0 / August 2016
CIC Guidelines
Preface, Preamble
and Glossary
CIC Guidelines
CIC Members are also not-for-profit organisations and bodies A more structured process of periodic review is anticipated, which
for professions involved in the delivery of our built environment- we believe should be undertaken every 35 years.
designers and specifiers (architects, designers, engineers etc.),
contractors and suppliers (manufacturers, distributors, contrac- NZCIC is again grateful for the considerable time and effort
tors, builders etc.) and a range of other building professionals generously contributed by the individuals of the Committee and
(compliance, research, surveyors, developers etc.). their Subcommittees.
The CIC is a collaborative group for information, networking, The industry has obligations to the Clients and Consumers who
research and advocacy towards a better built environment for contract their services to ensure that they know what they
all New Zealanders. An Executive Council leads the proactive have commissioned, and what can be expected for the fees
strategy and a wider General Council informs and connects. The charged. Genuine competition achieved through transparency,
CIC interacts with users of the built environment through the responsibility and fair play throughout all project stages are seen
media and through CIC Members. as important to the industry.
The Council began development of the Design Documentation These Guidelines are recommended for use in all building
Guidelines in 2003 following growing concerns of the impact (and projects, and are considered important in the overall development
limited understanding) of poor documentation on the building of building projects. They are part of a suite of guidelines and
industry in New Zealand. At that time guidelines were the subject best practice for the industry, as well as for Clients and decision
of wide industry consultation, as well as an international search makers. Suggestions for their improvement as a result of their use
on best practice. are always welcome.
2 of 16
CIC Guidelines
The ultimate aim for all involved in designing and Since the introduction of the Design Guidelines they The quality of design documentation, and the
constructing all aspects of a building should be to have been widely adopted through the industry, It cooperation of the entire project team, is critical to
enhance the quality of our built environment. is now considered appropriate to include all stages the success of any building project.
of the design and project management processes.
The design is one part of this process, and these This should enable the industry to define the roles Buildings today are much more complex in all facets,
guidelines establish for all parties involved in a of all parties to the design process through all including not only the physical aspects of form,
project their tasks and responsibilities, together phases of a project, from Project Establishment to structure, services, envelope and interiors, but a
with coordination and design interfaces through all PostCompletion. process that is informed by procurement, environ-
disciplines. Careful identification of client brief and mental, safety and post occupancy requirements.
needs, together with advice by consultants to the The original Guidelines included particular schedules
clients on the most advantageous outcomes, are for each design discipline and design phase which
important ancillary functions that should be linked to made developing an overall scope document, where
these Guidelines. The commentary below provides each party had visibility as to the roles and inputs Who has created the guidelines?
background to the development of the attached others, difficult. The new format combines the
Guidelines and outlines how the Guidelines may activities undertaken by each Consultant through The document has been drafted by a committee
beused. each of the project stages. This will allow a full endorsed by the NZ Construction Industry Council
cross- disciplinary view of the design by stage, which (NZCIC). The committee consists of representatives
The Guidelines are intended as general checklists should avoid scope omissions and deliver a clear from the organisations listed below who have
and benchmarks to define the design process understanding of inter-disciplinary activities. established their own discipline-specific subcom-
for building projects, including interiors, as mittee and consulted widely to ensure that the
distinguished from civil works, industrial process and The Guidelines are intended to be edited to reflect Guidelines are workable and will benefit the entire
infrastructure projects. They are intended to provide to the appropriate level of project complexity and building industry.
an industry-wide multi-disciplinary schedule of service agreed with the Client. They are presented as
design activities typically undertaken. Noting that no an editable PDF which allows for efficient prepara- ACENZ (Association of Consulting Engineers of
two projects are the same, Clients and consultants tion of the document. New Zealand)
should tailor this document to suit the project ADNZ (Architectural Designers New Zealand)
specific requirements. BOINZ (Building Officials Institute of New Zealand)
DINZ (Designers Institute of New Zealand)
The Guidelines now incorporate the major IPENZ (Institution of Professional Engineers
developments in building design including Health NewZealand)
and Safety in at Work (HSW), Environmentally NZIA (New Zealand Institute of Architects)
Sustainable Design (ESD), and Building Information NZIOB (New Zealand Institute of Building)
Modelling(BIM). NZIQS (New Zealand Institute of Quantity
Surveyors)
Project Managers
RMBF (Registered Master Builders Federation
3 of 16
CIC Guidelines
Preamble What is the purpose of the guidelines? Major changes All stages of the Design and Building process
The purpose of the Guidelines is to clearly define and Building on the strengths and wide industry The original CIC Design Documentation Guidelines
communicate to all parties involved in a project: acceptance of the original, the 2016 Guidelines now focused solely on the production of traditional
include: design information. Accordingly the Guidelines
responsibilities and deliverables each party has included the traditional design phases including
through all project stages the scope of services All stages of the Design and Building Concept, Preliminary, Developed, Detailed and
the various parties provide to the Client process are incorporated in the guidelines as also Construction design which referred to those
the interactions and coordination required a single document from Project Establishment design activities normally undertaken by the builder
between all parties; through to Completion including Procurement, shopdrawings, and the design of proprietary
Administration and Observation and Post systems.
