You are on page 1of 15

REPUBLIC OF THE PHILIPPINES

TABLE OFFICE OF THE CITY/MUNICIPAL


ENGINEER/BUILDING OFFICIAL
OF
CONTENTS
DISTRICT/CITY/MUNICIPALITY

ARCHITECTURAL LAND USE & ZONING

A-1 PERSPECTIVE VIEW & TABLE OF


CONTENTS

A-2 GROUND, SECOND FLOOR, ROOF,


REFLECTED CEILING PLANS

A-3 LONGITUDINAL, CROSS SECTION,


FRONT, REAR, RIGHT, LEFT SIDE
ELEV.

A-4 LEFT SIDE ELEV., SCHED. OF


DOORS & WINDOWS, BALCONY
LINE & GRADE
RAILING, EAVES,
VENT., & RAMP DETAILS

A-6 STAIR, HANDRAIL DETAILS

A-5 TOILET, CONC. COUNTER,


SUN BREAKER DETAILS

ARCHITECTURAL

STRUCTURAL

S-1 FOUNDATION, SCHEDULE OF SLAB


2ND FLOOR & ROOF FRAMING PLAN
STRUCTURAL
1 PERSPECTIVE VIEW S-2 DET. STAIR ON GRADE, RAMP &
BEAM, FOOTING/TIE BEAM/COLUMN
A-1 SCALE : N T S
DETAIL
S-3 TRUSS DIAGRAM, STAIR DET.
DETAILS OF STEEL CONNECTION

SANITARY

ELECTRICAL

E-1 GEN. NOTES, LEGEND, LOAD


SCHEDULE, RISER DIAGRAM, SINGLE
LINE DIAGRAM

E-2 GROUND FLOOR POWER LAYOUT


SECOND FLOOR POWER LAYOUT

ELECTRICAL
E-3 GROUND FLOOR LIGHTING LAYOUT
SECOND FLOOR LIGHTING LAYOUT

SANITARY

P-1 PLUMBING RO-IN LAYOUT, ROOF


DRAIN LAYOUT & ISOMETRIC VIEW

P-2 SEPTIC TANK, CATCH BASIN DETAILS


MECHANICAL
LEGEND, NOTES & DESIGN CRITERIA

CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL : APPROVED FOR ACCREDITATION : CONCURRED : PROJECT TITLE : PROJECT NO: OWNER : SHEET NO:

REPUBLIC OF THE PHILIPPINES DESIGNED BY:


IC
o
f t he PH
IL
I
F
E A

TWO STOREY DEPARTMENT OF EDUCATION


DEPARTMENT OF EDUCATION (DepED)
T
M
L

P
B

TA
PU

I TO R I NG

A-1
IN

SK
RE

ES

EMMANUEL P. CUNTAPAY SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI SIX CLASSROOM DepED
F O RC E

ALBERT Z. DE BELEN
ON

ENCODED BY: Max C.


D

TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING


M
PE

NO

EN

MCMXCIX
&

IN
G
I

T
A

E N

G.I. ROOF SCHOOL BUILDING


E
R

ER
T

IN SM
A

A S SE S
T C
M
E U G ,
DE

ARCHITECT / ENGINEER
TN

CHIEF, ARCHITECTURAL DIVISION OIC, DIRECTOR III OIC, DIRECTOR IV


F O

UNDERSECRETARY
MERALCO AVENUE, PASIG CITY
6
SHEET CONTENTS :
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED) CHECKED BY:
PRC NO. : 0010990 TIN : 149 460 161 PERSPECTIVE VIEW
PTR NO. : DATE : 27 OCT. 2002 TABLE OF CONTENTS
LOCATION : DATE : 08/06/2004

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


A B C
CONCRETE SUNBREAKER
1 2 3 4 5 6 7 8 9500
1000 7000 2500 1000
(SEE DETAIL)
9000 9000 9000 4500 600 APEX LINE OF TRUSS
150mm THK. CHB WALL 4500 4500 4500 4500 4500 4500
PLASTER AND PAINT FIN. CONCRETE
GA. 26 CORR. G.I.
SUNBREAKER (SEE

2500
SHEET ROOFING

LINE OF ROOF
DETAIL) (PAINT FINISH)
1

A-3
675

TOP OF ROOF BEAM


A
GA. 26 PLAIN G.I. SHEET
GUTTER ON 12x300mm
W-1 FIBER CEMENT FASCIA BOARD

WF1 (PAINT FINISH)

3200
LANDING

150mm THK. CHB


DN. PLAIN PLASTER
SECOND FLR. LVL.

6725
PAINT FIN.
7000

CLASSROOM-4 CLASSROOM-5 CLASSROOM-5


WF1
FL1 FL1 FL1

3200
32mm G.I. PIPE
HANDRAIL WITH 32mm
VERT. SUPPORT

GROUND FLR. LVL. @300mm O.C. (PAINT

325
NAT. GRD. LN. FINISH)

B
4 LEFT SIDE ELEVATION
2500

FL1 C O R R I D O R
A-3 SCALE : 1 : 100 METERS

FD WF3 FD FD FD FD FD

RAILING (SEE DETAIL) ROOF LINE C B A


9500

1000 2500 7000 1000

APEX LINE OF TRUSS


2 SECOND FLOOR PLAN GA. 26 CORR. G.I.

SHEET ROOFING (PAINT


A-2 SCALE : 1 : 100 METERS

2500
FINISH)

TOP OF ROOF BEAM GA. 26 PLAIN G.I.


SHEET GUTTER ON
12x300mm FIBER
CEMENT FASCIA BOARD

1 2 3 4 5 6 7 6 (PAINT FINISH)

3200
9000 9000 9000 4500 150mm THK. CHB PLAIN
PLASTER PAINT FIN.
4500 4500 4500 4500 4500 4500 2550 1700

150mm THK. CHB WALL SECOND FLR. LVL.

6725
3
PLASTER AND PAINT FIN.
A-3

3200
LN. OF SUNBREAKER
SCHEDULE OF FINISH
WF2 W-3
675

32mm G.I. PIPE

A
HANDRAIL WITH 32mm
VERT. SUPPORT

800
850
FLOORS :
SHE 3 GROUND FLR. LVL. @300mm O.C. (PAINT
HE

325
D-4
D-3
D-4 A-3 NAT. GRD. LN. FINISH)

1100
FL1 - PLAIN CEMENT FLOOR FINISH

860
D-3

3 RIGHT SIDE ELEVATION


WF4 D-2

1500
A-2 SCALE : 1 : 100 METERS FL2 - PLAIN CEMENT FLOOR ROUGH

7000
7000

HCR WITH GROOVES

1 2 3

4776
FL3 - 200X200 VITRIFIED FLR TILES
9500

( UNGLAZED )
WF1

WALLS :

B CONCRETE HOLLOW
BLOCKS
WF1 - 150 MM THK. CHB W/ PLAIN
UP CEMENT PLASTER FIN (PAINT)
CONCRETE SLAB
2500

POLYETHYLENE SHEET DAMP PROOFING


FL1 C O R R I D O R
GRAVEL BEDDING WF2 - 150mm THK. CHB w/200X200mm
FD WF3 FD FD FD FD VITRIFIED WALL TILES ( GLAZED )
C WF3

RAILING (SEE DETAIL)


UP RAMP WF3 - 100mm THK. CHB PLAIN CEMENT
UP
PLASTER w/50mm G.I. PIPE
5 HANDRAIL PAINT FIN.
1 GROUND FLOOR PLAN ENTRY A-3
5 DAMP PROOFING DET.
NOT TO SCALE
A-2 SCALE : 1 : 100 METERS
A-2 WF4 - 100mm THK. CHB w/200X200mm
VITRIFIED WALL TILES ( GLAZED )

CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL : APPROVED FOR ACCREDITATION : CONCURRED : PROJECT TITLE : PROJECT NO: OWNER : SHEET NO:

REPUBLIC OF THE PHILIPPINES DESIGNED BY:


IC
o
f t he PH
IL
I
F
E A

TWO STOREY DEPARTMENT OF EDUCATION


DEPARTMENT OF EDUCATION (DepED)
T
M
L

P
B

TA
PU

I TO R I NG
IN

SK
RE

ES

DepED A-2
EMMANUEL P. CUNTAPAY SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI SIX CLASSROOM
F O RC E

ALBERT Z. DE BELEN
ON

ENCODED BY: Max C.


D

TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING


M
PE

NO

EN

MCMXCIX
&

IN
G
I

T
A

E N

G.I. ROOF SCHOOL BUILDING


E
R

ER
T

IN SM
A

A S SE S
T C
M
E U G ,
DE

ARCHITECT / ENGINEER
TN

CHIEF, ARCHITECTURAL DIVISION OIC, DIRECTOR III OIC, DIRECTOR IV


F O

UNDERSECRETARY
MERALCO AVENUE, PASIG CITY
6
SHEET CONTENTS :
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED) CHECKED BY:
PRC NO. : 0010990 TIN : 149 460 161 FLOOR PLANS
PTR NO. : DATE : 27 OCT. 2002 LEFT & RIGHT ELEVATION
LOCATION : DATE : 08/06/2004
SCHEDULE OF FINISHES, DAMP PROOFING
NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


1 2 3 4 5 6 7 8
9000 9000 9000 A B C
600 4500 4500 4500 4500 4500 4500 4500 600 9500

APEX OF TRUSS 1000 7000 2500 1000

TOP OF TRUSS

2500 SEE TRUSS DETAILS

2500
TOP OF ROOF BEAM SEE TRUSS DETAIL

TOP OF ROOF BEAM

538
3200
10200

3200
10
W-1 W-2
4 5 6 W-1 A-5
SECOND FLOOR LEVEL
LANDING
CLASSROOM 3
SECOND FLOOR LEVEL CORRIDOR

6725
EXPOSED CEILING UNDER
SLAB PAINT FIN.
W-3
3200

50mm GA# 40
200x200mm G.I. PIPE

3200
GLAZED WALL HANDRAIL
TILES 9
W-1 W-2
1 2 3 HE SHE A-4
GROUND FLOOR LEVEL
150mm THK. CHB WALL
325

NAT. GRD. LN.


