Professional Documents
Culture Documents
OF OF: Perspective View
OF OF: Perspective View
ARCHITECTURAL
STRUCTURAL
SANITARY
ELECTRICAL
ELECTRICAL
E-3 GROUND FLOOR LIGHTING LAYOUT
SECOND FLOOR LIGHTING LAYOUT
SANITARY
CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL : APPROVED FOR ACCREDITATION : CONCURRED : PROJECT TITLE : PROJECT NO: OWNER : SHEET NO:
P
B
TA
PU
I TO R I NG
A-1
IN
SK
RE
ES
EMMANUEL P. CUNTAPAY SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI SIX CLASSROOM DepED
F O RC E
ALBERT Z. DE BELEN
ON
NO
EN
MCMXCIX
&
IN
G
I
T
A
E N
ER
T
IN SM
A
A S SE S
T C
M
E U G ,
DE
ARCHITECT / ENGINEER
TN
UNDERSECRETARY
MERALCO AVENUE, PASIG CITY
6
SHEET CONTENTS :
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED) CHECKED BY:
PRC NO. : 0010990 TIN : 149 460 161 PERSPECTIVE VIEW
PTR NO. : DATE : 27 OCT. 2002 TABLE OF CONTENTS
LOCATION : DATE : 08/06/2004
NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.
2500
SHEET ROOFING
LINE OF ROOF
DETAIL) (PAINT FINISH)
1
A-3
675
3200
LANDING
6725
PAINT FIN.
7000
3200
32mm G.I. PIPE
HANDRAIL WITH 32mm
VERT. SUPPORT
325
NAT. GRD. LN. FINISH)
B
4 LEFT SIDE ELEVATION
2500
FL1 C O R R I D O R
A-3 SCALE : 1 : 100 METERS
FD WF3 FD FD FD FD FD
2500
FINISH)
1 2 3 4 5 6 7 6 (PAINT FINISH)
3200
9000 9000 9000 4500 150mm THK. CHB PLAIN
PLASTER PAINT FIN.
4500 4500 4500 4500 4500 4500 2550 1700
6725
3
PLASTER AND PAINT FIN.
A-3
3200
LN. OF SUNBREAKER
SCHEDULE OF FINISH
WF2 W-3
675
A
HANDRAIL WITH 32mm
VERT. SUPPORT
800
850
FLOORS :
SHE 3 GROUND FLR. LVL. @300mm O.C. (PAINT
HE
325
D-4
D-3
D-4 A-3 NAT. GRD. LN. FINISH)
1100
FL1 - PLAIN CEMENT FLOOR FINISH
860
D-3
1500
A-2 SCALE : 1 : 100 METERS FL2 - PLAIN CEMENT FLOOR ROUGH
7000
7000
1 2 3
4776
FL3 - 200X200 VITRIFIED FLR TILES
9500
( UNGLAZED )
WF1
WALLS :
B CONCRETE HOLLOW
BLOCKS
WF1 - 150 MM THK. CHB W/ PLAIN
UP CEMENT PLASTER FIN (PAINT)
CONCRETE SLAB
2500
CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL : APPROVED FOR ACCREDITATION : CONCURRED : PROJECT TITLE : PROJECT NO: OWNER : SHEET NO:
P
B
TA
PU
I TO R I NG
IN
SK
RE
ES
DepED A-2
EMMANUEL P. CUNTAPAY SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI SIX CLASSROOM
F O RC E
ALBERT Z. DE BELEN
ON
NO
EN
MCMXCIX
&
IN
G
I
T
A
E N
ER
T
IN SM
A
A S SE S
T C
M
E U G ,
DE
ARCHITECT / ENGINEER
TN
UNDERSECRETARY
MERALCO AVENUE, PASIG CITY
6
SHEET CONTENTS :
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED) CHECKED BY:
PRC NO. : 0010990 TIN : 149 460 161 FLOOR PLANS
PTR NO. : DATE : 27 OCT. 2002 LEFT & RIGHT ELEVATION
LOCATION : DATE : 08/06/2004
SCHEDULE OF FINISHES, DAMP PROOFING
NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.