Completion.
The broad acceptance and wide use across the
How are the guidelines used? All major disciplines are now included to the construction industry of the Design Documentation
process including Project Managers, Designers/ Guidelines suggested that the opportunity existed
The Guidelines outline the stages that all building LBPs, Quantity Surveyors, the various Engineering to enhance the guidelines to encompass all normal
projects go through irrespective of the procurement disciplines, and the Builder. activities undertaken through all stages from Project
methodology or programme. Establishment to Post Completion.
Layout in a matrix that sets out the activities and
A brief description of each stage is provided in the deliverables undertaken on one axis and the party Accordingly the 2016 Guidelines now include the
Glossary attached. responsible on the other. following stages:
The Guidelines are intended for use as a single Editable PDF formatting provides for easy Project Establishment
shared document to define and communicate the population of the forms with flexibility that Concept Design
responsibilities all parties have through the process. reflects the fact of the contemporary Building Preliminary Design
environment. Developed Design
Detailed Design
Legislative Requirements Health and Safety Procurement
Construction Administration and Observation
Adopted design principles Environmentally Post Completion
Sustainable Design
Design is an evolutionary and often iterative process,
New Technologies Building Information developed from a set of Client requirements within
Modelling (BIM) a complex legislative environment. The purposes of
working in stages is to move from the general to
These changes are explained in some detail below: the particular, and allow the testing of options that
define and confirm the Clients objectives. Important
cost advice and Client and stakeholder approvals
can be sought in parallel, so that substantial changes
can be avoided. Ideally, the fundamental elements
of the previous stage should not be overturned,
and subsequent stages will allow the refinement of
solutions from the previous stage.
4 of 16
CIC Guidelines
Preamble All major disciplines Layout Legislative Requirements Health and Safety
The design focus of the 2004 Guidelines simply The Guidelines are presented as an editable Despite an ever increasing focus on Health and
included only those disciplines that undertook electronic template that identifies the party/ies Safety in the Construction industry, in the last 5
design. These included Architectural, Electrical, Fire, having primary responsibility for the task and its years the Construction industry has experienced the
Fire Protection, HVAC, Hydraulic, and Structural related deliverable, and the party/ies which are second highest number of workplace fatalities and
designers only. required to input/assist/coordinate with the party Serious Harm Notifications.
having primary responsibility.
As mentioned above, the 2016 Guidelines include all The new Health and Safety at Work Act (HSWA)
activities undertaken through all stages of a project, A single mouse click populates a cell with a hollow came into effect on 4 April 2016 and sets out the
and the involvement of new parties is naturally dot which indicates the party/ies inputting, assisting principles, duties and rights in relation to workplace
implied. and coordinating to achieve the task/deliverable. health and safety and the responsibilities business
Double clicking populates the cell with a solid leaders, businesses and workers have under the Act.
Accordingly the 2016 Guidelines now identify all dot which indicates the party having primary
parties reasonably expected to participate in a responsibility for the task and its related deliverable. The Construction industry has and continues to takes
project, and allow for other particular disciplines to Some activities, Health and Safety for example, is a these responsibilities determinedly. The Guidelines
be listed, viz:: responsibility where all parties have an equal role place therefore place Health and Safety at the top of
the list of tasks and deliverables.
