FOUNDATION DESIGN

S.B.C = 20.00
Fdn. Lvl. 4.000
S.B.C 20.000 T/M^2 Gross S.B.C = 20.00
ALLOW.= 1.50 1.250 FOR WIND
C1 Check INCREASE for EQ.
Staad No 1 ONE WAY not okay Dftg = 0.75 Ftg Ftg
ONE WAY okay Col L Col B CANTX CANTY
TWO WAY SAFE 0.60 0.35 1.0500 1.0250

Pu (L) Mx (L) My (L) L B


Ton Ton-cm Ton-cm self wt. soil wt. P+ws+wf ex ey m m
manual in dir. of L in dir. of B m m
45.4641 164.95 38.76 12.15 34.506 115.4481 0.0143 0.0034 2.70 2.40
12.3299 2984.22 145.69 12.15 34.506 68.3171 0.4368 0.0213 2.70 2.40
85.0726 3248.13 207.71 12.15 34.506 141.0598 0.2303 0.0147 2.70 2.40
5.7868 140.33 706.51 12.15 34.506 61.774 0.0227 0.1144 2.70 2.40
66.9559 123.59 768.52 12.15 34.506 122.9431 0.0101 0.0625 2.70 2.40
19.5336 3757.89 196.6 12.15 34.506 89.5176 0.4198 0.0220 2.70 2.40
102.22 4032.55 245.15 12.15 34.506 172.2036 0.2342 0.0142 2.70 2.40
3.1123 147.8 897.62 12.15 34.506 73.0963 0.0202 0.1228 2.70 2.40
79.5737 126.86 946.17 12.15 34.506 149.5577 0.0085 0.0633 2.70 2.40
36.0708 3812.82 206.31 12.15 34.506 106.0548 0.3595 0.0195 2.70 2.40
85.6824 3977.62 235.44 12.15 34.506 155.6664 0.2555 0.0151 2.70 2.40
13.4249 92.87 907.33 12.15 34.506 83.4089 0.0111 0.1088 2.70 2.40
63.0365 71.93 936.46 12.15 34.506 133.0205 0.0054 0.0704 2.70 2.40
30.2823 382.59 0.27 12.15 34.506 86.2695 0.0443 0.0000 2.70 2.40
42.3619 623.4 60.56 12.15 34.506 98.3491 0.0634 0.0062 2.70 2.40
33.8991 129.65 55.66 12.15 34.506 89.8863 0.0144 0.0062 2.70 2.40
38.4908 129.7 83.37 12.15 34.506 94.478 0.0137 0.0088 2.70 2.40
33.7317 505.85 14.83 12.15 34.506 103.7157 0.0488 0.0014 2.70 2.40
48.8312 751.63 61.22 12.15 34.506 118.8152 0.0633 0.0052 2.70 2.40
38.2526 134.44 84.06 12.15 34.506 108.2366 0.0124 0.0078 2.70 2.40
43.9924 134.51 89.72 12.15 34.506 113.9764 0.0118 0.0079 2.70 2.40
17.1945 560.78 24.54 12.15 34.506 87.1785 0.0643 0.0028 2.70 2.40
32.294 696.7 51.51 12.15 34.506 102.278 0.0681 0.0050 2.70 2.40
21.7155 79.51 93.77 12.15 34.506 91.6995 0.0087 0.0102 2.70 2.40
27.4552 79.58 80.01 12.15 34.506 97.4392 0.0082 0.0082 2.70 2.40

FOUNDATION DESIGN

C1
Design Pr 41.349 T/M2

B (m) D (m)
0.600 0.350 .
FOOTING 2.700 2.400 0.750 0.675 d=(D-d') d'=0.075
M L (m) B (m) D (m) d (m)

Upward pressure = w 413.495 KN/M2


LIMIT STATE METHOD
LONG DIR SHORT DIR CHK FOR TWO WAY SHEA
PROJECT 1.050 m 1.025 m Mix
BM 547.05 KNm B.M. 586.478 KNm d/2 =
Shear 372.15 KN Shear 390.753 KN Perimeter atd/2
Pt % assumed =0.15 Tc = 0.29 N/mm2 Vu at d/2
eff. Depth 0.386 eff. Dept 0.379 eff. Depth @ d/2
Shear str 0.402 not okay shear str 0.382 okay Tv =
fck 25.000 N/mm2 fck 25.000 N/mm2 Tc allow
fy 500.000 N/mm2 fy 500.000 N/mm2