TOP OF TRUSS
2500
TOP OF ROOF BEAM SEE TRUSS DETAIL
538
3200
10200
3200
10
W-1 W-2
4 5 6 W-1 A-5
SECOND FLOOR LEVEL
LANDING
CLASSROOM 3
SECOND FLOOR LEVEL CORRIDOR
6725
EXPOSED CEILING UNDER
SLAB PAINT FIN.
W-3
3200
50mm GA# 40
200x200mm G.I. PIPE
3200
GLAZED WALL HANDRAIL
TILES 9
W-1 W-2
1 2 3 HE SHE A-4
GROUND FLOOR LEVEL
150mm THK. CHB WALL
325
325
FIN. GRD. LN.
200
HANDRAIL w/32mm
VERT. SUPPORT @300mm
9000 9000 9000
OC (PAINT FIN.)
600
600 4500 4500 4500 4500 4500 4500 4500
900
GA.26 CORR. G.I.
SHEET ROOFING w/32mm VERT. SUPPORT
@300mm O.C.(PAINT FIN.)
(PAINT FINISH) 12mM STEEL DOWEL
2500
700
EMBEDD IN CONC.
NON-SKID PLAIN A-3
GA.26 PLAIN G.I. CEMENT FLOOR FINISH NON-SKID PLAIN CEMENT
SHEET GUTTER ON w/GROOVE LINES FLOOR FIN. w/ GROOVE
200
TOP OF ROOF BEAM
12x300mm FIBER LINES
100
200
CEMENT FASCIA BD.
900
700
1200
(PAINT FINISH)
900
700
3200
300
PLAIN CEMENT
PLASTER PAINT WALL
FINISH
W-1
SECOND FLOOR LEVEL
6 DET. ELEVATION OF RAMP 7 DETAIL SECTION
6725
(SEE DETAIL)
W-3
100X100 CONCRETE
SKIRTING
5 6
GROUND FLOOR LEVEL
4500
325
REAR ELEVATION
CENTER PROVIDE 12mm
2
100
STEEL DOWELS (PAINT FIN.)
150
A-3 SCALE : 1 : 100 METERS
1 2 3 4 5 6 7 8 B
2500
GA.26 CORR G.I. SHEET C O R R I D O R
ROOFING (PAINT FIN.)
8 SPOT DETAIL
2500
1200
A-3 SCALE 1:5 M
175
FASCIA BOARD (PAINT
FIN.)
3200
1400
1400
100mm THK. CHB RAILING RAMP UP
3600
NON-SKID PLAIN
3200
5150
D-1 D-1 D-1 D-1 D-1 D-1 32mm G.I. PIPE CEMENT FLOOR
HANDRAIL w/32mm FINISH w/GROOVE TOTAL RUN OF RAMP 32mm G.I. PIPE
LINES
VERT. SUPPORT @150mm 7 HANDRAIL w/32mm
D-1
W-2 W-2 W-2 W-2 W-2 W-2 O.C. (PAINT FIN.) A-3 VERT. SUPPORT @300mm
GROUND FLOOR LEVEL
O.C. (PAINT FIN.)
325
CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL : APPROVED FOR ACCREDITATION : CONCURRED : PROJECT TITLE : PROJECT NO: OWNER : SHEET NO:
P
B
TA
PU
I TO R I NG
IN
SK
RE
ES
DepED A-3
EMMANUEL P. CUNTAPAY SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI SIX CLASSROOM
F O RC E
ALBERT Z. DE BELEN
ON
NO
EN
MCMXCIX
&
IN
G
I
T
A
E N
ER
T
IN SM
A
A S SE S
T C
M
E U G ,
DE
ARCHITECT / ENGINEER
TN
UNDERSECRETARY
MERALCO AVENUE, PASIG CITY
6
SHEET CONTENTS :
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED) CHECKED BY:
PRC NO. : 0010990 TIN : 149 460 161 FRONT& REAR ELEVATION, SECTIONS, DET OF
PTR NO. : DATE : 27 OCT. 2002 RAMP & RAILING
LOCATION : DATE : 08/06/2004
NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.
7-BLADES
260
260
300
±635
600 GA#26 CORR. G.I.
ROOFING SHT. PAINT FIN.
