Professional Documents
Culture Documents
Mrs. Sangwan
Client Company:
Design Statement: Design, build, and test a bridge carrying a two-lane highway
that spans a riverbed.
Constraints: -the bridge may cross the valley at any elevation from high-
water level to 24 meters above
-to provide clearance for overhead power lines, the highest
point on the bridge may not exceed an elevation 32.5 meters
above the high-water level (8.5 meters above top of the
riverbanks)
-the bridge substructure may consist of either standard
abutments (simple supports) or arch abutments (arch supports)
If necessary, the bridge may also use one intermediate pier,
located near the center of the valley. ________________________
Project Lead The Way, Inc. Copyright 2012 IED Design Brief Template Page 1
The bridge can have no more than 50 joints and no more than 120
members. The bridge can not cost more than $500,000, and must
hold the load of passing truck 240kN. -_____________________
Project Lead The Way, Inc. Copyright 2012 IED Design Brief Template Page 2