Client The scope of other disciplines such as acoustic,
Project Manager vertical transportation and wind consultants, are
Architect/Designer not specifically identified in the template, however
Quantity Surveyor blank columns are available for the inclusion of these Accepted design principles Environmentally
Town planner/traffic engineer specialists on a project specific basis. Sustainable Design (ESD)
Topographical surveyor
Structural Not only is Climate change undeniable, but energy
Geotechnical costs are increasingly significant to building owners
HVAC Editable PDF formatting and occupiers. In the time since the establishment
Plumbing and Drainage of the 2004 Guidelines Environmentally Sustainable
Electrical The complexity and growth of content outlined in Design has developed from a responsible novelty
Fire Engineering the previous section is offset by the Guidelines being to being embedded in private, corporate and
Fire Protection in editable pdf form, which is easily downloaded and government culture. ESD is now considered
Builder filled out. For ease the Guidelines are pre-populated accepted practice, and is included in the Guidelines
Other (to suit project requirements) with scope typical of a traditional project. Parties accordingly.
responsible for preparing the Guidelines on a
particular project should fill them out to best suit the
project requirements.
5 of 16
CIC Guidelines
A proper understanding of what Building Current design procurement, which tends to restrict
Information Modelling (BIM) is, and the differenti- scope to the production of diagrammatic docu-
ation between this and 3d design is critical in the ments, particularly in the procurement of Building
modern context. Confusion arises because the Services design, challenges this ideal. 2D design
software that works in 3D has the capacity also diagrams, are considered sufficient for pricing,
to deliver BIM outcomes. The key word here is with Services sub trades providing full detail as part
Information. Client or Contractor benefits available of their shop drawing and plant and equipment
through the use of BIM, be it through the quick procurement processes. There can therefore be a
scheduling of building elements, integration of gap in the completion of a fully coordinated 3D or
construction sequencing, or embedding plant and BIM model. Clients that require levels of coordination
equipment with coding that allows easy facilities that 3d software or BIM offer must be sure to
management, is not a given. These BIM require- engage (and remunerate accordingly) designers who
ments must be briefed from design commencement- might not normally be commissioned to undertake
as soon the designers being assembling elements full design.
within the BIM models and the opportunity for
establishing BIM parameters (information about an Whoever is preparing the Scopes of Consultants
object) exists. Engagements should make clear at the time expec-
tations of the Consultants having to undertake their
The requirements of BIM must be understood and services in accordance with the BIM Execution Plan Graphisoft (n.d) About BIM, retrieved http://www.
briefed from the project outset. Clients should (BEP) as this requires the Consultants to deliberately graphisoft.com/archicad/open_bim/about_bim/
also be aware that this information does not come produce the required outcomes. Failure to clearly
for free, as time and skill is needed to embed the state this expectation at design commencement
required Information in the model and to schedule would likely lead to a variation claim as the work
and deliver it in a readily extracted and useable form. required to conform with the BEP would likely fall
outside of Consultants traditional scopes.
The proper use of BIM should deliver high levels of
design coordination which are implied where the Clients should be also be aware that 3D/BIM design
project is being delivered in a BIM environment that requires considerable resource to assemble the
utilises the inherent strengths of 3D documentation. model earlier that traditional design processes, and
Critical to this is the adherence to the BIM Execution that deliverables may not be presentable as early in
Plan (BEP) which clarifies the level of 3D modelling the process. Once the model is developed however,
required by all parties and the coordination processes the flow of deliverables should be well in advance of
to be undertaken. that delivered in traditional 2D design., The diagram
adjacent explains:
The integration of construction sequencing, called
4D design (referring to the time or sequence
component of construction planning) into design
documentation.
6 of 16
CIC Guidelines
H&S plans for all disciplines will be progressively H&S plans for all disciplines will be progressively
developed and the coordinated H&S Plan updated. developed and the coordinated H&S Plan updated.
7 of 16
CIC Guidelines
8 of 16
CIC Guidelines
9 of 16
CIC Guidelines
10 of 16
CIC Guidelines
Using the 1.0 Using the new Format 4.0 Columns 5.0 Populating the Guidelines
2.0 Colour Lists downwards the types of deliverable In the Disciplines columns the party
required, these are: responsible for producing and issuing
There are a number of text items in colour. Report (written document) the deliverable
These will print clearly if reproduced in black Coordinate (not a physical deliverable, In the Required column shows that
& white. butevidenced in them) the deliverable is required.
11 of 16
CIC Guidelines
Using the 6.0 Saving the Guidelines 8.0 Printing the Guidelines
(continued)
The document is A4 landscape. Consider
before closing the file. printing double sided.
Ensure size setting is set to 'Actual Size' or
100% and do not 'fit to page'.
