Professional Documents
Culture Documents
Disclaimer : Permission to proceed does not constitute acceptance or approval of design details, calculations, analyses, test methods or materials developed or selected by the subcontractor/supplier and does not relieve subcontractor/supplier from full compliance with contractual obligations or
release any "holds" placed on the contract.
BACS Status Codes : 1 - Work may proceed; 2 - Revise and Resubmit. Work may Proceed Subject to Resolution of Indicated Comments; 3 - Revise and resubmit. Work may Not Proceed; 4 – Review Not Required. Work may Proceed; Rejected – Rejected. Work may Not Proceed
RMTC Status Codes : A - Reviewed; Work may proceed; B - Reviewed with comments; Revise & resubmit. Work may proceed subject to incorporation of comments; C - Objection; Revise & resubmit; Work not proceed; D - Rejected; E - Review not required; Work may proceed
Note to Supplier/Subcontractor: Approval coding by BACS is for information only. Final approval to be provided by RMTC.
BACS Review
No. Document Number Rev BACS Comments (Designer, ICE, other) Comments Made by Initial Status Supplier / Fabricator / Subcontractor Response Responded By Revised Status
In MCP-03, add the load for the FCU units near the "M" symbol as it
1 001 Najib Khneisser Code 2
was done for the rest of the items.
In MCP-05, add the load for the FCU units near the "M" symbol as it
2 001 Najib Khneisser Code 2
was done for the rest of the items.
Some of the mechanical loads in the latest load report submitted "1F8
3 001 Load verification 21.01.2019 modified" is not matching with the loads Najib Khneisser Code 2
shown in the MCC schematics. Ex: MCP-06, Fan-05.
In MCP-09, add the load for the FCU units near the "M" symbol as it
4 001 Najib Khneisser Code 2
was done for the rest of the items.
In MCP-07, add the load for the FCU units near the "M" symbol as it
5 001 Najib Khneisser Code 2
was done for the rest of the items.
In MCP-13, add the load for the FCU units near the "M" symbol as it
6 001 Najib Khneisser Code 2
was done for the rest of the items.
In MCC-15, add the load for the FCU units near the "M" symbol as it
7 001 Najib Khneisser Code 2
was done for the rest of the items.
In MCP-13, FCU 103, and FCU 112 are connected to the same circuit.
However, on the load report, it shows that FCU 103 and FCU 112 are
8 001 Najib Khneisser Code 3
on different circuits, with FCU 103 3 phase and FCU 112 single phase.
Clarify and rectify.
In MCC-15, FCU 102 is showing 0.27 KVA as TCL, while in the load
9 001 Najib Khneisser Code 3
M-BNR-1F8DS0-CELD-SDR-010110 report, FCU 102 is showing 3.26 KW. Clarify and rectify.
M-BNR-1F8DS0-CELD-SDR-010111 In MCP-17, add the load for the FCU units near the "M" symbol as it
10 M-BNR-1F8DS0-CELD-SDR-010112 001 Najib Khneisser Code 2
was done for the rest of the items.
M-BNR-1F8DS0-CELD-SDR-010113
M-BNR-1F8DS0-CELD-SDR-010114 In MCP-16 (E), Fan 29 is showing 13.2 KW (17.32 KVA) as TCL, while
11 M-BNR-1F8DS0-CELD-SDR-010115 001 Najib Khneisser Code 3
in the load report, Fan 29 is showing 8.66 KW. Clarify and rectify.
M-BNR-1F8DS0-CELD-SDR-010116
In MCP-19, add the load for the FCU units near the "M" symbol as it
12 001 Najib Khneisser Code 2
was done for the rest of the items.
434211111.xlsx Page 1 of 2
M-BNR-1F8DS0-CELD-SDR-010113
M-BNR-1F8DS0-CELD-SDR-010114
M-BNR-1F8DS0-CELD-SDR-010115
M-BNR-1F8DS0-CELD-SDR-010116
No. Document Number Rev BACS Comments (Designer, ICE, other) Comments Made by Initial Status Supplier / Fabricator / Subcontractor Response Responded By Revised Status
RMTC Review
1 Please Select
2 Please Select
3 Please Select