CLASSROOM 1 PLASTER PAINT FIN.
GROUND FLOOR LEVEL

325
FIN. GRD. LN.

3 LONGITUDINAL SECTION EXPOSE CEILING


UNDERSLAB PAINT FINISH
A-3 SCALE : 100
4 CROSS SECTION

8 7 6 5 4 3 2 1 A-3 SCALE : 1 : 100 METERS


2-32mm G.I. PIPE

200
HANDRAIL w/32mm
VERT. SUPPORT @300mm
9000 9000 9000
OC (PAINT FIN.)
600
600 4500 4500 4500 4500 4500 4500 4500

APEX LINE OF TRUSS 2-32mm G.I. PIPE HANDRAIL

900
GA.26 CORR. G.I.
SHEET ROOFING w/32mm VERT. SUPPORT
@300mm O.C.(PAINT FIN.)
(PAINT FINISH) 12mM STEEL DOWEL
2500

700
EMBEDD IN CONC.
NON-SKID PLAIN A-3
GA.26 PLAIN G.I. CEMENT FLOOR FINISH NON-SKID PLAIN CEMENT
SHEET GUTTER ON w/GROOVE LINES FLOOR FIN. w/ GROOVE

200
TOP OF ROOF BEAM
12x300mm FIBER LINES

100
200
CEMENT FASCIA BD.

900
700

1200
(PAINT FINISH)

900

700
3200

300
PLAIN CEMENT
PLASTER PAINT WALL
FINISH

W-1
SECOND FLOOR LEVEL
6 DET. ELEVATION OF RAMP 7 DETAIL SECTION
6725

GA. 26 CORR. G.I.


SHEET SUN BREAKER A-3 SCALE 1:50 M A-3 SCALE 1:10 M

ON STEEL FRAMING 100


3200

(SEE DETAIL)
W-3
100X100 CONCRETE
SKIRTING
5 6
GROUND FLOOR LEVEL
4500
325

FIN. GRD. LN. 32 mm G.I PIPE VERTICAL


SUPPORT @ 300mm ON

REAR ELEVATION
CENTER PROVIDE 12mm
2

100
STEEL DOWELS (PAINT FIN.)

150
A-3 SCALE : 1 : 100 METERS

1 2 3 4 5 6 7 8 B

9000 9000 9000

600 4500 4500 4500 4500 4500 4500 4500 600


APEX LINE OF TRUSS

2500
GA.26 CORR G.I. SHEET C O R R I D O R
ROOFING (PAINT FIN.)
8 SPOT DETAIL
2500

1200
A-3 SCALE 1:5 M

GA.26 PLAIN G.I.SHT.


TOP OF ROOF BEAM
GUTTER ON 12x300mm
THK FIBER CEMENT
C

175
FASCIA BOARD (PAINT
FIN.)
3200

D-1 D-1 D-1 D-1 D-1 D-1

1400
1400
100mm THK. CHB RAILING RAMP UP

W-2 W-2 W-2 W-2 W-2 W-2


w/50mm G.I. PIPE HANDRAIL 6
W-1
SECOND FLOOR LEVEL (PAINT FINISH) A-3
6725

3600
NON-SKID PLAIN
3200

5150
D-1 D-1 D-1 D-1 D-1 D-1 32mm G.I. PIPE CEMENT FLOOR

HANDRAIL w/32mm FINISH w/GROOVE TOTAL RUN OF RAMP 32mm G.I. PIPE
LINES
VERT. SUPPORT @150mm 7 HANDRAIL w/32mm
D-1
W-2 W-2 W-2 W-2 W-2 W-2 O.C. (PAINT FIN.) A-3 VERT. SUPPORT @300mm
GROUND FLOOR LEVEL
O.C. (PAINT FIN.)
325

NAT. GRD. LN.


5 DET. PLAN OF RAMP
1 FRONT ELEVATION A-3 SCALE 1:50 M

A-3 SCALE : 1 : 100 METERS

CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL : APPROVED FOR ACCREDITATION : CONCURRED : PROJECT TITLE : PROJECT NO: OWNER : SHEET NO:

REPUBLIC OF THE PHILIPPINES DESIGNED BY:


IC
o
f t he PH
IL
I
F
E A

TWO STOREY DEPARTMENT OF EDUCATION


DEPARTMENT OF EDUCATION (DepED)
T
M
L

P
B

TA
PU

I TO R I NG
IN

SK
RE

ES

DepED A-3
EMMANUEL P. CUNTAPAY SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI SIX CLASSROOM
F O RC E

ALBERT Z. DE BELEN
ON

ENCODED BY: Max C.


D

TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING


M
PE

NO

EN

MCMXCIX
&

IN
G
I

T
A

E N

G.I. ROOF SCHOOL BUILDING


E
R

ER
T

IN SM
A

A S SE S
T C
M
E U G ,
DE

ARCHITECT / ENGINEER
TN

CHIEF, ARCHITECTURAL DIVISION OIC, DIRECTOR III OIC, DIRECTOR IV


F O

UNDERSECRETARY
MERALCO AVENUE, PASIG CITY
6
SHEET CONTENTS :
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED) CHECKED BY:
PRC NO. : 0010990 TIN : 149 460 161 FRONT& REAR ELEVATION, SECTIONS, DET OF
PTR NO. : DATE : 27 OCT. 2002 RAMP & RAILING
LOCATION : DATE : 08/06/2004

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


1000 700 4 EQUAL PARTS = 2500 2 EQUAL PARTS = 1225 4 EQUAL PARTS = 2500
900

7-BLADES
260
260
300

±635
600 GA#26 CORR. G.I.
ROOFING SHT. PAINT FIN.

14-BLADES

14-BLADES
±1240
6mm THK. MARINE PLYWOOD

±1240
CEILING ON 50x50mm CEILING
JOIST @600mm BW

2400
2400

2400

2400
2100

2100
2054
STAINLESS STEEL
38mm TEKSCREW

1200

1765
KICKING PLATE
800
GA#26 GI STRAP

1500
COPPER RIVET

900
900
12x300mm FIBER CEMENT

300
FASCIA BOARD FIX W/METAL

300
FFL FFL SCREW ON STL. FRAME PAINT
FINISH
CLASSROOM TOILET (DISABLED) TOILET TOILET (CUBICLE)
TANGUILE PANEL DOOR ON 50X150 MM HOLLOW CORE FLUSH TYPE SWING HOLLOW CORE FLUSH TYPE SWING DOOR SWING DOOR ON 50X100 JALOUSIE WINDOWS WITH CLEAR GLASS JALOUSIE WINDOWS WITH CLEAR GLASS BLADES JALOUSIE WINDOWS WITH CLEAR GLASS
GA#26 GI GUTTER PAINT FIN.
D-1 THK. YACAL/GUIJO JAMB W/ FIXED D-2 DOOR W/ MARINE PLYWOOD FACING D-3 W/ MARINE PLYWOOD FACING INSIDE AND D-4 YACAL/GUIJO DOOR JAMB BLADES ON STANDARD ALUMINUM CASING ON STANDARD ALUMINUM CASING AND FIXED BLADES ON STANDARD ALUMINUM CASING
20x20X2mm ANGULAR BAR
AND FIXED CLEAR GLASS TRANSOM ON CLEAR GLASS TRANSOM ON 50X150
CLEAR GLASS TRANSOM COMPLETE INSIDE AND ORDINARY OUTSIDE
ORDINARY OUTSIDE COMPLETE W/ COMPLETE WITH HARDWARES
W-1 W-2 W-3 ON 50X150 YACAL/GUIJO JAMB COMPLETE FOR FASCIA BOARD FRAME
WITH HARDWARES AND ACCESSORIES
COMPLETE W/ HARDWARES AND HARDWARES AND ACCESSORIES ACCESSORIES 50X150 YACAL/GUIJO JAMB COMPLETE WITH YACAL/GUIJO JAMB COMPLETE WITH WITH HARDWARES AND ACCESSORIES
COATED WITH PRIMER
ACCESSORIES PROVIDE KICK PLATE HARDWARES AND ACCESSORIES HARDWARES AND ACCESSORIES

BASKET STRAINER

1 2 3 4 5 6 7 8 3 DOORS AND WINDOWS SCHEDULE


9000 9000 9000 A-4 SCALE : 1:50m

600 4500 4500 4500 4500 4500 4500 4500 600 75mm PVC
DOWNSPOUT PAINT
FINISH
RD RD

8
SPOT DETAIL (EAVES)
1000

A A-4 SCALE : 1:10 m.


1000

TOP CHORD SEE STRUCTURAL DETAIL

38mm TEKSCREW

C-PURLIN (SEE STRUC'L DETAIL)


GA.26 CORR. G.I. SAG ROD SEE STRUCTURAL DETAIL
SHEET ROOFING
7000

PAINT FINISH
6mm THK. MARINE PLYWOOD CEILING
ON 50x50mm CEILING JOIST
@600mm BW
GA. 26 PLAIN G.I. SHT.
RIDGE ROLL PAINT FIN. 6mm THK. ORD. GA#26 GI STRAP
PLYWOOD CEILING W/ ROOF
6mm GROOVE ON
5
BEAM GA#26 G.I. GUTTER ON 12x300mm
A-4 FIBER CEMENT FASCIA BOARD PAINT
50x50mm CEILING
FIN.
JOIST @600mm BW

(PAINT FIN.)
B GA.26 PLAIN.
SHEET FLASHING
G.I.
ON
BASKET STRAINER

12x300mm FIBER
75mm PVC DOWNSPOUT PAINT
2500

CEMENT FASCIA BOARD 8


FINISH
PAINT FINISH A-4

CEILING VENT (SEE DETAIL)

C
LINE OF STRUCTURE

6
SECTION DETAIL (EAVES)
1000

GA.26 PLAIN. G.I.

A-4 SCALE : 1 : 40 m.
RD RD SHEET GUTTER
PAINT FINISH
LN. OF STRUCTURE SEE TRUSS DET.

2 ROOF PLAN 4
A-4
FR. 25x75mm WOOD
6 A-4 SCALE : 1 : 100 METERS
FRAMEPAINT FIN.

A-4
1 2 3 4 5 6 7 8
9000 9000 9000 4500 600 6mm THK. ORD.

