Engineers of
two projects are the same, Clients and consultants tion of the document. New Zealand)
should tailor this document to suit the project ADNZ (Architectural Designers New Zealand)
specific requirements. BOINZ (Building Officials Institute of New Zealand)
DINZ (Designers Institute of New Zealand)
The Guidelines now incorporate the major IPENZ (Institution of Professional Engineers
developments in building design including Health NewZealand)
and Safety in at Work (HSW), Environmentally NZIA (New Zealand Institute of Architects)
Sustainable Design (ESD), and Building Information NZIOB (New Zealand Institute of Building)
Modelling(BIM). NZIQS (New Zealand Institute of Quantity
Surveyors)
Project Managers
RMBF (Registered Master Builders Federation

The Guidelines have been co-ordinated in process


and terminology to be consistent for all participants
in the building industry. The Guidelines have
strong support from the professional bodies
listed above, and there is a shared intent that the
Guidelines continue as the industry wide best
practicedocument.

3 of 16
CIC Guidelines

Preamble What is the purpose of the guidelines? Major changes All stages of the Design and Building process

The purpose of the Guidelines is to clearly define and Building on the strengths and wide industry The original CIC Design Documentation Guidelines
communicate to all parties involved in a project: acceptance of the original, the 2016 Guidelines now focused solely on the production of traditional
include: design information. Accordingly the Guidelines
responsibilities and deliverables each party has included the traditional design phases including
through all project stages the scope of services All stages of the Design and Building Concept, Preliminary, Developed, Detailed and
the various parties provide to the Client process are incorporated in the guidelines as also Construction design which referred to those
the interactions and coordination required a single document from Project Establishment design activities normally undertaken by the builder
between all parties; through to Completion including Procurement, shopdrawings, and the design of proprietary
Administration and Observation and Post systems.
Completion.
The broad acceptance and wide use across the
How are the guidelines used? All major disciplines are now included to the construction industry of the Design Documentation
process including Project Managers, Designers/ Guidelines suggested that the opportunity existed
The Guidelines outline the stages that all building LBPs, Quantity Surveyors, the various Engineering to enhance the guidelines to encompass all normal
projects go through irrespective of the procurement disciplines, and the Builder. activities undertaken through all stages from Project
methodology or programme. Establishment to Post Completion.
Layout in a matrix that sets out the activities and
A brief description of each stage is provided in the deliverables undertaken on one axis and the party Accordingly the 2016 Guidelines now include the
Glossary attached. responsible on the other. following stages:

The Guidelines are intended for use as a single Editable PDF formatting provides for easy Project Establishment
shared document to define and communicate the population of the forms with flexibility that Concept Design
responsibilities all parties have through the process. reflects the fact of the contemporary Building Preliminary Design
environment. Developed Design
Detailed Design
Legislative Requirements Health and Safety Procurement
Construction Administration and Observation
Adopted design principles Environmentally Post Completion
Sustainable Design
Design is an evolutionary and often iterative process,
New Technologies Building Information developed from a set of Client requirements within
Modelling (BIM) a complex legislative environment. The purposes of
working in stages is to move from the general to
These changes are explained in some detail below: the particular, and allow the testing of options that
define and confirm the Clients objectives. Important
cost advice and Client and stakeholder approvals
can be sought in parallel, so that substantial changes
can be avoided. Ideally, the fundamental elements
of the previous stage should not be overturned,
and subsequent stages will allow the refinement of
solutions from the previous stage.

4 of 16
CIC Guidelines

Preamble All major disciplines Layout Legislative Requirements Health and Safety

The design focus of the 2004 Guidelines simply The Guidelines are presented as an editable Despite an ever increasing focus on Health and
included only those disciplines that undertook electronic template that identifies the party/ies Safety in the Construction industry, in the last 5
design. These included Architectural, Electrical, Fire, having primary responsibility for the task and its years the Construction industry has experienced the
Fire Protection, HVAC, Hydraulic, and Structural related deliverable, and the party/ies which are second highest number of workplace fatalities and
designers only. required to input/assist/coordinate with the party Serious Harm Notifications.
having primary responsibility.
As mentioned above, the 2016 Guidelines include all The new Health and Safety at Work Act (HSWA)
activities undertaken through all stages of a project, A single mouse click populates a cell with a hollow came into effect on 4 April 2016 and sets out the
and the involvement of new parties is naturally dot which indicates the party/ies inputting, assisting principles, duties and rights in relation to workplace
implied. and coordinating to achieve the task/deliverable. health and safety and the responsibilities business
Double clicking populates the cell with a solid leaders, businesses and workers have under the Act.
Accordingly the 2016 Guidelines now identify all dot which indicates the party having primary
parties reasonably expected to participate in a responsibility for the task and its related deliverable. The Construction industry has and continues to takes
project, and allow for other particular disciplines to Some activities, Health and Safety for example, is a these responsibilities determinedly. The Guidelines
be listed, viz:: responsibility where all parties have an equal role place therefore place Health and Safety at the top of
the list of tasks and deliverables.
Client The scope of other disciplines such as acoustic,
Project Manager vertical transportation and wind consultants, are
Architect/Designer not specifically identified in the template, however
Quantity Surveyor blank columns are available for the inclusion of these Accepted design principles Environmentally
Town planner/traffic engineer specialists on a project specific basis. Sustainable Design (ESD)
Topographical surveyor
Structural Not only is Climate change undeniable, but energy
Geotechnical costs are increasingly significant to building owners
HVAC Editable PDF formatting and occupiers. In the time since the establishment
Plumbing and Drainage of the 2004 Guidelines Environmentally Sustainable
Electrical The complexity and growth of content outlined in Design has developed from a responsible novelty
Fire Engineering the previous section is offset by the Guidelines being to being embedded in private, corporate and
Fire Protection in editable pdf form, which is easily downloaded and government culture. ESD is now considered
Builder filled out. For ease the Guidelines are pre-populated accepted practice, and is included in the Guidelines
Other (to suit project requirements) with scope typical of a traditional project. Parties accordingly.
responsible for preparing the Guidelines on a
particular project should fill them out to best suit the
project requirements.

