You are on page 1of 1

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Contractor:-HEim-German MINISTRY OF PUBLIC WORKS Commencment date: 26 Aug 2010.


Completion Date: 25 Aug 2013.
Afghan & Khalil Cons: (J.V) Islamic Republic of Afghanistan Total Duration: 1095 Days
Kabul, Afghanistan
Bagrami - Khaki Jabbar - Hisarak - Gandamak - Sherzad - Surkhroad Road

300mm C/C

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT


PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

50

Dowel Length 500 mm


0.4

Spacing 300 mm

0.13 Cm 10.0 cm
25cm

15 cm

Dowel Basket length 3.500 m


Road
Note :

DOWEL BASKET 2 . Number of Dowel bars : No- 12

5 . Number of hooks : No- 24 on both sides

7 . Numbers of Longitudinal Top bars : No- 02

9 . Numbers of Longitudinal Bottom bars : No- 02

cement stabilized Coarse for the strength of the dowel baskets

APPROVED BY : ALAI : Approved By: Sheet 2/2


Title : HEIM :

ISLAMIC REPUBLIC OF AFGHANISTAN Project No : 2008-1240-AFG


APPROVED : APPROVED : CONSULTANT:
DESIGN OF BAGRAMI- PM:
Ministry of Public work M/S ALAI RCOMTECH.JV Revision: 001
Microryan, Kabul, Afghanistan KHAKIJABBAR-HISARAK-GANDAMAK- DESIGNER : DESIGNER : TEAM LEADER
SHERZAD-SURKHROD ROAD

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

You might also like