300
PLYWD. CEILING
600 4500 4500 4500 4500 4500 4500
(PAINT) ON 50x50mm CONC. BEAM
CLG. JST. @600mm
OC BW
1000

A 1175
25x25mm WOOD VENT
6mm THK. MARINE PROVIDE INSECT SCREEN
FR. QUARTER-C
PLYWD. CEILING
MOULDING CEILING
LIGHTING FIXTURE
CONTACT TO CONC. (PAINT) ON 50x50mm
7
DETAIL PLAN (VENT.)
CLG. JST. @600mm
WALL
6mm THK. ORD PLYWOOD CEILING OC BW
w/6mm GROOVE ON 50x50mm
5
SPOT DETAIL (CORNER CLG) A-4 SCALE : 1 : 10 m.
CLEILING JOISTS (PAINT FIN.)
7000

A-4 SCALE : 1 : 10 m.

25x25mm WOOD VENT.


PROVIDE INSECT SCREEN
10mm @250mm
50 12 325 12 50 ON CENTER

100
100
b
6mm THK. MARINE PLYWOOD CEILING

w/GROOVE ON 50x50mm CEILING 12x12mm GROOVE


2500

JOISTS (PAINT FIN.)


CEILING VENT. (SEE BEAM REBARS SEE
6 25 300
DETAIL) 6mm THK PLYWOOD STRUCTURAL DETAIL
FR.25x75mm CEILING ON 50x50mm 675
c VENT FRAME CEILING JOIST @600mm
1000

GA.26 PLAIN G.I. GUTTER


(PAINT FIN.) OC. BW (PAINT FIN.)
ON 12x300mm THK.
FIBER
BOARD
CEMENT FASCIA 4
SECTION DETAIL (VENT.) 9 CONCRETE SUNBREAKER DET.
1 SECOND FLOOR REFLECTED CEILING PLAN A-4 SCALE : 1 : 5 m A-4 SCALE: 1:10 mts.

A-4
A-4 SCALE : 1 : 100 METERS

CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL : APPROVED FOR ACCREDITATION : CONCURRED : PROJECT TITLE : PROJECT NO: OWNER : SHEET NO:

REPUBLIC OF THE PHILIPPINES DESIGNED BY:


IC
o
f t he PH
IL
I
F
E A

TWO STOREY DEPARTMENT OF EDUCATION


DEPARTMENT OF EDUCATION (DepED)
T
M
L

P
B

TA
PU

I TO R I NG
IN

SK
RE

ES

DepED A-4
EMMANUEL P. CUNTAPAY SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI SIX CLASSROOM
F O RC E

ALBERT Z. DE BELEN
ON

ENCODED BY: Max C.


D

TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING


M
PE

NO

EN

MCMXCIX
&

IN
G
I

T
A

E N

G.I. ROOF SCHOOL BUILDING


E
R

ER
T

IN SM
A

A S SE S
T C
M
E U G ,
DE

ARCHITECT / ENGINEER
TN

CHIEF, ARCHITECTURAL DIVISION OIC, DIRECTOR III OIC, DIRECTOR IV


F O

UNDERSECRETARY
MERALCO AVENUE, PASIG CITY
6
SHEET CONTENTS :
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED) CHECKED BY:
PRC NO. : 0010990 TIN : 149 460 161 SCHEDULE OF DOORS AND WINDOW, ROOF
PTR NO. : DATE : 27 OCT. 2002 AND REFLECTED CEILING PLAN, EAVES, VENT.
LOCATION : DATE : 08/06/2004
AND SUN BREAKER DETAIL
NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


3
5 A-5
6
5 50mm G.I. PIPE SCH.
50mm G.I. PIPE SCH. 250
40 PAINT FIN.
4500 A-5 40 PAINT FIN.
2200 2200 50mmG.I. PIPE SCH.
100 146 40 PAINT FIN.
100
50mm G.I. PIPE

50
SCHEDULE 40
19mm SQUARE BAR (PAINT FINISH)
19mm SQUARE BAR
WELD TO G.I. PIPE
W-1 WELDED TO G.I. PIPE
HANDRAIL @146mm O.C.
HANDRAIL @146mm O.C.

PLAIN CEMENT STEEL


19mm SQUARE BAR
TROWELL FIN.

900
WELDED TO G.I. PIPE
19mm SQUARE BAR
2500

LANDING HANDRAIL @146mm O.C.


WELD TO G.I. PIPE

TYPICAL

L
HANDRAIL @146mm O.C.
9

900

A L
50
8
A-5

900

850
A-5 6 SECOND F.F.L.
5

W
HANDRAIL DETAIL

TYPICAL
A-5

±168
18 17

146
ANCHOR @R.C. STAIR

19 16
A-5 SCALE : 1:20 mts

50
LANDING ANCHOR @R.C. STAIR
TREAD
15 50mm G.I. PIPE SCH.
DN
40 w/19mm SQ. BAR
@ 292mm EACH = 4672mm

14
@146mm ON CENTER 146
25x25x2mm ANGULAR
7000

13 PAINT FIN.
BAR NOSING
7 9 SPOT DETAIL
12 292
25
CRASH RAILING
TYPICAL
11
A-5 SCALE : 1:20 mts A-5 SCALE : 1:20 MTS

10
4 SECTION DETAIL

25
2x25x25mm
4672

A-5 SCALE : 1:20 mts


ANGULAR BAR

337
NOSING @STEP

12x12x2mm FLAT
16 TREADS

BAR STRAP
@600mm O.C.

175
50mm SCH. 40 G.I.
175 50mm G.I. PIPE
PIPE PAINT FIN. 50
SCHEDULE 40
50 50
6 NOSING DETAIL (PAINT FINISH)
19mm SQ. BAR

B A-5 SCALE : 1:10 mts ANCHORED TO THE WALL

(PAINT FIN.)

TREAD
(SECOND FLOOR TO GROUND FLOOR)

100

50
900mm FROM
2 DETAIL PLAN OF STAIR 19 mm SQUARE
BAR ANCHOR TO

1:50 mts THE WALL (PAINT


A-5 SCALE :
FIN.)

5 6
7000 2500

8 SPOT DETAIL
ROOF LINE 2460 4540
4500

2200 A-5 SCALE : 1:5 MTS

2067

A 10 SPOT DETAIL
W-1
11 A-5 SCALE : 1:5 MTS
3200
1100

W-1 A-5
TOILET 4 146
2328
100

A-6

200
100 650 100
@168
850

900
700
SECOND FLOOR LINE CORRIDOR
2 RISERS

19 50mm G.I.PIPE SCH. 40


17
C HANDRAIL w/25mm SQ.
337

18
18 16
LANDING 17
50mm SCH. 40 G.I. BRACKECT @600mm O.C. C
16 PAINT FIN.
19 15 15
PIPE HANDRAIL w/19mm
SQ. BAR @146mm O.C
14
14 38mm STAINLESS
13
2856
= 4672mm

STEEL GRAB BAR 1


12 5

200
13
7000

W-3 0
5mm THK.

0
11

20
PLASTER PAINT FIN. FACIAL MIRROR 700 400 10
RISERS @168 =

12
3200

100mm THK CHB RAILING

700
9
2863

PLASTER AND PAINT FIN.


2763

11 8

600
7 SECOND FLOOR LEVEL

50
200x200mm VITRIFIED
16TREADS @ 292mm EACH

10 50mm G.I. PIPE SCH.


GLAZED WALL TILES 6
40 w/19mm SQ. BAR
295

300
5

1726
1625
4672

200
9 @146mm ON CENTER 292 4
PAINT FIN. CS LAV 3
8 342

±168
WC

±900

900
WC 2 ELEV.
787

700
17

7
GROUND FLOOR LINE
1
CORRIDOR SCALE: 1:50m DETAIL
SHE HCR SCALE: 1:20m
6
325

10 NATURAL GRADE LINE


5
A-5 11 BALCONY RAILING DET.
4
2460 4672
A-5 SCALE: AS SHOWN
292

3
16 TREADS @ 292 = 4672
50

B 1

UP 3 DETAIL SECTION OF STAIR


7
(GRD FLOOR TO SECOND FLOOR)
1
A-5 A-6 SCALE : 1:50 mts.

DETAIL PLAN OF STAIR


A-5 SCALE : 1:100 mts

CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL : APPROVED FOR ACCREDITATION : CONCURRED : PROJECT TITLE : PROJECT NO: OWNER : SHEET NO:

REPUBLIC OF THE PHILIPPINES DESIGNED BY:


IC
o
f t he PH
IL
I
F
E A

TWO STOREY DEPARTMENT OF EDUCATION


DEPARTMENT OF EDUCATION (DepED)
T
M
L

P
B

TA
PU

I TO R I NG
IN

SK
RE

ES

DepED A-5
EMMANUEL P. CUNTAPAY SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI SIX CLASSROOM
F O RC E

ALBERT Z. DE BELEN
ON

ENCODED BY: Max C.


D

TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING


M
PE

NO

EN

MCMXCIX
&

IN
G
I

T
A

E N

G.I. ROOF SCHOOL BUILDING


E
R

ER
T

IN SM
A

A S SE S
T C
M
E U G ,
DE

ARCHITECT / ENGINEER
TN

CHIEF, ARCHITECTURAL DIVISION OIC, DIRECTOR III OIC, DIRECTOR IV


F O

UNDERSECRETARY
MERALCO AVENUE, PASIG CITY
6
SHEET CONTENTS :
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED) CHECKED BY:
PRC NO. : 0010990 TIN : 149 460 161 STAIR AND RAILING DETAIL
PTR NO. : DATE : 27 OCT. 2002
LOCATION : DATE : 08/06/2004

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


PLAIN CEM. PLASTER 3mm THK. FACIAL
PAINT FIN. MIRROR ON AL. FRAMING

1100

650

200x200mm VITRIFIED
7 8 200x200mm GLAZED
1100
WALL TILES (GLAZED)
WALL TILES 350 400 350

600
4500
PLAIN CEM. PLASTER
PAINT FIN.
PLAIN CEMENT PLASTER
PAINT WALL FINISH

200

1710
100 1700 200X200 VITRIFIED
CERAMIC WALL
2ND FLR. LVL.
TILES ( GLAZED )

600
W-3 COUNTER SINK
4

300
512

LANDING LVL. A-7 LANDING

100

800
6
A-7
3200

W-3
2688

2738
2613
CONC. COUNTER 5 DET.PLAN OF C. SINK 6 DETAIL ELEVATION

1600
SINK

300
A-7 SCALE : 1:20 M
A-7 SCALE : 1:20 m.
800

WC

800
MALE
CLASSROOM LVL. TOILET
50

300
TOILET LVL.

600 URINAL

2 DETAIL SECTION OF TOILET


A-7 SCALE : 1:40 m.