The format acknowledges and anticipates the variety


of building types undertaken and allows for activities
to be undertaken by the party best suited to the
project requirements. For example, on a warehouse
building, the structural engineer may prepare the
building plans and undertake the contract admin-
istration- roles an architect/designer and project
manager respectively might traditionally do.

5 of 16
CIC Guidelines

Preamble New Technologies Building Information


Modelling (BIM)

A proper understanding of what Building Current design procurement, which tends to restrict
Information Modelling (BIM) is, and the differenti- scope to the production of diagrammatic docu-
ation between this and 3d design is critical in the ments, particularly in the procurement of Building
modern context. Confusion arises because the Services design, challenges this ideal. 2D design
software that works in 3D has the capacity also diagrams, are considered sufficient for pricing,
to deliver BIM outcomes. The key word here is with Services sub trades providing full detail as part
Information. Client or Contractor benefits available of their shop drawing and plant and equipment
through the use of BIM, be it through the quick procurement processes. There can therefore be a
scheduling of building elements, integration of gap in the completion of a fully coordinated 3D or
construction sequencing, or embedding plant and BIM model. Clients that require levels of coordination
equipment with coding that allows easy facilities that 3d software or BIM offer must be sure to
management, is not a given. These BIM require- engage (and remunerate accordingly) designers who
ments must be briefed from design commencement- might not normally be commissioned to undertake
as soon the designers being assembling elements full design.
within the BIM models and the opportunity for
establishing BIM parameters (information about an Whoever is preparing the Scopes of Consultants
object) exists. Engagements should make clear at the time expec-
tations of the Consultants having to undertake their
The requirements of BIM must be understood and services in accordance with the BIM Execution Plan Graphisoft (n.d) About BIM, retrieved http://www.
briefed from the project outset. Clients should (BEP) as this requires the Consultants to deliberately graphisoft.com/archicad/open_bim/about_bim/
also be aware that this information does not come produce the required outcomes. Failure to clearly
for free, as time and skill is needed to embed the state this expectation at design commencement
required Information in the model and to schedule would likely lead to a variation claim as the work
and deliver it in a readily extracted and useable form. required to conform with the BEP would likely fall
outside of Consultants traditional scopes.
The proper use of BIM should deliver high levels of
design coordination which are implied where the Clients should be also be aware that 3D/BIM design
project is being delivered in a BIM environment that requires considerable resource to assemble the
utilises the inherent strengths of 3D documentation. model earlier that traditional design processes, and
Critical to this is the adherence to the BIM Execution that deliverables may not be presentable as early in
Plan (BEP) which clarifies the level of 3D modelling the process. Once the model is developed however,
required by all parties and the coordination processes the flow of deliverables should be well in advance of
to be undertaken. that delivered in traditional 2D design., The diagram
adjacent explains:
The integration of construction sequencing, called
4D design (referring to the time or sequence
component of construction planning) into design
documentation.