14-BLADES
14-BLADES
±1240
6mm THK. MARINE PLYWOOD
±1240
CEILING ON 50x50mm CEILING
JOIST @600mm BW
2400
2400
2400
2400
2100
2100
2054
STAINLESS STEEL
38mm TEKSCREW
1200
1765
KICKING PLATE
800
GA#26 GI STRAP
1500
COPPER RIVET
900
900
12x300mm FIBER CEMENT
300
FASCIA BOARD FIX W/METAL
300
FFL FFL SCREW ON STL. FRAME PAINT
FINISH
CLASSROOM TOILET (DISABLED) TOILET TOILET (CUBICLE)
TANGUILE PANEL DOOR ON 50X150 MM HOLLOW CORE FLUSH TYPE SWING HOLLOW CORE FLUSH TYPE SWING DOOR SWING DOOR ON 50X100 JALOUSIE WINDOWS WITH CLEAR GLASS JALOUSIE WINDOWS WITH CLEAR GLASS BLADES JALOUSIE WINDOWS WITH CLEAR GLASS
GA#26 GI GUTTER PAINT FIN.
D-1 THK. YACAL/GUIJO JAMB W/ FIXED D-2 DOOR W/ MARINE PLYWOOD FACING D-3 W/ MARINE PLYWOOD FACING INSIDE AND D-4 YACAL/GUIJO DOOR JAMB BLADES ON STANDARD ALUMINUM CASING ON STANDARD ALUMINUM CASING AND FIXED BLADES ON STANDARD ALUMINUM CASING
20x20X2mm ANGULAR BAR
AND FIXED CLEAR GLASS TRANSOM ON CLEAR GLASS TRANSOM ON 50X150
CLEAR GLASS TRANSOM COMPLETE INSIDE AND ORDINARY OUTSIDE
ORDINARY OUTSIDE COMPLETE W/ COMPLETE WITH HARDWARES
W-1 W-2 W-3 ON 50X150 YACAL/GUIJO JAMB COMPLETE FOR FASCIA BOARD FRAME
WITH HARDWARES AND ACCESSORIES
COMPLETE W/ HARDWARES AND HARDWARES AND ACCESSORIES ACCESSORIES 50X150 YACAL/GUIJO JAMB COMPLETE WITH YACAL/GUIJO JAMB COMPLETE WITH WITH HARDWARES AND ACCESSORIES
COATED WITH PRIMER
ACCESSORIES PROVIDE KICK PLATE HARDWARES AND ACCESSORIES HARDWARES AND ACCESSORIES
BASKET STRAINER
600 4500 4500 4500 4500 4500 4500 4500 600 75mm PVC
DOWNSPOUT PAINT
FINISH
RD RD
8
SPOT DETAIL (EAVES)
1000
38mm TEKSCREW
PAINT FINISH
6mm THK. MARINE PLYWOOD CEILING
ON 50x50mm CEILING JOIST
@600mm BW
GA. 26 PLAIN G.I. SHT.
RIDGE ROLL PAINT FIN. 6mm THK. ORD. GA#26 GI STRAP
PLYWOOD CEILING W/ ROOF
6mm GROOVE ON
5
BEAM GA#26 G.I. GUTTER ON 12x300mm
A-4 FIBER CEMENT FASCIA BOARD PAINT
50x50mm CEILING
FIN.
JOIST @600mm BW
(PAINT FIN.)
B GA.26 PLAIN.
SHEET FLASHING
G.I.
ON
BASKET STRAINER
12x300mm FIBER
75mm PVC DOWNSPOUT PAINT
2500
C
LINE OF STRUCTURE
6
SECTION DETAIL (EAVES)
1000
A-4 SCALE : 1 : 40 m.
RD RD SHEET GUTTER
PAINT FINISH
LN. OF STRUCTURE SEE TRUSS DET.
2 ROOF PLAN 4
A-4
FR. 25x75mm WOOD
6 A-4 SCALE : 1 : 100 METERS
FRAMEPAINT FIN.
A-4
1 2 3 4 5 6 7 8
9000 9000 9000 4500 600 6mm THK. ORD.