DET. SECTION

2680 1820 4 SPOT DETAIL


3
A-7 A-7 SCALE : 1:20 m.

8
A-5 LINE OF DOOR JAMB

850
SHE
1100

SECOND FLOOR LINE


HE
2
A-7 LANDING FLOOR LINE 17
D-4
2074

D-4
16
D-3 50mm SCH. 40 G.I.
15 PIPE HANDRAIL w/19mm
SQ. BAR @300mm OC.
14
1100

10
13
850

D-3 38mm STAINLESS A-5


12
STEEL GRAB BAR
W-3
5mm THK. FACIAL 11

0
20
PLASTER PAINT FIN. 150mm THK CHB WALL
MIRROR
UNDER SLAB 700 400 10 PLASTER PAINT FIN.

3200
9

2856
8

2763

600
7
200x200mm VITRIFIED
D-2
GLAZED WALL TILES 6

2100

2100
5

200
1609 1074
1500

300
1625
292 4
3
342
HCR

±920
2

168
1
SHE HCR
GROUND FLOOR LINE

NATURAL GRADE LINE

1 DET. PLAN OF TOILET 922 1259 1615 3336

A-7 SCALE : 1:30 m.

3 DET. SECTION OF TOILET/STAIR


A-7 SCALE : 1 : 30 m.

CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL : APPROVED FOR ACCREDITATION : CONCURRED : PROJECT TITLE : PROJECT NO: OWNER : SHEET NO:

REPUBLIC OF THE PHILIPPINES DESIGNED BY:


IC
o
f t he PH
IL
I
F
E A

TWO STOREY DEPARTMENT OF EDUCATION


DEPARTMENT OF EDUCATION (DepED)
T
M
L

P
B

TA
PU

I TO R I NG
IN

SK
RE

ES

DepED A-6
EMMANUEL P. CUNTAPAY SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI SIX CLASSROOM
F O RC E

ALBERT Z. DE BELEN
ON

ENCODED BY: Max C.


D

TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING


M
PE

NO

EN

MCMXCIX
&

IN
G
I

T
A

E N

G.I. ROOF SCHOOL BUILDING


E
R

ER
T

IN SM
A

A S SE S
T C
M
E U G ,
DE

ARCHITECT / ENGINEER
TN

CHIEF, ARCHITECTURAL DIVISION OIC, DIRECTOR III OIC, DIRECTOR IV


F O

UNDERSECRETARY
MERALCO AVENUE, PASIG CITY SHEET CONTENTS :

6
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED) CHECKED BY:
PRC NO. : 0010990 TIN : 149 460 161 TOILET DETAIL
PTR NO. : DATE : 27 OCT. 2002
LOCATION : DATE : 08/06/2004

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


1 2 3 4 5 6 7 8

4500 4500 4500 4500 4500 4500 4500

F-3 F-3 F-3 F-3 F-3 F-3 F-3 F-3


C-3 C-3 C-3 C-3 C-3 C-3 C-3 C-3

A TG-3 TG-3 TG-3 TG-3 TG-3 TG-3 TG-3

TG-2

TG-2

TG-2

TG-2

TG-2
7000
100mm THICK
SLAB ON FILL
WITH 10mm
SPACED AT 400
BOTHWAYS

F-2 F-2 F-2 F-2 F-2 F-2 F-2 F-2


C-2 C-2 C-2 C-2 C-2 C-2 C-2 C-2

B TG-3 TG-3 TG-3 TG-3 TG-3 TG-3 TG-3

2500

TG-1

TG-1

TG-1

TG-1
B

S-3

F-1 F-1 F-1 F-1 F-1 F-1 F-1 F-1


C C-1
TG-3
C-1
TG-3
C-1
TG-3
C-1
TG-3
C-1
TG-3
C-1
TG-3
C-1
TG-3
C-1

A FOUNDATION PLAN
S-1 SCALE : 1:100 M.

1 2 3 4 5 6 7 8

4500 4500 4500 4500 4500 4500 4500

G-3 G-3 G-3 G-3 G-3 G-3 G-3a


A

STAIR WELL
S-1 S-1 S-1 S-1 S-1 S-1
G - 7

G - 7

G - 7

G - 7

G - 7

G - 7
B-1 B-1 B-1 B-1 B-1 B-1 CB-1
7000

G-5

G-5
B-2
S-2
S-1 S-1 S-1 S-1 S-1 S-1

G-2 G-2 G-2 G-2 G-2 G-2 G-2


B
S-2 S-2 S-2 S-2 S-2 S-2 S-2
2500

G-4

G-6

G-6

G-6

G-6

G-6

G-6

G-4
G-1 G-1 G-1 G-1 G-1 G-1 G-1
C

B 2ND FLOOR FRAMING PLAN


S-1 SCALE : 1:100 M.

CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL : APPROVED FOR ACCREDITATION : CONCURRED : PROJECT TITLE : PROJECT NO: OWNER : SHEET NO:

REPUBLIC OF THE PHILIPPINES DESIGNED BY:


IC
o
f t he PH
IL
I
F
E A

TWO STOREY DEPARTMENT OF EDUCATION


DEPARTMENT OF EDUCATION (DepED)
T
M
L

P
B

TA
PU

I TO R I NG
IN

SK
RE

ES

ANTONIA M. MANIO WILFREDO S. LOPEZ SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI SIX CLASSROOM DepED
F O RC E

S-1
ON

ENCODED BY: Max C.


D

TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING


M
PE

NO

EN

MCMXCIX
&

IN
G
I

T
A

E N

G.I. ROOF SCHOOL BUILDING


E
R

ER
T

IN SM
A

A S SE S
T C
M
E U G ,
DE
TN

OIC, STRUCTURAL DIVISION OIC, DIRECTOR III OIC, DIRECTOR IV


F O

CIVIL ENGINEER UNDERSECRETARY


MERALCO AVENUE, PASIG CITY SHEET CONTENTS :

PRC NO. : 70071 TIN : 188-342-853


BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED) CHECKED BY:
4
FOUNDATION
PTR NO. : DATE : LOCATION : DATE : 08/06/2004 2ND FLOOR PLAN

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


1 2 3 4 5 6 7 8
4500 4500 4500 4500 4500 4500 4500

RG-1 RG-1 RG-1 RG-1 RG-1 RG-1 RG-1


A

RG-2

RG-2

RG-2

RG-2

RG-2

RG-2

RG-2

RG-2
T-1

T-1

T-1

T-1

T-1

T-1

T-1

T-1
7000
B
RG-1 RG-1 RG-1 RG-1 RG-1 RG-1 RG-1

2500

RG-1

RG-1
RG-1

RG-1

RG-1

RG-1

RG-1

RG-1
RG-1 RG-1 RG-1 RG-1 RG-1 RG-1 RG-1
C

LC-120x40x20x2.0 PURLINS
12mm CROSS
SPACED @ 750 mm O.C
BRACINGS
WITH %10 SAGRODS @ MIDSPAN

A ROOF DECK FRAMING PLAN


S-2 SCALE : 1:100 M.

L1 L2

L1/3 TOP BAR


L1/3 L2/3 TOP BAR

L1/6 BOTTOM BAR L1/5 L2/5 BOTTOM BAR

B TYPICAL SLAB ELEVATION


S-2

S C H E D U L E OF S L A B S
REBAR SPACING ALONG SHORT DIRECTION REBAR SPACING ALONG LONG DIRECTION
in mm in mm
THICK-
FLOOR SLAB
NESS LEFT SUPPORT MIDSPAN RIGHT SUPPORT LEFT SUPPORT MIDSPAN RIGHT SUPPORT REMARKS
LEVEL MARK REBAR REBAR
in mm SIZE SIZE
TOP BOTT. TOP BOTT. TOP BOTT. TOP BOTT. TOP BOTT. TOP BOTT.
LEVEL
SECOND

S-1 100 10 200 300 - 300 200 300 10 250 300 - 300 250 300 TWO-WAY

S-2 100 10 300 300 - 300 300 300 10 300 300 - 300 300 300 TWO-WAY

CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL : APPROVED FOR ACCREDITATION : CONCURRED : PROJECT TITLE : PROJECT NO: OWNER : SHEET NO:

REPUBLIC OF THE PHILIPPINES DESIGNED BY:


IC
o
f t he PH
IL
I
F
E A

TWO STOREY DEPARTMENT OF EDUCATION


DEPARTMENT OF EDUCATION (DepED)
T
M
L

P
B

TA
PU

I TO R I NG
IN

SK
RE

ES

ANTONIA M. MANIO WILFREDO S. LOPEZ SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI SIX CLASSROOM DepED
F O RC E

S-2
ON

ENCODED BY: Max C.