6 of 16
CIC Guidelines

Preamble The Design Stages

Project Establishment Preliminary Design Developed design


The project is set up. An Agreement between Client Based on the Client approval and the Concept Based on the Client approval and the Preliminary
and major Consultants is established and appro- Design stage outputs, this stage involves the Design the outputs this stage involves the develop-
priate information about the site, and preliminary refinement of the approved Concept including ment of the approved Preliminary design such that
information about the Client Brief, time frame, testing options for and selection of major elements the scope of all major elements, including structural
budget, stakeholders etc is gathered to enable suchas structural system, building services and elements, building services, materials and finishes
subsequent stages of the project to be undertaken. materials. The design should consider regulatory and net/gross building areas, is clearly defined and
Methods of Contractor Procurement, other than requirements and approvals for both Resource and coordinated. The Developed Design phase is where
Tendering, which may affect the Consultant scope Building Consent matters. Refinements to the Client the disciplines prepare the necessary documentation
and programme, should be advised and inform Brief are incorporated. Specialist consultants required to define the scope of all building elements. High
Consultant Procurement. No design work is done. to input into or prepare the Resource Consent should levels of input and coordination are required from
be engaged. all disciplines. Design documentation is produced
H&S plans for all disciplines will commence and a to scale with grids, principle levels and dimensions
coordinated H&S Plan for the project produced. The project programme should be refined and the are shown, outline specifications are finalised, and
design should be sufficient to prepare a Preliminary all performance criteria confirmed. While resolution
Concept design Estimate of Cost, and an update of the feasibility of individual details that do not impact on the key
Based on the Client approval and the Project accordingly. Options for Procurement method will be elements are left for the next design stage, the docu-
Establishment stage outputs this stage involves the discussed and a preferred method of procurement ments are advanced to a level where little ambiguity
exploration of sufficient design concepts for the may be identified. exists for the documents to be developed to a stage
Client to be able to test the Brief, the development suitable for Building Consent, Procurement and
potential of the site, and have a Concept Estimate A Resource Consent Application, if required, is Construction in the Detailed Design stage.
prepared to establish financial feasibility. Major prepared and may be applied for at the end of
consultants should be engaged as well as those thisstage. Where anything other than a traditional Tender
whose inputs are required to develop the design process for Contractor Procurement is contemplated
to Resource Consent. A preliminary project Preliminary Design drawings should be to scale and this must be agreed as processes suchas Early
programme, BIM Execution Plan (BEP), outline of show spatial sizes and relationships, outline cross Contractor Involvement or Novation may affect the
legislative constraints, and Concept Estimate should section and elevations, and integrate the major Consultant design programme.
beprepared. structural elements, as well as zones and plant rooms
for services. Outline specifications from each major A Firm Estimate of Cost is prepared on an elemental
The Concept Design, Programme and Estimate discipline should be provided. basis. Developed Design provides sufficient
produced should reasonably allow the information for the Client, and stakeholders as
Client to approve the project to proceed to The Preliminary Design should reasonably allow appropriate, to clearly understand the aesthetics,
PreliminaryDesign. the Client to be able to approve the overall form, functionality and performance of the building, its
functionality and cost of the Project and approve internal spaces and facilities.
H&S plans for all disciplines will be progressively this to move into Developed Design. Stakeholder
developed and the coordinated H&S Plan for the engagement and requisite approvals, where The Developed Design should reasonably describe the
project will be updated. required, should be undertaken and gained. final building once its translated to full design during
the Detailed Design stage. The Client will be able to
Concept and Preliminary Design phases are It may provide sufficient information for the approve the aesthetics, functionality and cost of the
sometimes combined on less complex projects. communication of the design to a third party for Project to move into Detailed Design. Stakeholder
marketing or consultation purposes. approvals, where required, should also be gained.

H&S plans for all disciplines will be progressively H&S plans for all disciplines will be progressively
developed and the coordinated H&S Plan updated. developed and the coordinated H&S Plan updated.

7 of 16
CIC Guidelines

Preamble The Design Stages (continued)

Detailed design Procurement Administration & Observation


Based on the Client approval and the Developed Based on the Client approval and the Detailed Although signing a Construction Contract suggests
Design outputs the team develops the design to a Design outputs the process is now undertaken that Client approval for these activities is implicit,
level of that clearly defines the quantity and quality by which a Builder is selected to construct the formal Client approval and distribution of the
of all building elements, materials and systems building, and the preparation of Tender and Special Procurement stage outputs are required for the team
through drawings, specifications, schedules and Conditions and Contract documentation occurs. to commence this stage.
performance requirements. The design should be Separate procurement processes may be used to
comprehensively co-ordinated with other disciplines. procure separate or specialist items for the building. These activities occur during the construction of the
building and so are grouped into the same stage.
The documents produced in Detailed Design have The process is managed by the Consultant identified. They do differ significantly in that Administration
a critical use in Consenting and Procurement and The Client rarely undertakes this specialist role. relates to the management of the Construction
should, with only minor amendment or clarification, Consultants are required to review Tender submis- Contract and Observation relates to the monitoring
be able to be: sions for technical conformance and assess Tender of the construction with respect to the Design
tags. The Quantity Surveyor will be closely involved documents that form part of that Contract. These
submitted and achieve a Building Consent, in the assessment of cost and monetary allowances activities may be undertaken by separate Consultants
and therefore should be able to be reasonably such as Provisional Sums. or a single Consultant depending on the project
constructed. requirements and scale. Note that if NZS 3910 is the
accompanied by Tender and General and Special Once a Tenderer is selected the Contract documents Contract being used the Engineer to the Contract,
Conditions and Contract documentation, and are assembled. Contract and design matters that who may not be one of the Consultants, must be
used to Procure a Construction Contract. have been agreed during the Tender negotiations engaged well prior to this Stage.
will need to be incorporated into the Contract and
The preparation of Tender and Special Conditions design documentation respectively. These revised Administration: The activities undertaken by
and Contract documentation may occur at the documents are assembled into the Contract for the appointed consultant during a buildings
end of Detailed Design or during the Procurement signing by the Client and Contractor. construction necessary for the administration of the
stage. Contract. This may include issuing of directions or
If NZS 3910:2013 Conditions of contract for building instructions, which may include the changing of the
The cost plan should be developed into a Tender and civil engineering construction is the being used, Drawings or Specifications, assessing and valuing
Estimate which is used to inform the Client of the the Engineer to the Contract, who may not be one of Variations, the provision of Payment Schedules,
likely Tender price and evaluate the tender prices of the Consultants, should be engaged during to assessing and granting of extensions of time, issuing
submitted. If a Schedule of Quantities is required it thisStage. of a Practical Completion Certificate or a Final
should be prepared based on the completed Detailed CompletionCertificate.
Design and General and Special Conditions and H&S plans for all disciplines will be progressively
Contract documentation. developed and the coordinated H&S Plan updated.
Particular H&S matters relevant to the Contract
H&S plans for all disciplines will be progressively should be included in the Procurement documenta-
developed and the coordinated H&S Plan tion, and specific responses to H&S matters sought
updated. Particular H&S matters relevant to the and evaluated during Tender.
Contract should be included in the Procurement
documentation.

