You are on page 1of 1

Sumber Emisi Cerobong Running Hours (jam)

No Kapasitas
Nama Jenis Kode Diameter (m) Tinggi (m) Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16

FSO SPJ

1 Auxiliary Engine 1 Mesin pembakaran SPJ-AE1 0.5 32 500 KW 212.8 158.5 250.2 1 167 417

2 Auxiliary Engine 2 Mesin pembakaran SPJ-AE2 0.5 32 500 KW 330.5 328.5 372.0 367.3 416 156

3 Auxiliary Engine 3 Mesin pembakaran SPJ-AE3 0.5 32 500 KW 258.0 334 164.8 502.4 199.5 268.5

4 Cargo Boiler Boiler SPJ-Boiler 1.625 33 25T/hour 14.0 29.7 7.5 58.9 21.0 82.5

5 Main Engine Mesin Pembakaran SPJ-ME 1.625 33 7132 KW - - - - - -

Sumber Emisi Cerobong Running Hours (jam)


No Kapasitas
Nama Jenis Kode Diameter (m) Tinggi (m) Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17

FSO SPJ

1 Auxiliary Engine 1 Mesin pembakaran SPJ-AE1 0.5 32 500 KW 186.5 255.5 132.3

2 Auxiliary Engine 2 Mesin pembakaran SPJ-AE2 0.5 32 500 KW 147 274.5 278.0

3 Auxiliary Engine 3 Mesin pembakaran SPJ-AE3 0.5 32 500 KW 477.5 204 457.0

4 Cargo Boiler Boiler SPJ-Boiler 1.625 33 25T/hour 20.50 12.00 69.00

5 Main Engine Mesin Pembakaran SPJ-ME 1.625 33 7132 KW - - - - - -

You might also like