300
PLYWD. CEILING
600 4500 4500 4500 4500 4500 4500
(PAINT) ON 50x50mm CONC. BEAM
CLG. JST. @600mm
OC BW
1000
A 1175
25x25mm WOOD VENT
6mm THK. MARINE PROVIDE INSECT SCREEN
FR. QUARTER-C
PLYWD. CEILING
MOULDING CEILING
LIGHTING FIXTURE
CONTACT TO CONC. (PAINT) ON 50x50mm
7
DETAIL PLAN (VENT.)
CLG. JST. @600mm
WALL
6mm THK. ORD PLYWOOD CEILING OC BW
w/6mm GROOVE ON 50x50mm
5
SPOT DETAIL (CORNER CLG) A-4 SCALE : 1 : 10 m.
CLEILING JOISTS (PAINT FIN.)
7000
A-4 SCALE : 1 : 10 m.
100
100
b
6mm THK. MARINE PLYWOOD CEILING
A-4
A-4 SCALE : 1 : 100 METERS
CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL : APPROVED FOR ACCREDITATION : CONCURRED : PROJECT TITLE : PROJECT NO: OWNER : SHEET NO:
P
B
TA
PU
I TO R I NG
IN
SK
RE
ES
DepED A-4
EMMANUEL P. CUNTAPAY SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI SIX CLASSROOM
F O RC E
ALBERT Z. DE BELEN
ON
NO
EN
MCMXCIX
&
IN
G
I
T
A
E N
ER
T
IN SM
A
A S SE S
T C
M
E U G ,
DE
ARCHITECT / ENGINEER
TN
UNDERSECRETARY
MERALCO AVENUE, PASIG CITY
6
SHEET CONTENTS :
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED) CHECKED BY:
PRC NO. : 0010990 TIN : 149 460 161 SCHEDULE OF DOORS AND WINDOW, ROOF
PTR NO. : DATE : 27 OCT. 2002 AND REFLECTED CEILING PLAN, EAVES, VENT.
LOCATION : DATE : 08/06/2004
AND SUN BREAKER DETAIL
NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.
50
SCHEDULE 40
19mm SQUARE BAR (PAINT FINISH)
19mm SQUARE BAR
WELD TO G.I. PIPE
W-1 WELDED TO G.I. PIPE
HANDRAIL @146mm O.C.
HANDRAIL @146mm O.C.
900
WELDED TO G.I. PIPE
19mm SQUARE BAR
2500
TYPICAL
L
HANDRAIL @146mm O.C.
9
900
A L
50
8
A-5
900
850
A-5 6 SECOND F.F.L.
5
W
HANDRAIL DETAIL
TYPICAL
A-5
±168
18 17
146
ANCHOR @R.C. STAIR
19 16
A-5 SCALE : 1:20 mts
50
LANDING ANCHOR @R.C. STAIR
TREAD
15 50mm G.I. PIPE SCH.
DN
40 w/19mm SQ. BAR
@ 292mm EACH = 4672mm
14
@146mm ON CENTER 146
25x25x2mm ANGULAR
7000
13 PAINT FIN.
BAR NOSING
7 9 SPOT DETAIL
12 292
25
CRASH RAILING
TYPICAL
11
A-5 SCALE : 1:20 mts A-5 SCALE : 1:20 MTS
10
4 SECTION DETAIL
25
2x25x25mm
4672
337
NOSING @STEP
12x12x2mm FLAT
16 TREADS
BAR STRAP
@600mm O.C.
175
50mm SCH. 40 G.I.
175 50mm G.I. PIPE
PIPE PAINT FIN. 50
SCHEDULE 40
50 50
6 NOSING DETAIL (PAINT FINISH)
19mm SQ. BAR
(PAINT FIN.)