8 of 16
CIC Guidelines

Preamble The Design Stages (continued)

Administration & Observation Post Completion


(continued) Although Certification of Practical Completion
suggests that commencement of the Post
Observation: The activities undertaken by the Completion stage is implied, Client approval and
design consultant during a buildings construction. distribution of the outputs are required for the team
This normally includes site visits, reviewing of to commence this stage.
Contractor Design information to determine if
the construction materials and installations are in The Defects Notification Period commences with the
accordance with the contract documents, specifica- issuing of Practical Completion and the Contractor
tions and performance criteria. notified of defects that require attention. Unless this
was completed in the previous stage items required
The activities of Administration and Observation under the Contract Terms suchas Warranties, as built
come together at the Contract completion(s), drawings, testing and commissioning Certificates,
certified accordingly as Practical or Sectional Operation and Maintenance Manuals, Certificates of
Completions. The party responsible for Completion Public Use or Code Compliance Certificates, etc will
Certification requires inspections to be undertaken be provided.
and defects listed. These lists accompany Certificates
issued. Also for consideration at this time may be The Final Account is processed in conjunction with
the provision of items required under the Contract the Quantity Surveyor.
Terms suchas Warranties, as built drawings, testing
and commissioning Certificates, Operation and The Contractor should proactively, safely, and in
Maintenance Manuals, Code Compliance Certificates coordination with the buildings occupation and
or CPUs, etc. Shortcomings in these documents that operations, attend to any defects listed at the time of
do not prevent Practical or Sectional Completion PC or arising during the Maintenance Period.
Certification may be included in the list of defects.
HSW plans for all disciplines will continue to be
Practical or Sectional Completions indicate critical progressively developed and the coordinated H&S
Contract procedures suchas the release of retentions Plan updated and issued finally. A HSW plan for the
and bonds, changes to insurances, and submission of defects rectification will be developed, implemented
the Final Account. at commencement on site, monitored and reported,
noting particularly the potential risks to occupants.
HSW plans for all disciplines will continue to be
progressively developed and the coordinated H&S The end of the Post Completion Phase is signalled
Plan updated. A HSW plan for the construction will by the Defects Liability Period stated in the Contract.
be developed, implemented at commencement on Subject to all defects being rectified the Contract
site, monitored and reported. administrator will issue the Final Completion
Certificate, which signals the Contract is ended.
Remaining retentions etc are discharged.

9 of 16
CIC Guidelines

Preamble How important is co-ordination in the design


process?
The determination of construction contract
procurement and conditions of contract, methodol-
Who controls and sets out the building
dimensions in the drawings?
ogy of pricing or tendering, and execution of those
The thorough co-ordination of design between contracts, should be defined at an early stage of the A key to a successful project is good control and
disciplines is considered to be singularly the most design process, so that the documentation can be set-out of building dimensions in the documen-
important issue confronting the industry. Informal arranged accordingly. It is noted that in Contractor- tation. For building projects the architect generally
feedback from the construction industry suggests led projects, much design is undertaken by subcon- has responsibility for dimensions. However, on some
that up to 20% of wastage on construction sites tractors. In these cases the designer may mean both projects (often light industrial type or specialist build-
may be avoided with thorough coordination. the Consultant and the Subcontractor and it should ings) the engineer may act as principal consultant,
The requirement for other parties to integrate be made clear where these cross-overs occur. taking responsibility for dimensions. Therefore, when
and coordinate with the provision of one parties defining the consultants scopes it is necessary to
deliverable is identified and formalised in the new define who is responsible for dimensions.
editable PDF format.
How do the guidelines relate to the manage-
To assist the design practitioner sample ment of the design process?
Co-ordination Checklists have been put together. When should Value Management take place
The sample Co-ordination Checklists have been Design management may be undertaken by any of in the Design Process?
developed on the basis of the Architect/designer the consultants, or the Client, or specialist design
having the primary role of leading the design manager. Because of the varied nature of how Value management (VM) reviews at the appropriate
co-ordination. It must be emphasised however project teams are structured, the task of design stage(s) of the design process may assist in achieving
that all design disciplines have a responsibility for management is not addressed in these Guidelines. successful projects. However, reviews undertaken
integrating other disciplines design into their own as Formal Design management is considered too late can be ineffective and adversely impact on
well as undertaking design co-ordination. particularly necessary where design has a large programme and costs. It is advantageous to carry
subcontractor involvement, and design activities out VM reviews at the end of the initial design
The sample Co-ordination Checklists are generic, inform and are essential to the programme. stages and where the design has been coordinated
and are not exhaustive. Therefore design teams are between the design disciplines, to ensure there is a
encouraged to develop appropriate Coordination Design management may overlap with some of consistent basis for a cost estimate. The necessary
Checklists to suit the needs of each project. the design processes listed in the Guidelines, and revisions that are identified as part of the VM
include the direction of consultants and specialist review may then be input to the start of the next
and subcontractor designers, the chairing and design phase.
minuting of project meetings, integration of the
What is the impact of the procurement design delivery and consents within the project The time required for the VM and subsequent docu-
methodology on design documentation? programme, and managing information flow to and ment changes must be allowed in the programme
from theClient. and the sketch below graphically illustrates the
The input of the designers into the construction opportunity of early reviews.
procurement methodology and construction Responsibility for the design management role needs
is important in the quest for better buildings. to be confirmed and formalised at the start of the
Therefore, the appropriate design consultants should project and the scope of this role either included in
be involved in this process. the consultants service or defined separately.