D

TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING


M
PE

NO

EN

MCMXCIX
&

IN
G
I

T
A

E N

G.I. ROOF SCHOOL BUILDING


E
R

ER
T

IN SM
A

A S SE S
T C
M
E U G ,
DE
TN

OIC, STRUCTURAL DIVISION OIC, DIRECTOR III OIC, DIRECTOR IV


F O

CIVIL ENGINEER UNDERSECRETARY


MERALCO AVENUE, PASIG CITY SHEET CONTENTS :

PRC NO. : 70071 TIN : 188-342-853


BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED) CHECKED BY:
3
ROOF DECK FRAMING PLAN
PTR NO. : DATE : LOCATION : DATE : 08/06/2004 SCHEDULE OF SLAB

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


C O L U M N S C H E D U L E AS SHOWN
%10 SPACED

8
MAIN BARS
%10 @250 10 @250
CUT BARS
7
LEVEL C-1 C-2 C-3 1-10
NOSING BAR
NGL

100
350 350 350

125
5
TIE BEAM

12
10 300mm TEMP
(SEE SCHEDULE)
BARS BOTHWAYS

100
400
350

350

350
4-10 CONT. BARS

125
10 @250
10mm
CUT BARS
FLOOR LEVEL TO

DECKLEVEL

DETAIL OF TIE BEAM DETAIL OF STAIR ON GRADE DETAIL OF RAMP


MAIN BAR: MAIN BAR: MAIN BAR:

6-%16mm 8-%20mm 8-%20mm


A B C
SCALE NTS SCALE 1 : 25M SCALE 1 : 50M
TIES : 10 mm TIES : 10 mm TIES : 10 mm S-3 S-3 S-3
1@50, 8@75, REST @ 1@50, 8@75, REST @ 1@50, 8@75, REST @
ROOF

150mm TO CENTER 150mm TO CENTER 150mm TO CENTER


2ND

L1 L2 L3

350 350 350


L2/3 L2/3 L3/3 L3/3

2D 2D LAP SPLICES ARE ALLOWED 2D 2D LAP SPLICES ARE ALLOWED 2D


ONLY IN THIS PORTION ONLY IN THIS PORTION

D
350

350

350
L2/5 L2/5 L2/5 L3/6
LEVEL TO

2-12mm SIDE BARS


2ND FLOOR LEVEL

MAIN BAR:

8-%16mm
MAIN BAR:

14-%20mm
MAIN BAR:

12-%20mm
D TYPICAL BEAM ELEVATION
FOUNDATION

TIES : 10 mm TIES : 10 mm TIES : 10 mm


S-3
1@50, 8@75, REST @ 1@50, 8@75, REST @ 1@50, 8@75, REST @
150mm TO CENTER 150mm TO CENTER 150mm TO CENTER

B E A M S C H E D U L E

BEAM S T E E L R E I N F O R C E M E N T S
DIMENSIONS S T I R R U P S
FLOOR BEAM
LEVEL MARK ( in / mm ) REBAR
LEFT MID SPAN RIGHT
10mm
L
(mm ) (UNLESS NOTED OTHERWISE)
b h TOP BOTTOM TOP BOTTOM TOP BOTTOM

NGL
G-1 200 400 20mm 2 2 2 2 2 2 1@50, 6@100, REST@200

G-2 200 400 20mm 4 3 2 2 4 3 1@50, 6@100, REST@200

G-3 200 400 20mm 3 2 2 2 3 2 1@50, 6@100, REST@200


D

Y-BARS
X-BARS G-3a 200 800 20mm 3 2 2 2 3 2 1@50, 8@175, REST@300
W

G-4 200 400 20mm 3 2 2 2 3 3 1@50, 6@100, REST@200

2ND FLOOR LEVEL


t

Y-BARS G-5 250 500 20mm 5 3 2 4 5 3 1@50, 8@100, REST@200


100

X-BARS
G-6 200 400 20mm 3 2 2 2 3 3 1@50, 6@100, REST@200
100 mm THICK
L G-7 250 500 20mm 5 3 2 6 5 3 1@50, 8@100, REST@200
GRAVEL BEDDING

PLAN SECTION B-1 200 400 16mm 4 2 2 2 4 2 1@50, 6@100, REST@200

B-2 200 400 16mm 2 2 2 4 2 2 1@50, 6@100, REST@200

E TYP. FOOTING DETAIL CB-1 200 400 16mm 4 2 4 2 4 2 1@50, 6@100, REST@200

SCALE NTS
S-3
RG-1 200 400 16mm 2 2 2 2 2 2 1@50, 6@100, REST@200

ROOF
LEVEL
RG-2 200 500 16mm 3 3 2
3 3 3 3 1@50, 8@100, REST@200

S C H E D U L E O F F O O T I N G
TG-1 300 500 20mm 3 2 2 2 4 3 1@50, 8@100, REST@200

BEAM
FOOTING DIMENSIONS (mm)

TIE
REINFORCEMENT REMARKS
FOOTING TG-2 300 500 20mm 4 3 2 2 4 3 1@50, 8@100, REST@200

MARK LENGTH WIDTH DEPTH Thickness


BAR X BAR Y TG-3 300 500 20mm 3 3 2 2 3 3 1@50, 6@100, REST@200
(L) (W) (D) (t)

F-1 1100 1100 1500 250 5 - 16mm% 5 - 16mm% SQUARE FOOTING


STB-1 200 400 16mm 3 2 2 4 3 2 1@50, 6@100, REST@200
BEAM
STAIR

SQUARE FOOTING STB-2 200 500 16mm 4 2 2 4 4 2 1@50, 8@100, REST@200


F-2 2200 2200 1500 300 12 - 16mm% 12- 16mm%

F-3 1900 1900 1500 300 11 - 16mm% 11 - 16mm% SQUARE FOOTING

CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL : APPROVED FOR ACCREDITATION : CONCURRED : PROJECT TITLE : PROJECT NO: OWNER : SHEET NO:

REPUBLIC OF THE PHILIPPINES DESIGNED BY:


IC
o
f t he PH
IL
I
F
E A

TWO STOREY DEPARTMENT OF EDUCATION


DEPARTMENT OF EDUCATION (DepED)
T
M
L

P
B

TA
PU

I TO R I NG
IN

SK
RE

ES

ANTONIA M. MANIO WILFREDO S. LOPEZ SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI SIX CLASSROOM DepED
F O RC E

S-3
ON

ENCODED BY: Max C.


D

TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING


M
PE

NO

EN

MCMXCIX
&

IN
G
I

T
A

E N

G.I. ROOF SCHOOL BUILDING


E
R

ER
T

IN SM
A

A S SE S
T C
M
E U G ,
DE
TN

OIC, STRUCTURAL DIVISION OIC, DIRECTOR III OIC, DIRECTOR IV


F O

CIVIL ENGINEER UNDERSECRETARY


MERALCO AVENUE, PASIG CITY SHEET CONTENTS :

PRC NO. : 70071 TIN : 188-342-853


BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED) CHECKED BY:
4
DET. STAIR ON GRADE, RAMP & BEAM
PTR NO. : DATE : LOCATION : DATE : 08/06/2004 DET. OF FOOTING, TIE BEAM & COLUMN
NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


S-4
L

5 S-3
6
C
250 4500
S-4

29 30 25 38 38 25 30 29 2200 2200

6mm GUSSET PLATE

BOTTOM CHORD A
2500

W-2
1
W
- 4-12x300mm LONG A

W
1

2
-

W-2

W-2
W

-
-
BENT ANCHOR BOLTS

W
2
2

2
F

W-2
-
S-2

W-2
-

2150
W

W
S-4

50
2

W-2
- 250x200x10mm BASE

W-2
W

2834
PLATE

1187
W-1
W-2

W-2

200

100
STB-2
E
W-2 S-4
2L-2x2x1/4 STRUT W-2 DC-1
DC-1

1000 2-SPAN @1250 2-SPAN @1125 4-SPAN @1187.5 1000 P


2500 2250 4750

50
9500 S-3
SEE SCHEDULE OF

= 4500mm
2ND FLOOR LEVEL
DN S-2 (2ND/3RD LVL)
CB-1 FOR DETAIL OF REIN.
CB-1

PLAN

7000
A DETAIL OF T-1 G-3a
STB-2 M
G-2

15 TREADS @ 300mm EACH


SCALE 1 : 25 M S-3
S-3 2150
N

4500

3200
S-3

2856
6mm GUSSET PLATE
292
250

SCHEDULE OF TRUSS MEMBERS

0
BOTTOM CHORD (FULLY

20
29 30 25 38 38 25 30 29
WELDED TO BASE PLATED)

B-2
TO 6mm GUSSET PLATE (TYP.)

168
P
RD CH
O O
CH RD
MARK DESCRIPTION
P QTY SIZE 4-12x300mm LONG
TO
BENT ANCHOR BOLTS

W-1 TOP & BOT. CHORDS 2L 2"x2"x1/4" GROUND FLOOR LEVEL


250x200x10mm BASE
PLATE
W-2 WEB MEMBERS 2L 2"x2"x3/16"

FULL WELD
COLUMN OR BEAM
B S-3
TG-3

O
KING POST

D CONNECTION DETAIL K STAIR FRAMING PLAN (TYP.) L STAIR SECTION DETAIL


1 : 5 M
S-3
SCALE
O
RD S-3 SCALE 1:50 M
S-3 SCALE 1:50 M

CH
TO
P 6mm GUSSET PLATE (TYP.)

16 @200 10 @300
FULL WELD
TEMP BARS

12@ 125 TOP 12@ 125


MAIN BARS STEP BARS 2-10

SECTION STEP BAR

200mm 200

200
12 @120

TYPICAL TRUSS

200
H ANCHORAGE DETAIL 16 @ 200
MAIN BAR MAIN BAR:
FULL WELD SCALE 1:5 M 4-16mm
S-3

0
0
F CONNECTION DETAIL M SECTION OF STAIR SLAB

2
6mm GUSSET PLATE (TYP.) %12 @300
TIES : 10 mm

SCALE 1 : 5 M 1@50, 8@75, REST @


S-3 S-3 SCALE 1:25 M
150mm TO CENTER

N SPOT DETAIL DC-1


BOTTOM CHORD SCALE 1 : 25 M
SEE TRUSS ANCHORAGE DETAIL
S-3 (FROM LANDING TO
2ND/3RD FLOOR LEVEL)
CONNECTION DETAIL
W 10 @300
-
E 1

SCALE 1 : 5 M 120x40x20x2.0mm
S-3 STEEL C-PURLINS
2-10
750mm O.C.
STEP BAR
10mm% SAG ROD WITH 200mm
STANDARD NUTS & 10 @300
75

W-2
WASHERS @ EACH END
±7
50
LC-120x40x20x2.0 6-%10x200mm LONG
2-10
PURLINS
STEP BAR
75

1-%10mm A-307
ANCHOR BOLT
L-2.5x2.5x1/4

100
100
100 100
100
CB-1
W-2
10mm @
TG-3
300mm o.c.

3-10mm STB-2

HALF TRUSS O SPOT DETAIL P SPOT DETAIL


G PURLIN CONNECTION DETAIL I SAG ROD CONNECTION DETAIL J CONNECTION DETAIL S-3
SCALE 1 : 25 M
S-3
SCALE 1 : 25 M

SCALE 1 : 5 M SCALE 1 : 10 M SCALE 1 : 10 M


S-3 S-3 S-3

CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL : APPROVED FOR ACCREDITATION : CONCURRED : PROJECT TITLE : PROJECT NO: OWNER : SHEET NO:

REPUBLIC OF THE PHILIPPINES DESIGNED BY:


IC
o
f t he PH
IL
I
F
E A

TWO STOREY DEPARTMENT OF EDUCATION


DEPARTMENT OF EDUCATION (DepED)
T
M
L

P
B

TA
PU

I TO R I NG
IN

SK
RE

ES

ANTONIA M. MANIO WILFREDO S. LOPEZ SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI SIX CLASSROOM DepED S-4
F O RC E

ON

ENCODED BY: Max C.