TREAD
(SECOND FLOOR TO GROUND FLOOR)
100
50
900mm FROM
2 DETAIL PLAN OF STAIR 19 mm SQUARE
BAR ANCHOR TO
5 6
7000 2500
8 SPOT DETAIL
ROOF LINE 2460 4540
4500
2067
A 10 SPOT DETAIL
W-1
11 A-5 SCALE : 1:5 MTS
3200
1100
W-1 A-5
TOILET 4 146
2328
100
A-6
200
100 650 100
@168
850
900
700
SECOND FLOOR LINE CORRIDOR
2 RISERS
18
18 16
LANDING 17
50mm SCH. 40 G.I. BRACKECT @600mm O.C. C
16 PAINT FIN.
19 15 15
PIPE HANDRAIL w/19mm
SQ. BAR @146mm O.C
14
14 38mm STAINLESS
13
2856
= 4672mm
200
13
7000
W-3 0
5mm THK.
0
11
20
PLASTER PAINT FIN. FACIAL MIRROR 700 400 10
RISERS @168 =
12
3200
700
9
2863
11 8
600
7 SECOND FLOOR LEVEL
50
200x200mm VITRIFIED
16TREADS @ 292mm EACH
300
5
1726
1625
4672
200
9 @146mm ON CENTER 292 4
PAINT FIN. CS LAV 3
8 342
±168
WC
±900
900
WC 2 ELEV.
787
700
17
7
GROUND FLOOR LINE
1
CORRIDOR SCALE: 1:50m DETAIL
SHE HCR SCALE: 1:20m
6
325
3
16 TREADS @ 292 = 4672
50
B 1
CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL : APPROVED FOR ACCREDITATION : CONCURRED : PROJECT TITLE : PROJECT NO: OWNER : SHEET NO:
P
B
TA
PU
I TO R I NG
IN
SK
RE
ES
DepED A-5
EMMANUEL P. CUNTAPAY SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI SIX CLASSROOM
F O RC E
ALBERT Z. DE BELEN
ON
NO
EN
MCMXCIX
&
IN
G
I
T
A
E N
ER
T
IN SM
A
A S SE S
T C
M
E U G ,
DE
ARCHITECT / ENGINEER
TN
UNDERSECRETARY
MERALCO AVENUE, PASIG CITY
6
SHEET CONTENTS :
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED) CHECKED BY:
PRC NO. : 0010990 TIN : 149 460 161 STAIR AND RAILING DETAIL
PTR NO. : DATE : 27 OCT. 2002
LOCATION : DATE : 08/06/2004
NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.
1100
650
200x200mm VITRIFIED
7 8 200x200mm GLAZED
1100
WALL TILES (GLAZED)
WALL TILES 350 400 350
600
4500
PLAIN CEM. PLASTER
PAINT FIN.
PLAIN CEMENT PLASTER
PAINT WALL FINISH
200
1710
100 1700 200X200 VITRIFIED
CERAMIC WALL
2ND FLR. LVL.
TILES ( GLAZED )
600
W-3 COUNTER SINK
4
300
512
100
800
6
A-7
3200
W-3
2688
2738
2613
CONC. COUNTER 5 DET.PLAN OF C. SINK 6 DETAIL ELEVATION
1600
SINK
300
A-7 SCALE : 1:20 M
A-7 SCALE : 1:20 m.
800
WC
800
MALE
CLASSROOM LVL. TOILET
50
300
TOILET LVL.
600 URINAL
DET. SECTION
8
A-5 LINE OF DOOR JAMB
850
SHE
1100
D-4
16
D-3 50mm SCH. 40 G.I.
15 PIPE HANDRAIL w/19mm
SQ. BAR @300mm OC.
14
1100
10
13
850
0
20
PLASTER PAINT FIN. 150mm THK CHB WALL
MIRROR
UNDER SLAB 700 400 10 PLASTER PAINT FIN.
3200
9
2856
8
2763
600
7
200x200mm VITRIFIED
D-2
GLAZED WALL TILES 6
2100
2100
5
200
1609 1074
1500
300
1625
292 4
3
342
HCR
±920
2
168
1
SHE HCR
GROUND FLOOR LINE
CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL : APPROVED FOR ACCREDITATION : CONCURRED : PROJECT TITLE : PROJECT NO: OWNER : SHEET NO:
P
B
TA
PU
I TO R I NG
IN
SK
RE
ES
DepED A-6
EMMANUEL P. CUNTAPAY SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI SIX CLASSROOM
F O RC E
ALBERT Z. DE BELEN
ON
NO
EN
MCMXCIX
&
IN
G
I
T
A
E N
ER
T
IN SM
A
A S SE S
T C
M
E U G ,
DE
ARCHITECT / ENGINEER
TN
UNDERSECRETARY
MERALCO AVENUE, PASIG CITY SHEET CONTENTS :
6
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED) CHECKED BY:
PRC NO. : 0010990 TIN : 149 460 161 TOILET DETAIL
PTR NO. : DATE : 27 OCT. 2002
LOCATION : DATE : 08/06/2004
NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.