10 of 16
CIC Guidelines

Using the 1.0 Using the new Format 4.0 Columns 5.0 Populating the Guidelines

new format The Guidelines is available in Editable


PDF. A recent version of Adobe Acrobat or
Adobe Reader needs to be installed to utilise
4.1 Left hand Task column
Lists downwards all the tasks that can
One click in the cell produces a hollow dot
which shows:
be undertaken, starting with approvals the party(ies*) required to input,
the interactive elements. and previous stage deliverables assist, and coordinate with the
Adobe Reader is free and can be Tasks are Grouped under common party responsible in the production of
downloaded at http://nzcic.co.nz/resources/ headers. the deliverable. It is anticipated that
guidance-documents most rows will have cells will have a
Additional Services can be added combination of one solid dot and a
PDF Software by vendors other than Adobe at the bottom of each section on the
(including Apple Preview) are not supported. number of hollow ones.
Other line.
Two clicks in the cell produces a solid dot
4.2 Deliverables column which shows two things:

2.0 Colour Lists downwards the types of deliverable In the Disciplines columns the party
required, these are: responsible for producing and issuing
There are a number of text items in colour. Report (written document) the deliverable
These will print clearly if reproduced in black Coordinate (not a physical deliverable, In the Required column shows that
& white. butevidenced in them) the deliverable is required.

Minute/Note recording the matters of


meetings etc
3.0 Stages Draw traditional drawn
documentation
Each section of the Guidelines is referred to
as aStage. Schedule traditional spreadsheet or
drawn (combination of drawings and
The Stages are separate PDFs. It is text) schedules
recommended that all Stages should be
filled out, with N/A (not applicable) even if Specification written description of
the Stage is not being undertaken. materials, workmanship standards, and
performance requirements
All disciplines work in the Stage is
contained in thesection.
4.3 Required column
A solid dot in this column shows that
the deliverable is required. * Note that in some cases some or all disciplines
will have a solid dot which identifies the
4.4 Disciplines columns shared responsibility each have for a task. For
example all disciplines will have a solid HSW,
From left to right are columns headed which reflects theirshared responsibility.
by discipline (Client, Project Manager,
etc)

11 of 16
CIC Guidelines

Using the 6.0 Saving the Guidelines 8.0 Printing the Guidelines

new format As you populate each stage of the Guidelines, you


will need to Save or Save As the PDFs. Reader/
Acrobat will not prompt to save your changes
Print the guidelines using Adobe Reader/
Acrobat.

(continued)
The document is A4 landscape. Consider
before closing the file. printing double sided.
Ensure size setting is set to 'Actual Size' or
100% and do not 'fit to page'.
7.0 Distributing the Guidelines The document can be wire-bound or hole
punched along the top edge or stapled in
Each stage is small enough to email (under 10mb) the top left corner.
however the entirety of the Guidelines will be too
large to email. We recommend distributing the
larger document via a cloud-based storage service
such as Dropbox, OneDrive, Google Drive or a file
transfer service such as Hightail or WeTransfer.

