You are on page 1of 1

Boardwalk 6

OPTION NO. 1 ( Free Stand up to 40 m hight) Canal 3


10 Tower cranes of ( 4 t.c at 60m boom and 6 t.c at 50m boom)
with tip load of 1.5 ton

R60.00
9.52

19.13
0
0.0
Boardwalk 5
R6

0
R5

0.0
21.74

0.0

R5
0

12.83
RW
96.27

0.55
97.39 RW RW
69.53 RW 9.69 69.54

1.28

2.79

4.56
2.73
CP-02-002 CP-02-003 CP-02-004 CP-02-005

CP-02-203
2B+G+10 TYP + R

20.73
2B+G+10 TYP + R 56.50 2B+G+10 TYP + R TOWER 5.99
19.29

6.37 BU.H = 41.65F

17.70
19.20
80.60 2B+G+10 TYP + R TOWER BU.H = 39.75F 80.60
53.5B 7.78 54.10 9.01 10.61 CORE
52.2B 25.18

40.00
BU.H = 39.75F 6.79
40.01

25.87 CORE RAMP RAMP RAMP CORE 2B+G+10 TYP + R


CORE
&
1.70 CORE 51.9B CORE CORE CORE BU.H = 41.65F
5.70 53.5B
TERRACE WATER RAMP WATER TERRACE
TERRACE

3.00
TERRACE
3.11

3.00
1.25

1.25
TANK TERRACE Substation 0.95
TERRACE TANK
Substation

3.00
Substation

3.00
Substation & SWIMMING POOL 12.85
12.82 SWIMMING POOL 4.00

20.31
& 4.00 &
18.90

& L.V ROOM T.C

18.43
T.C 1.00 T.C SWIMMING POOL
T.C L.V ROOM

18.46
L.V ROOM SWIMMING POOL2.34 L.V ROOM 1.00
FUTURE SWIMMING POOL
FFL+ 3.90
SSL+ 3.75
FFL+ 4.50
SSL+ 4.35
FUTURE SWIMMING
KIDS POOL
FFL+ 4.80
FUTURE SWIMMING
KIDS POOL
FFL+ 4.80
2.30 FFL+ 4.50
SSL+ 4.35
FUTURE SWIMMING POOL
FFL+ 3.90
SSL+ 3.75
6.00

3.84
SSL+ 4.65 SSL+ 4.65

6.00
4.04

1.89
1.90

10.18
97.88

1.63
CP-02-204
10.53

98.27
CP-02-202 40.00
70.45 L.V ROOM
9.81 70.45
RW
CORE
40.00 CP-03-201

9.08
RW
9.08

ER TANK
RAMP & WATER TANK RAMP & WAT
RW 99.07 RW 100.14
9.87

CP-02-006
51.60B
BU.H = 38.60F
2B+G+9 TYP + R

1.79
14
2.26

2.54

4.35
.42
14.1 93.50
93.50

CP-02-016 CP-02-017 0.85

19.15
NO. DATE

CP-02-201
- -
19.15

TOWER 7.04 2B+G+8TYP + R PROJECT REVISED APPROVED


RAMP CORE 2B+G+8TYP + R BU.H = 34.35F RAMP
CORE BU.H = 34.35F CORE 46.0B CORE CORE
10.38 & CORE CORE & 11.42
46.0B CORE 12.12

39.98
12.38 3.00 21.23
1.61

1.00
1.20 WATER RAMP RAMP WATER

30.02
T.C
30.02

TANK TERRACE TERRACE


& & TERRACE TERRACE
T.C
TANK

2.25
WATER
2.25

WATER

TERRACE
19.79

76.88
78.08

6.00
4.10

3.59
6.15

TANK

6.24
TANK

19.04
TERRACE

89.83
3.70
18.21

1.00 2.80

BU.H = 38.6
50.40B
PROJECT:

6.00

SWIMMING POO
89.50

72.40
2.80
SWIMMING POOL
72.41

R60.00 3.40 Substation PROPOSED RESIDENTIAL BUILDING


2.5

2.5
SWIMMING POOL SWIMMING POOL
& Substation

5.22
RW T.C T.C 3.90 (2B+G+9 TYP.)
4.60

L.V ROOM & RW


2.80 L.V ROOM
MEYDAN ONE

0F
RAMP RAMP
RAMP
SWIMMING POOL 2.30 PLOT NO: 8884646

L
2.40
17.37

CORE 20.65 CORE


Substation Substation

5.70
OWNER OF TITLE:

28.03
SWIMMING POOL
5.70
28.01

& &
L.V ROO M L.V ROOM 25.79
19.79 TERRACE T.C TERRACE TERRACE TERRACE TERRACE T.C TERRACE 10.89
Substation 7.93 Substation 19.99
& & MEYDAN L.L.C
L.V ROOM BU.H = 31.8F L.V ROOM P.O. Box 9305, Dubai , UAE.
CORE
CP-02-001 CORE CORE 13.71 T: +9714 3270000 F: +9714 3270007
15.44 43.5B CORE 95.74 5.19

21.35
86.34 5.56 E: info@dubairacingclub.com W: www.dubairacingclub.com
18.11

TOWER TOWER

12.33
12.99

BU.H = 31.80F
CP-02-015 43.0B
CP-02-014

8.12
10.10 17
8.22

.3
.85

.73
7
16
17

16

0.85
.02

CONSULTANT:
4.45

5.71

4.24

27.79
1.52

28.00
1.11

10.08 103.95
99.87
0
R50.0
R50.00

R5
0.0
0
0.0

0
R5

TOWER CRANE LOCATION


OPTION-1

CP-02-205
P-02-208

CP-02-207
CP-02-012 CP-02-013 ZAC-SD-TCL-01

You might also like