TG-2
TG-2
TG-2
TG-2
TG-2
7000
100mm THICK
SLAB ON FILL
WITH 10mm
SPACED AT 400
BOTHWAYS
2500
TG-1
TG-1
TG-1
TG-1
B
S-3
A FOUNDATION PLAN
S-1 SCALE : 1:100 M.
1 2 3 4 5 6 7 8
STAIR WELL
S-1 S-1 S-1 S-1 S-1 S-1
G - 7
G - 7
G - 7
G - 7
G - 7
G - 7
B-1 B-1 B-1 B-1 B-1 B-1 CB-1
7000
G-5
G-5
B-2
S-2
S-1 S-1 S-1 S-1 S-1 S-1
G-4
G-6
G-6
G-6
G-6
G-6
G-6
G-4
G-1 G-1 G-1 G-1 G-1 G-1 G-1
C
CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL : APPROVED FOR ACCREDITATION : CONCURRED : PROJECT TITLE : PROJECT NO: OWNER : SHEET NO:
P
B
TA
PU
I TO R I NG
IN
SK
RE
ES
ANTONIA M. MANIO WILFREDO S. LOPEZ SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI SIX CLASSROOM DepED
F O RC E
S-1
ON
NO
EN
MCMXCIX
&
IN
G
I
T
A
E N
ER
T
IN SM
A
A S SE S
T C
M
E U G ,
DE
TN
NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.
RG-2
RG-2
RG-2
RG-2
RG-2
RG-2
RG-2
RG-2
T-1
T-1
T-1
T-1
T-1
T-1
T-1
T-1
7000
B
RG-1 RG-1 RG-1 RG-1 RG-1 RG-1 RG-1
2500
RG-1
RG-1
RG-1
RG-1
RG-1
RG-1
RG-1
RG-1
RG-1 RG-1 RG-1 RG-1 RG-1 RG-1 RG-1
C
LC-120x40x20x2.0 PURLINS
12mm CROSS
SPACED @ 750 mm O.C
BRACINGS
WITH %10 SAGRODS @ MIDSPAN
L1 L2
S C H E D U L E OF S L A B S
REBAR SPACING ALONG SHORT DIRECTION REBAR SPACING ALONG LONG DIRECTION
in mm in mm
THICK-
FLOOR SLAB
NESS LEFT SUPPORT MIDSPAN RIGHT SUPPORT LEFT SUPPORT MIDSPAN RIGHT SUPPORT REMARKS
LEVEL MARK REBAR REBAR
in mm SIZE SIZE
TOP BOTT. TOP BOTT. TOP BOTT. TOP BOTT. TOP BOTT. TOP BOTT.
LEVEL
SECOND
S-1 100 10 200 300 - 300 200 300 10 250 300 - 300 250 300 TWO-WAY
S-2 100 10 300 300 - 300 300 300 10 300 300 - 300 300 300 TWO-WAY
CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL : APPROVED FOR ACCREDITATION : CONCURRED : PROJECT TITLE : PROJECT NO: OWNER : SHEET NO:
P
B
TA
PU
I TO R I NG
IN
SK
RE
ES
ANTONIA M. MANIO WILFREDO S. LOPEZ SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI SIX CLASSROOM DepED
F O RC E
S-2
ON
NO
EN
MCMXCIX
&
IN
G
I
T
A
E N
ER
T
IN SM
A
A S SE S
T C
M
E U G ,
DE
TN
NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.