Ast= 1909.03 mm2 Ast= 2141.9 mm2


Pt % 0.118 Pt % 0.119
Pt to be p 0.120 Pt to be 0.120
Shear stre 0.385 not okay shear str 0.396 okay
Ast to be 1944.0 mm2 Ast to be 2187.0 mm2

nos spacing nos spacing


12 dia 17.20 131.84 12 dia 19.354 132.65
10 dia 24.76 93.15 10 dia 27.860 93.56
16 dia 9.67 224.9 16 dia 10.881 227.3
20 dia 6.19 333.7 20 dia 6.965 339.0
25 dia 3.97 483.2 25 dia 4.463 494.2

L 2700 mm LENGTH // TO DEPTH OF COLUMN


B 2400 mm WIDTH // TO WIDTH OF COLUMN
D 750 mm
DIA SPACIN AREA PROAREA REQD. Pt Provided
As // L 13 NOS DIA 16 187.500 26.149 19.440 O.K. 0.161
As // B 15 NOS DIA 16 182.143 30.171 21.87 O.K. 0.168
etabs input
FOR WIND
manual input

CANTY

PU Pmax Pmin RESULT


design (L) Ton/m2 Ton/m2 fact. For fact. For
D.L. S.B.C.
0 115.4481 18.53 17.10 O.K. 1.00 1.500 1.500 LIMIT
0 68.3171 20.78 -0.25 O.K. 1.00 1.200 1.200 EPX12
0 141.0598 33.71 9.83 O.K. 1.00 1.200 1.200 EPY12
0 61.774 12.74 6.33 O.K. 1.00 1.200 1.200 EPNX12
0 122.9431 22.36 15.58 O.K. 1.00 1.200 1.200 EPNY12
0 89.5176 27.46 0.17 O.K. 1.00 1.500 1.500 EPX15
0 172.2036 41.35 11.80 O.K. 1.00 1.500 1.500 EPY15
0 73.0963 15.25 7.31 O.K. 1.00 1.500 1.500 EPNX15
0 149.5577 27.17 18.99 O.K. 1.00 1.500 1.500 EPNY15
0 106.0548 30.24 2.50 O.K. 1.00 0.900 1.500 D9EPX15
0 155.6664 38.57 9.47 O.K. 1.00 0.900 1.500 D9EPY15
0 83.4089 16.69 9.05 O.K. 1.00 0.900 1.500 D9EPNX15
0 133.0205 24.39 16.67 O.K. 1.00 0.900 1.500 D9EPNY15
0 86.2695 14.63 12.00 O.K. 1.00 1.200 1.200 WDX12
0 98.3491 17.55 12.81 O.K. 1.00 1.200 1.200 WDY12
0 89.8863 14.53 13.21 O.K. 1.00 1.200 1.200 WDXN12
0 94.478 15.35 13.81 O.K. 1.00 1.200 1.200 WDYN12
0 103.7157 17.80 14.21 O.K. 1.00 1.500 1.500 WDX15
0 118.8152 21.15 15.52 O.K. 1.00 1.500 1.500 WDY15
0 108.2366 17.49 15.92 O.K. 1.00 1.500 1.500 WDXN15
0 113.9764 18.40 16.78 O.K. 1.00 1.500 1.500 WDYN15
0 87.1785 15.47 11.44 O.K. 1.00 0.900 1.500 D9WDX15
0 102.278 18.37 13.20 O.K. 1.00 0.900 1.500 D9WDY15
0 91.6995 14.79 13.52 O.K. 1.00 0.900 1.500 D9WDXN15
0 97.4392 15.62 14.46 O.K. 1.00 0.900 1.500 D9WDYN15
41.35 -0.25
S.B.C.
GROSS 32.71
CHK FOR TWO WAY SHEAR
25.000
0.338 1.03 1.28
4.600 m
2139.1 kn
0.527 m
0.88 mpa
1.250 1.00
SAFE Ks

Pt for 1way shear


0.282
0.303

You might also like