Free float -
Total float and free float
Resource Histogram -
Project Crashing -
Project overhead is per day extra cost for project management etc. Run 5 for activity C is not saving
any money nor a day so its pointless to crash C.
Report date is the end of day 3. DM says that 40% of work done and cost occurred is $1000
Earned
Value
Analysis
Exampl
e
Interpret the Earned Value graph
Make predictions using earned Value analysis
Draw an ADM (Arrow Diagram Method) network diagram for PERT problems
This is CPM diagram, Activity is on arrow, each arrow points to lower to higher number, each node
Calculate Forward and backward pass of an ADM network diagram for PERT problems
First Write the mean at down and variance, deviation above the arrow.
Forward pass
Backward pass
How to calculate expected duration, variance and standard deviation for entire project?
Expected duration is sum of all durations of activities which are on critical path (highlighted in red)
Variance = sum of all activity's variance
Standard Deviation = square root of project variance = 2.92 days that means project will complete
2.92 days early or late.
SD is not sum of all activity's deviation due to some central limit theorem. Always consider sq root of
project variance.
What is the probability that an activity will finish early, late, or during some time interval?
What is the
probability
that an
activity G
finishes in
less than 3
days?
How to estimate project completion date with at least 95% confidence level?
This is your ADM and you have been asked for 95% confidence level.
So we know Z score is 95%. P(Z) = 0.95 i.e. 95%
Look into Z score table. The 0.95 is between 0.9495 and 0.9505 at 1.6 and 0.045 so Z = 1.645
We
need
to find
value
of X
So there is
95% of
confidence
that this
project will
complete
in 45.803
days
What is a probability that a node will have a certain float/slack in PERT problems?