12 of 16
CIC Guidelines

Glossary Glossary particular to the Health and


Safety at Work Act 2015
Glossary general

Activity Person Conducting a Business or This Glossary has been assembled by Building Consent
Includes manufacture, assembly, use of Undertaking (PCBU) using the definitions available from NZ Confirmation provided by the Building
the structure for the purpose advised Person conducting a business or Legislation, NZ Standard and Published Consent Authority that they are satisfied
to the designer, construction, handling, undertaking plant duty holders under Industry documents. Where these are that the buildings design meets the
inspection, cleaning, maintenance, repair, Despite its name, a PCBU will usually be a not available definitions specific to requirements of the New Zealand Building
decommissioning, dismantling, demolition business entity, such as a company, not an the disciplines have been provided by Code and may proceed to construction.
and/or disposal. individual person. However, an individual representatives on the 2016 Review
carrying out business as a sole trader or Committee. Building Consent Authority (BCA)
Commission self-employed person would also be a Registered Territorial Authorities (or
Authorising someone to perform certain PCBU. Administration in some cases private organisations)
duties or tasks, or to take on certain The management by a nominated permitted to issue Building Consents and
powers e.g. to commission an architect / Reasonably practicable consultant of the construction contract perform Certifying functions (e.g. issuing
engineer to undertake a design. What is or was reasonably able to be done between the Client and the Contractor, Code Compliance Certificates) under the
at a particular time to ensure health and on behalf of the Client, including issuing Building Act.
HSD safety. instructions and variations as required.
Health and Safety in Design Building Information Modelling (BIM)
Volunteer Agreed Services Building Information Modelling. The
HSW Where volunteers carry out work for a The services to be provided by the digital representation of the physical and
Health and Safety at Work, as defined by PCBU, the Act distinguishes between casual Consultant to the Client as identified in functional characteristics of an asset.
the Health and Safety at Work Act 2015 volunteers and volunteer workers. their contract agreement. Refer to the New Zealand BIM Handbook
for more detailed explanation of all BIM
H&S Plan/register Worker As built drawings terminology: http://www.mbie.govt.nz/
The framework for managing those risks in A person who carries out work in any Revisions to the original design drawings to about/whats-happening/news/document-
a particular project. capacity for a PCBU. reflect any changes made in the course of image-library/nz-bim-handbook.pdf
the Construction Contract.
BIM Brief
Overlapping duties Workplace
Prepared by client prior to engaging
Because a PCBU owes duties to workers A place where work is being customarily Brief
consultants to outline required BIM
affected by its work, not just those carried out for a business or undertaking The written statement prepared by or for
outcomes and uses.
who work for it, it is possible for that and includes any place where a worker the Client summarising their expressed
PCBU to owe overlapping duties. PCBUs goes, or is likely to be, while at work and requirements, preferences and priorities, BIM Execution Plan (BEP)
will need to consult, co-operate and includes the site. with respect to at least scope, cost, quality Defines how a project will be executed,
co-ordinate activities to meet their and time frame in sufficient detail for monitored and controlled with regard
shared responsibilities and duties and the Project Team to carry out the Agreed to BIM
responsibilities to ensure that the work Services.
BIM Manager
does not pose risk to people's health and
Leads and coordinates the BIM process
safety. Budget
for the project.
The target Cost of the overall project
Officer including but not limited to the Contract Common Data Environment (CDE)
A person who holds a senior leadership Works as nominated by the Client and Common platform for sharing
position and has the ability to significantly stated in the Brief. information accessible to all project
influence the management of a PCBU. participants
An officer of a PCBU must exercise due Buildability
Level of Development
diligence to ensure that the PCBU complies The extent to which the design of a
Measure of the completeness of
with its duties. planned building facilitates its construction.
elements within a model.
Builders Work Pre Contract BEP
Work that is necessary as a result of other Prepared by consultants as a part of
specialist work area either by separate or their proposals in response to the BIM
sub-contractor. It does not include site Brief.
preliminaries.

13 of 16
CIC Guidelines

Glossary Building Warrant of Fitness (BWoF)


A confirmation issued by the Territorial
Construction design
Where construction requirements such as
Contract Price
The amount agreed in the construction
Drawings
Refers to all drawings of the Contract
Authority and publically displayed site conditions, erection requirements, and Contract between the Client and the Works described or included in the
confirming that the buildings life safety proprietary, performance and fabricated Contractor for the cost of the Contract Contract Agreement together with any
systems (called specified systems) have elements require shop drawings, calculation Works. modification or addition provided for in the
been maintained and inspected for the and selection to create documents that Contract Agreement.
period required. can be directly built from. This design is Contract Works
normally undertaken by the Contractor or Everything to be carried out by the Engagement
Certificate for Public Use (CPU) relevant Subcontractor(s) Contractor to complete the Project, The process of employing a Consultant to
A certificate that enables members of the including goods, services, labour, materials undertake the Scope of Services required
public to use a building or part of a building Construction methodology and equipment, items supplied by the for the project in accordance with the
prior to a Code Compliance Certificate Refers to the planned method of Client, and Temporary Works. Terms and Conditions of the Contract
being granted. construction, taking into account all Agreement.
contractual and legal requirements, Contractor
Client construction constraints, risks, and The organisation or person engaged by the Engineering Approval Plan (EAP)
The person or organisation named as Client opportunities. Methodology includes the Client to undertake the whole or part of Territorial Authority-approved design of
in the Contract Agreement or Construction temporary and permanent works and the Contract Works for the Project. public drainage, water, or road works, or of
Contract. Often referred to as the the services required to complete the a public open space.
Principal or Owner in some Construction construction works. Cost plan
Contracts. A system of cost analysis, which enables Environmentally Sustainable Design
Consultant the cost of a proposed building to be (ESD)
Code Compliance Certificate (CCC) A specialist design or construction developed and monitored and controlled Holistic process for design, construction
Formal statement issued by the local professional or subject matter expert during the successive project stages and operating an asset to minimise
consenting authority at the completion engaged to contribute in some way to and prior to a Construction Contract whole of life costs and impact on the
of the construction activities as the delivery of the project. They may be being let. Normally undertaken on an environment. May be linked to an industry
confirmation that the building work has Separate-Consultants engaged and paid elemental basis which breaks down the standard e.g. GreenStar.
been undertaken in accordance with the directly by the Client or Sub-Consultants materials, labour, plant and equipment and
requirements of the Building Consent. paid and engaged by a Lead Consultant. assembles them into building elements. Equipment
This is generally prepared at Preliminary Components of building services systems
Commission (under section 43 of the Containment Networks Design phase and updated as the design including, for example, fittings and outlets,
Health and Safety at Work Act 2015) Cable trays, cable ladders and trunking progresses through Developed Design, major plant, grills and diffuser, cameras and
means authorising someone to perform Detailed Design and For Tender documents. controllers.
certain duties or tasks, or to take on certain Contingency
powers e.g. to commission an architect / An amount of money, expressed either as Defects Notification Period Final Account
engineer to undertake a design. a percentage or lump sum, included in the The period for notifying and rectifying The final construction cost; including
project budget to allow for the unknown or defects in the Works after Practical or all variations and expenditure against
Commission (plant and equipment) unresolved aspects of a design. Sometimes Sectional Completion has been issued. provisional and price cost sums, to be
Prior to construction Completion, the referred to as a Contingency Sum. assessed and paid to the Contractor at the
process during which installed equipment Design Consultant conclusion of the project.
or plant near operated, adjusted, tested Contract Agreement The specialist Consultants engaged in the
and verified with respect to its adherence The legally binding agreement between project to undertake the design of the Financial Report
to the specifications. This is not to be two parties. Between the Client and the building fabric including services. A Report that covers all of the cost centres
confused with the action of employing Consultants this defines the services, included in the project budget and is
a Consultant, which is referred to as scope, timing, deliverables, and terms and Design Criteria reviewed and updated generally on a
Engagement in this document. conditions. Also the Contract between the Definition of building services performance monthly basis.
Client and the Contractor, as defined by the criteria including required external
Concept Estimate Contract Documents. conditions. Fire Engineering Brief (FEB)
A rough order or high-level assessment of Definition of required fire safety
costs based on the Clients brief and the Contract Documents precautions including egress, separations
Concept Design that are used to set an The documents listed in the Contract and systems. Used to identify and
early budget, generally undertaken at an Agreement, which make up the Contract, discuss fire safety design solutions with
early stage on limited information. together with all information formally stakeholders at an early stage in the
issued to the Contractor during the project.
progress of the Contract.

