We have achieved above 9.36 million safe man hours without lost time injury
The Jetpur - Somnath project has achieved Approx.9.36 million cumulative man-hours worked up to 31st January15.
The project has accomplished Zero LTI free man-hours worked since last LTI on dt.1st July 12.
Total 167 nos. of Construction Vehicles (Like Hywa, Tipper, Roller, Paver, Hydra & DG Set) were inspected
and Stick Green Sticker after inspection during the month of January15.
Total 55 Nos. of Safety trainings conducted at site and achieved 1110 man months during the month of
January15.
Total 14.Nos. Plants (like Batching Plants, Crusher Plants, and Hot Mix Plants etc.) have been inspected
during the month of January15 by HSE team and, mechanical team.
Total 4283 man-month achieved from tool box talks such as Incident alerts, Hazard & Fire safety to site etc.
conducted at site.
09 Nos. Work Permit has been issued for excavation work during January15.
Issued mandatory PPEs to the workers and ensure its proper use at site and PPEs stock list has been attached
with the monthly report as Appendix 1.
Road Studs Installation across the road Toll plaza Works in progress with all
before median opening in progress safety devices
Environment:
Ensured water sprinkling system (water tankers) at construction site for dust pollution control.
Environmental Monitoring along the Project road and plant site has been conducted on 17th Dec
2014.
Green belt developed near all Plants (like Batching Plants, Crusher Plants, Hot Mix Plants and Camp
office etc.
Installed water sprinkling system in all the crusher plants
Rehabilitation of Borrow area and Quarry sites to be initiated after completion of project.
Safety Officer
Level-1 Internal PKG A & B
Penalized/Warning:
0 Nos. Staff and workers Penalized for safety violation.
Breaches by EPC Contractor (M/s Backbone Enterprises): - (If any - provide details)- Nil
Definition of Breaches Number of breaches of statutory health, safety & environmental requirements. This includes
Fines, Improvement Notice, Prohibition Notice, Penalty Notice or Prosecutions, or Non Compliance with Legal and Other
Requirements.
No. of LTD
Injured Person(s)
Classes 1st Day
Incident Description Date/ (include details of any Head of 1st Day
Sl. (PD1, 1st Day Return to
*Identify Body Part Time of Medical Treatment) Location Department Return to
No. PD2, Absent Normal This Cum Yr
Injured Incident Damage to property or Comments Work
PD3) Duties Month to Date
the Environment
Report for the Month of :- January'2015 Previous Previous Previous Jan-15 PROJECT START DATE: 31.03.2012
Sr.No Required Data Year Year Year TOTAL / AVERAGE
2012 2013 2014
3 Man-hours worked during this month 1,725,088 3,633,072 331872 357760 9670384
4 Total safe man hours achieved since inception 1,418,912 3,633,072 331872 357760 9364208
12 Severity Rate- (No. of man days lost x 106 / Total man hours worked ) 0 0 0 0
0
Note : Manpower details are to be based on the record of Personnel Department which includes all the workers at site including PRW workers, Sub-Contract workers and departmental Workers. Man-hours worked
details may not be 100% not accurate but should be near to 90-95% accuracy .
: Highlighted parts such as Sr.no 9, 11, 12 and Column 'Total/Average' are protected.
JetpurSomnath Project (NH 8D)
4 - Laning of of Jetpur-Somanth Section(Km 0.000 to 127.600) of NH 8D in the State of Gujarat to be executed as BOT(TOLL) Project on DBFO pattern under NHDP Phase III
Ambulance
1 02-Jan-15 61+500 10:30 AM Marketing Yard Over Speed Major Over Speed Paved Good - Clear GJ-11-AB1671 Car & Rikshwa 1 0 1 1 0
108
06-Jan-15 7:45 AM Major Paved Good - Clear Rikshwa Rikshwa 1 0 0 0 0 Ambulance
2 55+200 Straight Road Overtaking Overtaking
108
08-Jan-15 9:30 AM Major Paved Good - Clear GJ-11-AG-969& Four Wheeler& 0 1 0 0 0 Ambulance
3 117+350 Straight Road Over Speed Over Speed
By Cycles By Cycles 108