7.0 Distributing the Guidelines The document can be wire-bound or hole
punched along the top edge or stapled in
Each stage is small enough to email (under 10mb) the top left corner.
however the entirety of the Guidelines will be too
large to email. We recommend distributing the
larger document via a cloud-based storage service
such as Dropbox, OneDrive, Google Drive or a file
transfer service such as Hightail or WeTransfer.
12 of 16
CIC Guidelines
Activity Person Conducting a Business or This Glossary has been assembled by Building Consent
Includes manufacture, assembly, use of Undertaking (PCBU) using the definitions available from NZ Confirmation provided by the Building
the structure for the purpose advised Person conducting a business or Legislation, NZ Standard and Published Consent Authority that they are satisfied
to the designer, construction, handling, undertaking plant duty holders under Industry documents. Where these are that the buildings design meets the
inspection, cleaning, maintenance, repair, Despite its name, a PCBU will usually be a not available definitions specific to requirements of the New Zealand Building
decommissioning, dismantling, demolition business entity, such as a company, not an the disciplines have been provided by Code and may proceed to construction.
and/or disposal. individual person. However, an individual representatives on the 2016 Review
carrying out business as a sole trader or Committee. Building Consent Authority (BCA)
Commission self-employed person would also be a Registered Territorial Authorities (or
Authorising someone to perform certain PCBU. Administration in some cases private organisations)
duties or tasks, or to take on certain The management by a nominated permitted to issue Building Consents and
powers e.g. to commission an architect / Reasonably practicable consultant of the construction contract perform Certifying functions (e.g. issuing
engineer to undertake a design. What is or was reasonably able to be done between the Client and the Contractor, Code Compliance Certificates) under the
at a particular time to ensure health and on behalf of the Client, including issuing Building Act.
HSD safety. instructions and variations as required.
Health and Safety in Design Building Information Modelling (BIM)
Volunteer Agreed Services Building Information Modelling. The
HSW Where volunteers carry out work for a The services to be provided by the digital representation of the physical and
Health and Safety at Work, as defined by PCBU, the Act distinguishes between casual Consultant to the Client as identified in functional characteristics of an asset.
the Health and Safety at Work Act 2015 volunteers and volunteer workers. their contract agreement. Refer to the New Zealand BIM Handbook
for more detailed explanation of all BIM
H&S Plan/register Worker As built drawings terminology: http://www.mbie.govt.nz/
The framework for managing those risks in A person who carries out work in any Revisions to the original design drawings to about/whats-happening/news/document-
a particular project. capacity for a PCBU. reflect any changes made in the course of image-library/nz-bim-handbook.pdf
the Construction Contract.
BIM Brief
Overlapping duties Workplace
Prepared by client prior to engaging
Because a PCBU owes duties to workers A place where work is being customarily Brief
consultants to outline required BIM
affected by its work, not just those carried out for a business or undertaking The written statement prepared by or for
outcomes and uses.
who work for it, it is possible for that and includes any place where a worker the Client summarising their expressed
PCBU to owe overlapping duties. PCBUs goes, or is likely to be, while at work and requirements, preferences and priorities, BIM Execution Plan (BEP)
will need to consult, co-operate and includes the site. with respect to at least scope, cost, quality Defines how a project will be executed,
co-ordinate activities to meet their and time frame in sufficient detail for monitored and controlled with regard
shared responsibilities and duties and the Project Team to carry out the Agreed to BIM
responsibilities to ensure that the work Services.
BIM Manager
does not pose risk to people's health and
Leads and coordinates the BIM process
safety. Budget
for the project.
The target Cost of the overall project
Officer including but not limited to the Contract Common Data Environment (CDE)
A person who holds a senior leadership Works as nominated by the Client and Common platform for sharing
position and has the ability to significantly stated in the Brief. information accessible to all project
influence the management of a PCBU. participants
An officer of a PCBU must exercise due Buildability
Level of Development
diligence to ensure that the PCBU complies The extent to which the design of a
Measure of the completeness of
with its duties. planned building facilitates its construction.
elements within a model.
Builders Work Pre Contract BEP
Work that is necessary as a result of other Prepared by consultants as a part of
specialist work area either by separate or their proposals in response to the BIM
sub-contractor. It does not include site Brief.
preliminaries.
13 of 16
CIC Guidelines
14 of 16
CIC Guidelines
15 of 16
CIC Guidelines
16 of 16