You are on page 1of 2
cense to: R#E [eeicctuo: eee Checkedby: _#8# os-o1-2018 Design of Punching - Two Way Shear - According te ACI3L0M-11 Case: Interior Rectangular Column Critical Section Interior Column (Rectangular) % a We yy Direction of | Transfer Mament = Material Propertie: a L Fe =21MPe Concrete compressive strength fy =420™MPa Reinforcement yield strenath phi = 0.75 Shearstrerath reduction factor Lm = 1.00 Normalweight Concrete Strength Reduction Facer Applied Forces: Ultimate shearforce Ultimate bending moment Slab thickness Covert centerof steel bars Slab effective depth Column side parallelto bending Column side perpendicularto bending Punching perimeter side parallel to bendng Punching perimeter side perpendicularto bending Punching perimetercf critical sectionlocated at d/2fromcolumn perimeter 2(b1+b2) Ac bo*d 367500 mm2 Punching area cf ertieal section J)e= fbt.d[b1+3b2}+d°3}/3 = 66098958.3 mms Modulus of critical secon Applied Shear Stress: av= 1-{4/[1+(2/3)*(b1/b2)*(05)D = 0.410 Portion of unbalanced momenttransferred by eccentricity of shear vut = Vu / Ae = 0.954 MPa Diractshearstreze -vu2 = (av.Mu)f (fe) = 0.506 MPa Indirect shearstress due to unbalanced momenttransferred by eccentricity of shear ‘yu= vul + w2 = 1471 MPa Maxmum applied shearstress on critical side of nium ‘check Adequacy of slab Effective Depth : -vu_max phi 05 sar(Pe)= 1710 MPa Maximumsheerstress permitted for slab with shear reinforcemest -vu ve =1.134 MPa ‘Shear reinforcementis required because of applied shear stress is greaterthan concrete shear strength -Concrete Shear Stress With Shear Reinforcement: whenshear force sresistedby combined action of concrete and reinforcement thecontrbbution of concretels given by: ver = phi*0.17*eqrt(Fe) = 0.584 MPa - Required Area of Shear Reinforcement for CriticalSide of Column: Ay/S = (l(vu-ver)*b2VLphi*fy]} Used reinforcement inb2 sid AT7 mm2jmm Required shearreinforcementalong direction of bending (e2side) 2-legsT10@ 80 Ay/S = ((vut-ver)"b1/[ph*FyT} = 0.633 mm2/mm Required shearreinforcementperpendicularon direction of bending (bt side) Used reinforcement inbi side:2- legs T8@ 80 where S <= Smax= dj2 = &7.50mm -Termmnation Distance of Shear Reinforcement: + Shear reinforcement can be terminated when: Wu c= verBord -where Bo is thesecond critical sectionat distance d/2 outward fromthe lastrequired stirrup, and givenby: Bo = Vu/ (vor"d) = 3485.57 mm At the same tme Bo = 2(ci+c2)}+4*2*(2)°(0.5) for InteriorRectengular Column where ais the termination distance, given y: a = (Bo2*[c1+P/{4°2)10.5)} = 365.14mm Distance of last stirup from face of column = 2-4/2 = 277.64 mm - Summaryof Used Shear Reinforcement: - Primary stirrup legs distributed parallelto (b2) side -Perpendicular to bending-: 2- legs T 10 @ 80, ..Detalls: [4 Rows; 1 Closed stirrups T 10 © 80] - Secondarystirrup legs distributed parallelto (b1) side -Parallelto bending-: 2- legs T8 @ 80, ..Details: [4 Rows; 1 Closed Stirrups T 8 @ 80] <.4/2=€7.5 mm “Notes: Concrete compressivestrenath shall tbe taken greaterthan70 MPa (0%) Reinforcement yield stength shal not be taken greaterthan 420 MPa (0%) Slab effective depth shouldbe createrthan the maxof {150 mm or Lédb} where dbis the bar diameter, mm, thenslab effective depth should bed >= 128 mm 0 mm, then slab effective denth should be d > 6 mm, then slab effective depth should bed > RCMACT-Builder (Reinforced Concrete Members ACI-Builder) Developed by: Eng. Hussein Rida

You might also like