Professional Documents
Culture Documents
COUMCC02
COUMCC02
CONTROLLING
XYZ LIMITED
Title: BUSINESS PROCESS PROCEDURE
Organisation/Area: Creation of cost center group
Cost center.
File name: Coumcc02.doc Solution/Release : R/3 4.6 B
Responsibility:
Trigger : Create a cost center group- To look at similar cost centers as a group.
PROCEDURAL STEPS
1.1 Access transaction by :
1.2. On the “Create Cost center group : Intital Screen “, enter information in the fields as specified in
the below table :
1.4. . On the “Create Cost center group : Structure“ screen , enter information in the fields as specified in
the below table :
Field Name Description R/O/C User Action and Values Comments
Node R You can add any sub groups under this group. For
that click on the superior node and click insert
group icon or F7. You will get a pop up window
“Insert Group”. In this screen enter the name of the
new node.
Trigger : When you want to change any field in a Cost center group.
PROCEDURAL STEPS
1.2. On the “Change Cost center group: Initial Screen “, enter information in the fields as specified in
the below table :
Cost center group: CE Gr. No R Enter the Name of the Cost center group you want
to change.
1.4 On the “Change Cost center group: Structure“ screen , enter information in the fields as specified in
the below table :
New node R In this field, enter the name of the new node.
Description R In this field, enter the description.
Lower level R Select which level you want to create the new node in
Same level relation to superior node.
Higher level (click Lower level,Same level or Higher level.) and
click Close enter button.
Select icon R To delete a group, you have to first select the group
by clicking on the group and click the Select icon or
F9. Then click delete icon .
To Rearrange a group, click on the group and click
Select icon. Then click on the node to which you want
to attach the selected group, and click Lower level,
Same level or Higher level. Click Close enter button.
Insert CCTR icon R Click on the lowest node of the group and click
Maintain values. In the Edit single values screen,
enter the cost centers or range of cost centers which
belong to this group ( ie. the Last node ) . Then, click
on continue enter icon .