8
MAIN BARS
%10 @250 10 @250
CUT BARS
7
LEVEL C-1 C-2 C-3 1-10
NOSING BAR
NGL
100
350 350 350
125
5
TIE BEAM
12
10 300mm TEMP
(SEE SCHEDULE)
BARS BOTHWAYS
100
400
350
350
350
4-10 CONT. BARS
125
10 @250
10mm
CUT BARS
FLOOR LEVEL TO
DECKLEVEL
L1 L2 L3
D
350
350
350
L2/5 L2/5 L2/5 L3/6
LEVEL TO
MAIN BAR:
8-%16mm
MAIN BAR:
14-%20mm
MAIN BAR:
12-%20mm
D TYPICAL BEAM ELEVATION
FOUNDATION
B E A M S C H E D U L E
BEAM S T E E L R E I N F O R C E M E N T S
DIMENSIONS S T I R R U P S
FLOOR BEAM
LEVEL MARK ( in / mm ) REBAR
LEFT MID SPAN RIGHT
10mm
L
(mm ) (UNLESS NOTED OTHERWISE)
b h TOP BOTTOM TOP BOTTOM TOP BOTTOM
NGL
G-1 200 400 20mm 2 2 2 2 2 2 1@50, 6@100, REST@200
Y-BARS
X-BARS G-3a 200 800 20mm 3 2 2 2 3 2 1@50, 8@175, REST@300
W
X-BARS
G-6 200 400 20mm 3 2 2 2 3 3 1@50, 6@100, REST@200
100 mm THICK
L G-7 250 500 20mm 5 3 2 6 5 3 1@50, 8@100, REST@200
GRAVEL BEDDING
E TYP. FOOTING DETAIL CB-1 200 400 16mm 4 2 4 2 4 2 1@50, 6@100, REST@200
SCALE NTS
S-3
RG-1 200 400 16mm 2 2 2 2 2 2 1@50, 6@100, REST@200
ROOF
LEVEL
RG-2 200 500 16mm 3 3 2
3 3 3 3 1@50, 8@100, REST@200
S C H E D U L E O F F O O T I N G
TG-1 300 500 20mm 3 2 2 2 4 3 1@50, 8@100, REST@200
BEAM
FOOTING DIMENSIONS (mm)
TIE
REINFORCEMENT REMARKS
FOOTING TG-2 300 500 20mm 4 3 2 2 4 3 1@50, 8@100, REST@200
CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL : APPROVED FOR ACCREDITATION : CONCURRED : PROJECT TITLE : PROJECT NO: OWNER : SHEET NO:
P
B
TA
PU
I TO R I NG
IN
SK
RE
ES
ANTONIA M. MANIO WILFREDO S. LOPEZ SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI SIX CLASSROOM DepED
F O RC E
S-3
ON
NO
EN
MCMXCIX
&
IN
G
I
T
A
E N
ER
T
IN SM
A
A S SE S
T C
M
E U G ,
DE
TN
5 S-3
6
C
250 4500
S-4
29 30 25 38 38 25 30 29 2200 2200
BOTTOM CHORD A
2500
W-2
1
W
- 4-12x300mm LONG A
W
1
2
-
W-2
W-2
W
-
-
BENT ANCHOR BOLTS
W
2
2
2
F
W-2
-
S-2
W-2
-
2150
W
W
S-4
50
2
W-2
- 250x200x10mm BASE
W-2
W
2834
PLATE
1187
W-1
W-2
W-2
200
100
STB-2
E
W-2 S-4
2L-2x2x1/4 STRUT W-2 DC-1
DC-1
50
9500 S-3
SEE SCHEDULE OF
= 4500mm
2ND FLOOR LEVEL
DN S-2 (2ND/3RD LVL)
CB-1 FOR DETAIL OF REIN.
CB-1
PLAN
7000
A DETAIL OF T-1 G-3a
STB-2 M
G-2
4500
3200
S-3
2856
6mm GUSSET PLATE
292
250
0
BOTTOM CHORD (FULLY
20
29 30 25 38 38 25 30 29
WELDED TO BASE PLATED)
B-2
TO 6mm GUSSET PLATE (TYP.)
168
P
RD CH
O O
CH RD
MARK DESCRIPTION
P QTY SIZE 4-12x300mm LONG
TO
BENT ANCHOR BOLTS
FULL WELD
COLUMN OR BEAM
B S-3
TG-3
O
KING POST
CH
TO
P 6mm GUSSET PLATE (TYP.)