14 of 16
CIC Guidelines

Glossary Fire Report


Description of fire engineering solutions
Liquidated damages
Costs deductible from the Contract
Payment claim
A request for payment, in writing, issued
Principal
The person or organisation for whom the
(including calculations) demonstrating Price that in the event of a delay to the by the Contractor to the Client under the Construction work is being undertaken
compliance with the FEB. completion of a project, and are based on Construction Contract. Normally includes under NZS 3910:2013 Conditions of
a genuine pre-estimate of the actual losses the specific details of the Contract, the contract for building and civil engineering
Firm Estimate of Cost that the principal will suffer as a result of work undertaken, the period to which the construction. Often referred to as the
Generally prepared based on well-defined that delay. claim relates, the amount claimed and the Client in some Construction Contracts.
documentation and will generally be in an method of calculation. Note that a Payment
elemental format or trade by trade format. Novation Claim under the Construction Contracts Procurement
The accuracy should be +/-5-10%. An arrangement that effectively substitutes Amendment Act 2015 has a specific The stage during which, and the process
an original party to an Agreement with a meaning. by which, the Contractor is selected
Heritage NZ (HNZ) third party and transfers both the benefits and engaged to undertake the Contract
The agency acting under The Heritage and the obligations of the original party Performance Bond Works. Note also that the process by which
New Zealand Pouhere Taonga Act, to the third party. It essentially gives rise A bond issued by a bank or other financial Consultants are selected and engaged is
2014 that promotes the identification, to a new Agreement on the same terms institution, guaranteeing the fulfilment often called Procurement.
protection, preservation, and conservation as the original agreement. Consent of the of a particular Contract by a party to that
of the historical and cultural heritage of original parties to an agreement is required Contract. Procurement
New Zealand. Formerly NZ Historic Places for a novation. Most often relevant to the The process through which a Contractor,
Trust. transfer of (design) Consultant agreements Person or person Consultant or FF & E item is selected.
from the Client to the Contractor in a An individual, partnership, body of persons, Includes the activities required to define the
High Level Order of Cost Design/Build project. firm, company or organisation whether scope, specification, value and timing of
A rough or high-level approximation of the corporate or not. the work to be undertaken.
cost to construct or develop the building or NZ Fire Service (NZFS)
project, generally done at Concept Design The organisation whose statutory role is fire Practical Completion Producer Statement (PS)
stage with limited information. safety, fire prevention, and fire extinction. The date at which the Contract Works A written statement provided by
NZFS is constituted under section 3 of the is Certified at being generally built in Consultants and/or Contractors to confirm
Independent Qualified Person (IQP) Fire Service Act 1975. accordance with the construction contract that design or building work complies,
A person (or firm) approved by the and are able to be used for their intended or will comply, with the Building Code.
territorial authority as qualified to inspect NZIA purpose without material inconvenience. Producer Statements are numbered 1,
certain specified systems and ensure that The professional body representing the Minor defects may be still be outstanding. 2, 3, 4, referring to different statements
necessary maintenance occurs majority of Registered Architects in New If a separate section of the Works is relating to:
Zealand. Certified as above this is called Sectional PS 1: Design
Intake/Discharge Completion. PS 2: Design Review
Openings in the building fabric for air inlet, NZIQS PS 3: Construction
air and other exhausts. The professional body representing the Preliminary Estimate of Cost PS 4: Construction Review
majority of Quantity Surveyors in New An early estimate prepared based on
Interface Matrix Zealand. concept or preliminary documentation. The Product Technical Statement (PTS)
Definition of demarcation points and level of accuracy is generally consistent with A summary of the key details about a
interconnection requirements between Observation the level of definition in the documents. building product or system. Note that a PTS
independent systems. The activities undertaken by the design does not replace evidence of a product or
consultant during a buildings construction. Primary Services Routes systems compliance with the Building Act.
Land Information Memoranda (LIM) This normally includes responding to Space allowance for installation of main
A comprehensive report that has all Contractor queries, checking Contractor Containment Networks Programme
relevant information the Territorial design, and visiting the site at intervals A document describing the time and the
Authority knows about a property or agreed with the Client, to observe that the Prime cost sum (PC Sum) sequence of activity necessary to complete
section. Normally includes special features Contract Works have generally been built in A material-related monetary allowance that tasks that support any or all stages of
(flooding, stability, contamination, etc), accordance with the Contract documents, provides for the purchase and supply, to project delivery.
private and public drainage, consents, including specifications and performance the Site, of specific materials which are to
notices, requisitions, Zoning, notifications criteria. be incorporated into the Contract Works. Project
by Network Utilities Operators, other The sum includes the net purchase price of The building, or part, to be designed
relevant information. the materials, including related Contractor and constructed in a defined location as
expenses, overheads and margins. Does identified in the Contract Agreement.
not include the cost associated with the
installation of the materials.

