You are on page 1of 4

Equipment booking

Name of hirer Adam Hannan

Description of equipment required


What sort of camera? Camera charger? Tripod? Microphone? Headphones? Boom? Zoom recorder?
DCLR
Tripod
Lens 18 to 55

Date Time
Collect 25th January 9:00
Return 25th January 10:45

Please give as much notice as possible. Location filming requests MUST be


submitted at least 48 hours in advance to ensure batteries can be charged etc.
Call sheet

Name of The light shard


production
Date of filming 25th of January

Production team
Crew names Roles Contact details
Adam Director
Lucy Teleprompter operator

Actors names
Oliver Isaac
Shauna Brittney
Callum Alain 1
Rhys Alain 2

Your home address and contact details:

Location details

Where are you filming? Include a link to a map.

D203 the TV studio in the college

How will you get there?

Everyone has a different way of traveling

Who owns this location and who will let you in?

Their contact details:


Times
What time are you meeting at college?
8:40

What time are you meeting on location?


8:50

When will you start shooting?


9:00

Which scenes are you shooting?


Scene 3 of our project, the light shard

When will you take a break/s?

1 when 45 mins in

What are you doing about food and drink?

No food or drink on set

Predicted wrap time (when will you finish filming?)

10:20

What time will you be back at college?

Weather report (if outside)

What are your plans if the weather is really bad? How will you let your cast and crew know that?

Special considerations with regard to location/weather/activities etc


(what do your crew and cast need to bring with them eg props, costumes, warm clothes, food, drink)
Risk assessment

Hazards Potential risk Risk reduction strategies

What could cause an injury? What could happen? How will you make the shoot
safer?

Equipment bags People could trip over Keep them off the
them floor

You might also like