CPU CAMP MAINTENANCE DAILY REPORT

25-
SEP-2017

To : Ibrahim Romayan (Field Administration Officer) Cc: File:

From: SALAH MOSA (CPU Camp & Facilities MIANT Foreman)

A. Air conditioning & Refrigeration Works:


Repaired HVAC unit B of ITR building @ YLNG- CPU#II (sharing with ELEC, instrument).
Made PM for central A/Cs & split of MCC + CPU c/room.
Making PM for central A/Cs of MCC & CPU c/ room (on hold)xxx 40%
Repaired central A/C of RAYDANs kitchen.
Replaced new thermostat for A/C of LPG- army gate.

B) Electrical works:
Daily check up for all electrical equipment of 2 kitchens by our electricians.
Fixing rice steamer of SNR kitchen (ongoing)>>>>> 40%
Repaired big mixer machine of JUNR kitchen (completed) 100%

C) Carpentry Works:
Completed installing national flags + presidents pictures around CPU facilities, Refinery 100%
Continue fabricating new wooden partition for new YGCs offices @ YLNGs camp (ongoing)>>>
60%

D) Plumbing Works:
Check up and doing daily PM for CPU camps Sewage plant. Routine Job.
Doing new plumbing jobs for mechanic w. shop @ GP#2 (ongoing)>>>> 80%
Fixed a used toilets flasher for security gate.
Fixing new water hoses for inspection dark room @ training center (ongoing)>>>40%
Fixed new flasher for dish washer in SNR kitchen.

E) Gardening Jobs:
Gardening & removing dust around W-block (100%).

Summary:
Repaired HVAC unit B of ITR building @ YLNG- CPU#II (sharing with ELEC, instrument).
Made PM for central A/Cs & split of MCC + CPU c/room.
Repaired central A/C of RAYDANs kitchen.
Completed installing national flags + presidents pictures around CPU facilities, Refinery 100%.
Continue fabricating new wooden partition for new YGCs offices @ YLNGs camp (ongoing) 60%
Still Doing new plumbing jobs for mechanic w. shop @ GP#2 (ongoing)>>>> 60%

Fog machine still Brocken, under fixing of mechanic.


Page 2 of 2