D

TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING


M
PE

NO

EN

MCMXCIX
&

IN
G
I

T
A

E N

G.I. ROOF SCHOOL BUILDING


E
R

ER
T

IN SM
A

A S SE S
T C
M
E U G ,
DE
TN

OIC, STRUCTURAL DIVISION OIC, DIRECTOR III OIC, DIRECTOR IV


F O

CIVIL ENGINEER UNDERSECRETARY


MERALCO AVENUE, PASIG CITY
4
SHEET CONTENTS :
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED) CHECKED BY:
PRC NO. : 70071 TIN : 188-342-853
TRUSS DIAGRAM, DETAIL OF STAIR
PTR NO. : DATE : LOCATION : DATE : 08/06/2004 DETAILS OF STEEL CONNECTION

NOTE:
THE REVIEW & APPROVAL OF THIS PLANS BY THE DPWH DOES NOT RELIEVE THE DESIGNER/CONSULTANT THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
FROM RESPONSIBILTY FOR THE SAFETY OF THE COMPLETED FACILITIES AS WELL AS FOR THE FAILURE
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
OF THE SAME DUE TO FAULTY DESIGN. ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


LEGEND LOAD SCHEDULE
GENERAL NOTES
SYMBOL DESCRIPTION
1. ALL ELECTRICAL WORKS SHALL COMPLY IN ACCORDANCE WITH

THESE PLANS AND SPECIFICATIONS. THE APPLICABLE PROVISIONS - CEILING LIGHT OUTLET
PANELBOARD: LP MAIN : 100AT, 100AF, 2P, 230V
OF THE LATEST EDITION OF THE PHILIPPINE ELECTRICAL CODE (PEC). 2
- 2 x 40 WATTS FLUORESCENT LAMP

THE RULES AND REGULATION OF THE LOCAL ENFORCING AUTHORITY CIRCUIT BREAKER
F - CEILING FAN OUTLET CKT. VA
DESCRIPTION WIRE & CONDUIT SIZE
AND THE REQUIREMENTS OF THE LOCAL POWER COMPANY. NO. LOAD
S/Sa - ONE GANG DEVICE SWITCH VOLT POLE AT AF

THE ELECTRICAL WORKS SHALL BE UNDER IMMEDIATE SUPERVISION


2
CONV. OUTLET - 9 x 180W 1620 230 2 50
S ab - TWO GANG DEVICE SWITCH 1 20 3-3.5mm THW IN 15mm C
OF A DULY REGISTERED ELECTRICAL ENGINEER.
2
S cde - THREE GANG DEVICE SWITCH 2 CONV. OUTLET - 9 x 180W 1620 230 2 20 50 3-3.5mm THW IN 15mm C
2. THE ELECTRICAL SERVICE POWER IS 1-PHASE, 2-WIRE,
LIGHT OUTLET - 7 x 100W 2
230 V AC, 60 Hz. S 3W - THREE WAY DEVICE SWITCH 3
EXHAUST FAN OUTLET - 1 x 180W
880 230 2 20 50 3-3.5mm THW IN 15mm C

2
3. WIRING METHOD SHALL BE AS FOLLOWS : Sf - FAN CONTROL SWITCH 4 LIGHT OUTLET - 15 x 100W 1500 230 2 20 50 3-3.5mm THW IN 15mm C

2
a. FEEDERS AND RISERS - INTERMEDIATE METALLIC CONDUIT - EXHAUST FAN SWITCH 5 LIGHT OUTLET - 10 x 100W 1000 230 2 20 50 3-3.5mm THW IN 15mm C
S EF
2
b. LIGHTING, POWER RECEPTACLE - POLYVINYL CHLORIDE CONDUIT - RACEWAY CONDUIT CONCEALED IN CEILING 6 LIGHT OUTLET - 10 x 100W 1000 230 2 20 3-3.5mm THW IN 15mm C
50
BRANCH CKT., & AUXILIARY SCH. 40
- RACEWAY CONDUIT CONCEALED UNDER FLOOR 7 S P A R E 1500 230 2 20 50

4. ALL WIRES SHALL BE COPPER AND THERMOPLASTIC INSULATED TYPE


8 S P A R E 1500 230 2 20 50
"THW" UNLESS OTHERWISE INDICATED IN THE PLAN. THE MINIMUM
- PANELBOARD
TOTAL 10620
SIZE OF WIRE FOR POWER AND LIGHTING CIRCUIT HOMERUN SHALL BE
2
- CKT. BREAKER, RATING AS INDICATED
3.5mm AND INSULATED FOR 600 VOLTS. SMALLEST RACEWAY SHALL
- DUPLEX CONVENIENCE OUTLET, GROUNDING TYPE
BE 15mmO
I TRADE/NOMINAL SIZE.
10 AMPS, 250 VOLT WITH MODERN PLATE COVER IL @ 80D.F. = 10620 x 80 x 1.25 = 46.2 A
5. ALL OUTLET BOXES SHALL BE GALVANIZED GAUGE NO. 16 DEEP
- EXHAUST FAN OUTLET, SINGLE, GROUNDING TYPE 230 V
TYPE WITH FACTORY KNOCKOUTS. EF
10 AMPS, 250 VOLT WITH MODERN PLATE COVER
6. ALL MATERIALS TO BE USED SHALL BE BRAND NEW AND APPROVED LP 2

- HOMERUN DIRECT TO PANELBOARD FEEDER: 2-30mm THW IN 32mm C


TYPE FOR THE PARTICULAR LOCATION AND PURPOSE OF USAGE.
PROTECTION: 100 AT, 100 AF, 2P, 230 V
- PUSH BUTTON
7. GROUNDING SYSTEM SHALL BE PROVIDED TO ALL LIGHTING AND
POWER CIRCUIT AS PER PHILIPPINE ELECTRICAL CODE REQUIREMENT. - ENCLOSED AIR CIRCUIT BREAKER

FA - FIRE ALARM CONTROL PANEL


8. MOUNTING HEIGHT OF WIRING DEVICES SHALL BE AS FOLLOWS :
F - FIRE ALARM STATION OUTLET
a. LIGHT SWITCH - 1.20 M ABOVE FINISH FLOOR
- VIBRATING BELL OUTLET
B

b. CONVENIENCE OUTLET - 0.30 M ABOVE FINISH FLOOR.


B - FIRE ALARM BELL

c. PANELBOARD - 1.50 M ABOVE FINISH FLOOR M - SERVICE METER


OVERHEAD SERVICE ENTRANCE
CONNECTED TO 220V AC, 1O,
- SERVICE ENTRANCE 2 WIRE, 60 Hz FITTED WITH
32mm O TYPE "F" CONDULET
d. FIRE ALARM STATION OUTLET - 1.50 M. ABOVE FINISH FLOOR

BUILDING WALL
e. PUSH BUTTON OUTLET - 1.20 M ABOVE FINISH FLOOR
TO SIMILAR OUTLET

@ SECOND FLOOR
2ND FLOOR LINE

f. FIRE ALARM & VIBRATING BELL - 0.30 M BELOW CEILING LINE

PANEL LP
2
2-30mm THW B B
IN 32MMORSC

TO LINE SIDE OF LP

100AT, 100AF, 2P, 230V AC F


METERING CONDUIT
2
3-3.5mm THW
20 20
KWHR METER IN 15MMORSC

FA
20 20 2
2-3.5mm THW
IN 15MMORSC

20
20 TO NEAREST C.O.
ENCLOSED ACB
RATING: 20AT, 50AF,
230V, 2P

1500 mm
2
2-3.5mm THW

1800 mm
20 20
IN 15MMORSC

GROUND TERMINAL
ELECTRICAL FIRE ALARM VIBRATING BELL
GROUND FLOOR LINE

2
#8mm BARE COPPER WIRE
FIN. GRADE LINE

2
1-8.0mm BARE COPPER WIRE
16mm O x 2.40m
IN 15mmO C
I

COPPERWELD
GROUND ROD 16MMO x 240MM LENGTH
GROUNDING ROD COPPERWELD

SINGLE LINE DIAGRAM RISER DIAGRAM


NOT TO SCALE
NOT TO SCALE

CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL : APPROVED FOR ACCREDITATION : CONCURRED : PROJECT TITLE : PROJECT NO: 99-013 OWNER : SHEET NO:

REPUBLIC OF THE PHILIPPINES DESIGNED BY: RDS


IC
o
f t he PH
IL
I
F
E A

TWO STOREY DEPARTMENT OF EDUCATION


DEPARTMENT OF EDUCATION (DepED)
T
M
L

P
B

TA

E-1
PU

I TO R I NG
IN

SK
RE

ES

VENERANDO D. SAHAGUN FE M. BARRIENTOS SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI SIX CLASSROOM DepED
F O RC E

ON

ENCODED BY: Max


RDS C.
D

TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING


M
PE

NO

EN

MCMXCIX
&

IN
G
I

T
A

E N

G.I. ROOF SCHOOL BUILDING


E
R

ER
T

IN SM
A

A S SE S
T C
M
E U G ,
DE
TN

OIC, DIRECTOR III OIC, DIRECTOR IV


F O

ENGINEER III CHIEF, ELECTRICAL DIVISION UNDERSECRETARY


MERALCO AVENUE, PASIG CITY SHEET CONTENTS :
BUREAU OF DESIGN, DPWH CHECKED BY: LOAD SCHEDULE
3
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED)
PRC NO. : TIN :
GENERAL NOTES LEGEND
PTR NO. : DATE : LOCATION : : 08/06/2004
DATE :5-5-00 SINGLE LINE DIAGRAM RISER DIAGRAM

NOTE:
THE REVIEW & APPROVAL OF THIS PLANS BY THE DPWH DOES NOT RELIEVE THE DESIGNER/CONSULTANT THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
FROM RESPONSIBILTY FOR THE SAFETY OF THE COMPLETED FACILITIES AS WELL AS FOR THE FAILURE
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
OF THE SAME DUE TO FAULTY DESIGN. ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