15 of 16
CIC Guidelines

Glossary Project Budget


A budget that incorporates all of the
Retentions
A percentage of the amount certified
Supports and seismic bracing
Gravity and seismic supports and lateral
Variation
A change to a Construction Contract or
components of the project including land as due to the Contractor on a Payment bracing for Services Distribution and Consultants service. A variation may be
costs, construction costs, FF&E, consultants Certificate, that is deducted from the Containment Networks a change to contract conditions, scope or
fees, development costs, contingency amount due and retained by the Client timing which may or may not have cost
allowances, funding costs, Consent to ensure the proper completion of the Tags implications.
costs,etc. Contract Works. Anything identified in a Tender submission
that departs from or clarifies items Zones
Project Control Group (PCG) Risers contained in the Tender documents. The areas or coverage of building services
The group of key project team members Vertical space allowance for installation of systems broken down across an entire
to report on project wellbeing, makes key Containment Networks Temporary Works building.
decisions and resolves any issues escalated The provision, operation and maintenance
by the design team. Risk of temporary facilities necessary for
Any event which may have health and the Contractors Site operations, and
Project Execution Plan (PEP) safety, financial, programme, quality, preparatory or enabling works not forming
A document describing for the Project implications on the project. part of the permanent Contract Works.
Team the communication, development,
implementation, and control of design and Schedule of Quantities Tender
construction activities associated with the A document in which materials and labour A formal offer, including price, required
project. for the Works are quantified or itemised. information, and tags, to provide a
The Schedule is used by Tenderers to price Consultant service or construct a building.
Project Information Memoranda the same scope, and can be used to value
(PIM) Progress Claims and Variations during Tender Estimate
A summary of the property information a construction. The estimate of cost of the Works based on
Territorial Authority Council has on record the Tender documentation that is used to
that may affect a building project including Services Distribution inform the Client of the likely Tender price
requirements for Resource Consents, Ducts, pipes and cables associated with and evaluate the tender prices submitted.
drainage and utilities, and about the land. building services systems.
Tendering
Provisional Sum Single Line Diagrams/Schematics The processes undertaken to competitively
A monetary allowance, including expenses Non-location specific drawings illustrating procure a Construction Contract or
and margins, that provides in the Cost building services systems, components and Consultants services
Plan or Contract Price for work or items interconnections.
not yet or fully defined to be done by the Territorial Authority (TA)
Contractor. Site A city council or district council under the
The land, building and other places made Local Government Act 2002.
Quality Assurance (QA) available by the Client, where the Contract
A system to help organisations meet the Works are to be carried out. Utilities
needs of customers and other stakeholders Externally provided water (potable,
while meeting statutory and regulatory Specification storm and sewage), power, gas and
requirements related to a product. A written document describing the communications.
materials, workmanship standards,
Resource Consent and performance requirements (which Value Engineering
Confirmation provided by the Territorial focus on the outcomes rather than the The organised approach to providing a
Authority that they are satisfied that the characteristics of the components) required building that complies with the project
building design meets the requirements of in the Contract Works. requirements at the lowest cost.
the New Zealand Resource Management
Act. Sometimes referred to by TAs as Stakeholder Value Management
a Land Use Consent due to the activity An individual, group, or organisation which The process of making explicit the project
of constructing a building occurring on has an interest or may be affected by requirements, and appraising the design
specific land. theproject. against them.

16 of 16