1 2 3 4 5 6 7 8

CLASSROOM CLASSROOM CLASSROOM

B
LP

B B
F

SECOND FLOOR POWER LAYOUT


SCALE 1 : 100 M

1 2 3 4 5 6 7 8

CLASSROOM CLASSROOM CLASSROOM

B
UP

TO C.O.
LP

B B LP
TO FA
F

C
FA

ENCLOSED AIR CIRCUIT BREAKER


RATING: 220 V, 2P, 20AT, 50AF
TO LINE SIDE OF LP

OVERHEAD SERVICE ENTRANCE


REFER TO RISER DIAGRAM

GROUND FLOOR POWER LAYOUT


SCALE 1 : 100 M

CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL : APPROVED FOR ACCREDITATION : CONCURRED : PROJECT TITLE : PROJECT
PROJECTNO:
NO:99-017 OWNER : SHEET NO:

REPUBLIC OF THE PHILIPPINES DESIGNED


DESIGNEDBY:
BY:RDS
IC
o
f t he PH
IL
I
F
E A

TWO STOREY DEPARTMENT OF EDUCATION


DEPARTMENT OF EDUCATION (DepED)
T
M
L

P
B

TA
PU

I TO R I NG

E-2
IN

SK
RE

ES

VENERANDO D. SAHAGUN FE M. BARRIENTOS SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI SIX CLASSROOM DepED
F O RC E

ON

ENCODED
ENCODEDBY: Max C.
BY:RDS
D

TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING


M
PE

NO

EN

MCMXCIX
&

IN
G
I

T
A

E N

G.I. ROOF SCHOOL BUILDING


E
R

ER
T

IN SM
A

A S SE S
T C
M
E U G ,
DE
TN

OIC, DIRECTOR III OIC, DIRECTOR IV


F O

ENGINEER III CHIEF, ELECTRICAL DIVISION UNDERSECRETARY


MERALCO AVENUE, PASIG CITY SHEET CONTENTS :
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED) CHECKED
CHECKEDBY:
BY:

3
BUREAU OF DESIGN, DPWH
PRC NO. : TIN :
GROUND FLOOR POWER LAYOUT
PTR NO. : DATE : LOCATION : DATE : 08/06/2004
DATE:5-5-00
SECOND FLOOR POWER LAYOUT

NOTE:
THE REVIEW & APPROVAL OF THIS PLANS BY THE DPWH DOES NOT RELIEVE THE DESIGNER/CONSULTANT THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
FROM RESPONSIBILTY FOR THE SAFETY OF THE COMPLETED FACILITIES AS WELL AS FOR THE FAILURE
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
OF THE SAME DUE TO FAULTY DESIGN. ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


1 2 3 4 5 6 7 8

A
a b c d e f 2

2 2 2 2 2 2

S
F F F

a b c d e f

2 2 2 2 2 2

LP

Sab Sf Scd Sf 6
Sef Sf
B
Sgh Sij
g h i j
2 2 2 2

LP

SECOND FLOOR LIGHTING LAYOUT


SCALE 1 : 100 M

1 2 3 4 5 6 7 8

A S EF
EF

a b c d e f S

2 2 2 2 2 2

k
Skl
F F F

a b c d e f

2 2 2 2 2 2

LP

Sab Sf Scd Sf Sef Sf 4

B
UP
Sgh Sij
g h i j
2 2 2
2

LP

C
3

RAMP
UP

GROUND FLOOR LIGHTING LAYOUT


SCALE 1 : 100 M

PROJECT NO: 99-017


CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL : APPROVED FOR ACCREDITATION : CONCURRED : PROJECT TITLE : PROJECT NO: OWNER : SHEET NO:

REPUBLIC OF THE PHILIPPINES DESIGNED BY: RDS


DESIGNED BY:
o
f t he PH
IL
F
E A

TWO STOREY DEPARTMENT OF EDUCATION


E-3
IC I

DEPARTMENT OF EDUCATION (DepED)


T
M
L

P
B

TA
PU

I TO R I NG
IN

SK
RE

ES

VENERANDO D. SAHAGUN FE M. BARRIENTOS SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI SIX CLASSROOM DepED
F O RC E

ENCODED BY: RDS


ON

ENCODED BY: Max C.


D

TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING


M
PE

NO

EN

MCMXCIX
&

IN
G
I

T
A

E N

G.I. ROOF SCHOOL BUILDING


E
R

ER
T

IN SM
A

A S SE S
T C
M
E U G ,
DE
TN

OIC, DIRECTOR III OIC, DIRECTOR IV


F O

ENGINEER III CHIEF, ELECTRICAL DIVISION UNDERSECRETARY


MERALCO AVENUE, PASIG CITY
3
CHECKED BY: SHEET CONTENTS :
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED) CHECKED BY:
PRC NO. : TIN : GROUND FLOOR LIGHTING LAYOUT
DATE :5-5-00
PTR NO. : DATE : LOCATION : DATE : 08/06/2004 SECOND FLOOR LIGHTING LAYOUT

NOTE:
THE REVIEW & APPROVAL OF THIS PLANS BY THE DPWH DOES NOT RELIEVE THE DESIGNER/CONSULTANT THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
FROM RESPONSIBILTY FOR THE SAFETY OF THE COMPLETED FACILITIES AS WELL AS FOR THE FAILURE
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
OF THE SAME DUE TO FAULTY DESIGN. ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


1 2 3 4 5 6 7 8
9000 9000 9000

600 4500 4500 4500 4500 4500 4500 4500 600

RD RD RD RD RD RD RD RD

1000
A

7000

B
2500

C
1000

LN. OF STRUCTURE
TR
CV
PV
m

RD RD RD RD RD RD RD RD
m
50

R
E
00

W
10

E T O

E
T S T

S
R P
ROOF DRAIN LAYOUT

A S
2

S E

M
00

V
P
25 50

E
50mm PVCVTR

WTVCVP
39

Y
S
L
W

75mmPVCDS
S

P
K
AN VT

R
IC
V

G
V

C
P
m

T
5
P-1
m m

P
I m 12

mm05
C
m
SCALE : 1 : 100 METERS
W
00 m VT

T
1 50 SE
SE

R
S

P
V

C
V

C
I

P
R

P
L

P
S m m W
m
m

C
50 0m

IC
TW
V 0m

C
W

P
W

G
CV
10 10 m VT

3 2 1 4 5 4 5 6

O
00 PV E m

C
2500 1000
V
SH

C
20 12

P
00 m
m 4 m
23 50
75mm S m
50 SE

-
F

R
C
B

D
PVCWP
m

C
m S

I
4

R
C
W
75 V 3 3

O
C

C
D

D
3950
V

R
E LA

C
4 H F

D
H

-
D
2

-
L

D
W
VT
L

IC
SE

R
W

IC
D

G
V

C
P

G
m

I
R
C

P
m
m m
m
20
0m

O
m
m F

D
C
12
50

P
W
15

75mmPVCDS
V

C
2300

2000

P
m
0m

75mmPVCDS
5
SEPTIC TANK 10

P
U
LY

P
PVCSP TO

P
U
L S
W

IC

R
IN
E

G
A
AT
NEAREST SEWER
M
W m

O
T m
38
V

G
B
m

C
SYSTEM m
75 V
S
OM
M

D
RO
V

G
SS

P
m
150mmCPD 150mmCPD 150mmCPD CL
A m
75 V
S

D
CB CB CB

C
CB

P
D
P
C
m

P P
0m F

M
A
15

B
U

75mmPVCDS

C
7

100mm
5

75mmPVCDS
PVCSP

1
P

m
V

m
C
75mm 75mm

P
W

D
C
P
75mm PVCDS 75mm 100mm PVCSP 0m
m
EM
15
PVCDS PVCDS ST

D
P
SY
PVCDS

R
A
75mPVCDS

75mPVCDS

C
m E
50mm PVCVTR 0m

G
T
75mPVCDS
A
75mPVCDS

IN
B
m
15

V
C
A
m S M

R
5
m
0
V
C
V
P
T
W
m
RISER 75 V

D
C
OO

P
D

IN
WC

C
SR

V
A

50mPVCTR

2
M

P
m
S

O
m 0m
A
T
12mm GICWL m S 15
SHE CL

P
75 V

12mm GICWL

D
HE

C
P
m
m
D-4 50mm PVCVTR

D
D-4

P
C
100mm PVCWP D-3 m
RISER 0m F

D
0
5
15

B
C
FD

75mmPVCDS
D-3

75mmPVCDS
3
CS CO
ROOF LINE

50mm PVCVTW
CO

D
P
100mm PVCSP S

C
m
WC

D
V 0m

C
15

P
D-2 m M
HCR 12mm GICWL m
RO
O
75
SS

50mPVCTW
m
FD A m S

B
CL

C
75 V

D
150mm CDP

CLASSROOM CLASSROOM CLASSROOM

C
LAV 50mm PVCVTW

P
RISER
CO

B
20mm GICWL

C
E
N
LI

75mmPVCDS
F
O
O

R
15
0m

D
P
m

C
m
0m
15

C
D
P
S

D
V

C
P
m
m
75

B
B

B
UP

C
EM
ST
SY
E

G
A

IN
A

R
D
P
D

IN
C
A
M m

O
0m T
15

C FD FD FD
75mPVCDS

75mPVCDS

75mPVCDS
75mm 75mm 75mm
75mPVCDS

75mm PVCDS
PVCDS PVCDS PVCDS
RAMP

WATER SUPPLY
150mm CDP

GICWL
UP

TO MAIN
150mmCPD 150mmCPD 150mmCPD

38mm
CB CB CB CB

GV
1 PUMBING RO-IN LAYOUT 3 I S O M E T R I C V I E W

M
GV
P-1 P-1
TO MAIN DRAINAGE SYSTEM

TO MAIN DRAINAGE SYSTEM

SCALE : 1:100m SCALE : N T S


150mm CDP

150mm CDP

CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL : APPROVED FOR ACCREDITATION : CONCURRED : PROJECT TITLE : PROJECT NO: OWNER : SHEET NO:

REPUBLIC OF THE PHILIPPINES DESIGNED BY:


IC
o
f t he PH
IL
I
F
E A

TWO STOREY DEPARTMENT OF EDUCATION


DEPARTMENT OF EDUCATION (DepED)
T
M
L

P
B

TA
PU

I TO R I NG
IN

SK
RE

ES

DepED P-1
EMMANUEL P. CUNTAPAY SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI SIX CLASSROOM
F O RC E

ELIAS MELQUIADES EMEL B. CUBA II


ON

ENCODED BY: Max C.


D

TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING


M
PE

NO

EN

MCMXCIX
&

IN
G
I

T
A

E N

G.I. ROOF SCHOOL BUILDING


E
R

ER
T

IN SM
A

A S SE S
T C
M
E U G ,
DE
TN

OIC, DIRECTOR III OIC, DIRECTOR IV


F O

SANITARY ENGINEER CHIEF, ARCHITECTURAL DIVISION UNDERSECRETARY


MERALCO AVENUE, PASIG CITY
2
SHEET CONTENTS :
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED) CHECKED BY:
PRC NO. : TIN : PLUMBING RO-IN LAYOUT, ROOF DRAIN LAOUT,
ISOMETRIC VIEW
PTR NO. : DATE : LOCATION : DATE : 08/06/2004

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


LEGEND:

CB CATCH BASIN

CDP CONCRETE DRAIN PIPE

CO CLEAN OUT

CV CHECK VALVE

HB HOSE BIBB

FD FLOOR DRAIN

GICWL GALVANIZED IRON COLD WATER LINE (SCH. 40)

4650 GICWR GALVANIZED IRON COLD WATER RISER (SCH. 40)


100mm THK. + FIN. SLAB W/ 150X300mm RC BEAM W/2-16mm
10mm REBARS AT 200mm O.C. GV GATE VALVE
TOP AND BOT. REBARS & 10mm STIRRUPS
BENT UP 2 OUT OF 3 AT L/4 1@50,3@100, REST @300mm O.C.
FROM FACE SUPPORT. BOTH WAYS 100mm THK. + FIN. SLAB W/
10mm BENT UP 2 OUT OF 3 AT MH MANHOLE
L/4 FROM FACE SUPPORT BW
600
PVCDS POLYVINYL CHLORIDE DOWNSPOUT
AIR SPACE
NGL

100
100

NGL
MH PVCDP POLYVINYL CHLORIDE DRAIN PIPE
VAR

MANHOLE AIR SPACE


MANHOLE
AIR SPACE
INLET
PVCDS POLYVINYL CHLORIDE DOWNSPOUT
100

INLET

100
PVCSP POLYVINYL CHLORIDE SOIL PIPE
350

300
WATER LEVEL 700

25
WATER
LEVEL PLASTERED W/WATERPROOFING
COMPOUND OR APPLY ONE FACE PVCVAC POLYVINYL CHLORIDE VENT. ACROSS CEILING
150 700 150
PLASTERED W/ WATERPROOFING BITUMEN TAR 150 400 150
WALLS REINFORCEMENT COMPOUND OR APPLY ONE
LEACHING 10mm VERT. & HOR. BAR FACE BITUMEN TAR
PVCVP POLYVINYL CHLORIDE VENT. PIPE
2125

CHAMBER @200mm OC BW

DIGESTIVE CHAMBER
DIGESTIVE (W. LEVEL)

PVCVS POLYVINYL CHLORIDE VENT STACK


GRAVEL BED
10mm REINF. VERT & HOR.

150
DRAINAGE PIPE
@200mm O.C BWAYS
100mm THK. SLAB W/
1600

10mm REBARS @ PVCVTR/W POLYVINYL CHLORIDE VENT TROUGH ROOF/WALL


300mm BOTH WAYS 2SLOPE
125

PVCWP POLYVINYL CHLORIDE WASTE PIPE

700

400
INLET OUTLET
150 2500 150
PVCWS POLYVINYL CHLORIDE WASTE STACK
150 1000 150 3200 150
2800

RD ROOF DRAIN

150
100mm THK. + FIM. SLAB W/
10mm REBARS @300mm O.C. BW
2 SECTION DETAIL UD URINAL DRAIN

P-3 SCALE : 1:50 Mts.


3 5a
SECTION DETAIL DETAIL PLAN WC WATER CLOSET

P-3 SCALE : 1:50 Mts.


P-3 SCALE : 1:20 M LAV LAVATORY

2-10mm EXTRA
S-1a 100mm THK. + FIN. SLAB W/ CS COUNTER SINK
BARS TOP/BOT. ON 10mm REBARS @ 300mm O.C.

TWO PARALLEL SIDE BENT UP 2 OUT OF 3 AT L/4 150MM THK. CHB W/ 10mm
FROM FACE OF SUPPORT B.W. REBARS HOR. EVERY 2-LAYERS
700
VERT. @600mm O.C.
4650
1000 3200
150 150 150 150 400 150 PLUMBING NOTES:

200 600 200 1100 150 700 150 1100 75 75mm 1. GRADES OF HORIZONTAL PIPINGS
PVCDS
RUN ALL HORIZONTAL PIPINGS IN PERPECT ALIGNMENT AND AT A FORM GRADE NOT LESS THAN TWO PERCENT (2
150

100
2. CHANGE IN DIRECTION
CDP
ALL CHANGE IN DIRECTION SHALL BE MADE BY APPROPRIATE USE OF FORTY-FIVE DEGREES (45°) WYES, LONG SWEEP
900

OUTLET QUARTER BEND, SIXTH-EIIGHT OR SIXTEENTH BEND. WHEN THE CHANGE OF FLOW IS FROM HORIZONTAL TO VERTICAL A
50
2SLOPE SINGLE 1/8 BEND COMBINATION MAYBE USED ON VERTICAL STACKS AND SHORT QUARTER BENDS MAYBE USED ON WASTE
INLET
CDP LINE, TEE AND CROSSES MAYBE USED IN BENT PIPES.

(VARIABLE)
50 600 50

600 min.
2SLOPE
50
2800
2500

3. PROHIBITED FITTINGS
MH MH OUTLET
NO DOUBLE HUB OR TEE BRANCH SHALL BE USED ON HORIZONTAL SOIL AND WASTE LINES, THE DRILLINGS AND TAPPING

100
10mm BAR
OF HOUSE DRAIN, WASTE OR VENT PIPES AND USED OF SADDLE HUB AND BEND ARE PROHIBITED.
HANDLE 3-10mm (E.W.)
50 (TYP.)

100
P-3
1.
4. PIPE CLEAN-OUTS
2 600
900

CLEAN-OUTS ARE REQUIRED UNDER THE F0LLOWING CONDITIONS:


250 100 250
a) EVERY CHANGE OF HORIZONTAL DIRECTION EXCEEDING TWENTY TWOAND ONE-HALF DEGREES (22 1/2°).
5b DETAIL SECTION b) ONE AND ONE-HALF METERS (1.50m.) INSIDE THE PROPERTY LINES BEFORE THE HOUSE DRAINAGE CONNECTION.
150

c) EVERY FIFTEEN METERS (15.00m) IN HORIZONTAL RUN OF PIPES.


d) AT THE END OF ANY HORIZONTAL PIPE LINES.
S2 100mm THK. + FIN. SLAB W/
P-3 SCALE : 1:20 M
100

10mm REBARS @ 300mm O.C.

BENT UP 2/3 OUT AT L/4 FACE


SUPPORT AND SHORT SPAN AND 5. THE DIGESTION CHAMBER OF SEPTIC VAULT MUST BE WATERPROOFED.
INLET INLET
10mm TEMP BARS @300mm E.W. 50 50
6. NOT LESS THAN 0.30 METER OF AIR SPACE MUST BE LEFT BETWEEN THE TOP OF THE SEWAGE AND THE UNDER PART OF
50 50
3 5 CATCH BASIN DETAIL SECTION
VAULT ROOF SLAB.

P-3 7. NO SEPTIC VAULT SHALL BE CONSTRUCTED UNDER THE BUILDING.


P-3 SCALE : 1:20 MTS.

8. ALL PLUMBING WORKS SHALL BE UNDER THE SUPRVISION OF A LICENSED MASTER PLUMBER AND A LICENCED PLUMBING
1 SEPTIC TANK DETAIL 4 MANHOLE DET. SECTION CONTRACTOR.

P-3 SCALE : 1:50 Mts.


P-3 SCALE : 1:10 Mts.

DESIGN CRITERIA

i. LIVE LOAD_________________ 1000Pa


ii ALLOWABLE STRESSES
1. CONCRETE

a. FOR FOOTING, BEAMS AND SLABS


fc'' = 20 MPa
2. CONCRETE MASONRY UNITS (LOAD BEARING CHB)
fm' =6.90 MPa, fm = 2.41 MPa
3. REINFORCING STEEL BARS
FOR BARS SMALLER THAN 16mm

fy = 230 MPa
4. ASSUMED ALLOWABLE BEARING CAPACITY Y = 100KPa

NOTE:
WATER TABLE IS 1500 BELOW GROUND LEVEL.

CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL : APPROVED FOR ACCREDITATION : CONCURRED : PROJECT TITLE : PROJECT NO: OWNER : SHEET NO:

REPUBLIC OF THE PHILIPPINES DESIGNED BY:


IC
o
f t he PH
IL
I
F
E A

TWO STOREY DEPARTMENT OF EDUCATION


DEPARTMENT OF EDUCATION (DepED)
T
M
L

P
B

TA
PU

I TO R I NG
IN

SK
RE

ES

DepED P-2
EMMANUEL P. CUNTAPAY SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI SIX CLASSROOM
F O RC E

ELIAS MELQUIADES EMEL B. CUBA II


ON

ENCODED BY: Max C.


D

TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING


M
PE

NO

EN

MCMXCIX
&

IN
G
I

T
A

E N

G.I. ROOF SCHOOL BUILDING


E
R

ER
T

IN SM
A

A S SE S
T C
M
E U G ,
DE
TN

OIC, DIRECTOR III OIC, DIRECTOR IV


F O

SANITARY ENGINEER CHIEF, ARCHITECTURAL DIVISION UNDERSECRETARY


MERALCO AVENUE, PASIG CITY
2
SHEET CONTENTS :
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED) CHECKED BY:
PRC NO. : TIN : SEPTIC TANK, CATCH BASIN DETAIL, LEGEND, NOTES
& DESIGN CRITERIA
PTR NO. : DATE : LOCATION : DATE : 08/06/2004

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545

You might also like