16 @200 10 @300
FULL WELD
TEMP BARS
200mm 200
200
12 @120
TYPICAL TRUSS
200
H ANCHORAGE DETAIL 16 @ 200
MAIN BAR MAIN BAR:
FULL WELD SCALE 1:5 M 4-16mm
S-3
0
0
F CONNECTION DETAIL M SECTION OF STAIR SLAB
2
6mm GUSSET PLATE (TYP.) %12 @300
TIES : 10 mm
SCALE 1 : 5 M 120x40x20x2.0mm
S-3 STEEL C-PURLINS
2-10
750mm O.C.
STEP BAR
10mm% SAG ROD WITH 200mm
STANDARD NUTS & 10 @300
75
W-2
WASHERS @ EACH END
±7
50
LC-120x40x20x2.0 6-%10x200mm LONG
2-10
PURLINS
STEP BAR
75
1-%10mm A-307
ANCHOR BOLT
L-2.5x2.5x1/4
100
100
100 100
100
CB-1
W-2
10mm @
TG-3
300mm o.c.
3-10mm STB-2
CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL : APPROVED FOR ACCREDITATION : CONCURRED : PROJECT TITLE : PROJECT NO: OWNER : SHEET NO:
P
B
TA
PU
I TO R I NG
IN
SK
RE
ES
ANTONIA M. MANIO WILFREDO S. LOPEZ SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI SIX CLASSROOM DepED S-4
F O RC E
ON
NO
EN
MCMXCIX
&
IN
G
I
T
A
E N
ER
T
IN SM
A
A S SE S
T C
M
E U G ,
DE
TN
NOTE:
THE REVIEW & APPROVAL OF THIS PLANS BY THE DPWH DOES NOT RELIEVE THE DESIGNER/CONSULTANT THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
FROM RESPONSIBILTY FOR THE SAFETY OF THE COMPLETED FACILITIES AS WELL AS FOR THE FAILURE
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
OF THE SAME DUE TO FAULTY DESIGN. ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.
THESE PLANS AND SPECIFICATIONS. THE APPLICABLE PROVISIONS - CEILING LIGHT OUTLET
PANELBOARD: LP MAIN : 100AT, 100AF, 2P, 230V
OF THE LATEST EDITION OF THE PHILIPPINE ELECTRICAL CODE (PEC). 2
- 2 x 40 WATTS FLUORESCENT LAMP
THE RULES AND REGULATION OF THE LOCAL ENFORCING AUTHORITY CIRCUIT BREAKER
F - CEILING FAN OUTLET CKT. VA
DESCRIPTION WIRE & CONDUIT SIZE
AND THE REQUIREMENTS OF THE LOCAL POWER COMPANY. NO. LOAD
S/Sa - ONE GANG DEVICE SWITCH VOLT POLE AT AF
2
3. WIRING METHOD SHALL BE AS FOLLOWS : Sf - FAN CONTROL SWITCH 4 LIGHT OUTLET - 15 x 100W 1500 230 2 20 50 3-3.5mm THW IN 15mm C
2
a. FEEDERS AND RISERS - INTERMEDIATE METALLIC CONDUIT - EXHAUST FAN SWITCH 5 LIGHT OUTLET - 10 x 100W 1000 230 2 20 50 3-3.5mm THW IN 15mm C
S EF
2
b. LIGHTING, POWER RECEPTACLE - POLYVINYL CHLORIDE CONDUIT - RACEWAY CONDUIT CONCEALED IN CEILING 6 LIGHT OUTLET - 10 x 100W 1000 230 2 20 3-3.5mm THW IN 15mm C
50
BRANCH CKT., & AUXILIARY SCH. 40
- RACEWAY CONDUIT CONCEALED UNDER FLOOR 7 S P A R E 1500 230 2 20 50
BUILDING WALL
e. PUSH BUTTON OUTLET - 1.20 M ABOVE FINISH FLOOR
TO SIMILAR OUTLET
@ SECOND FLOOR
2ND FLOOR LINE
PANEL LP
2
2-30mm THW B B
IN 32MMORSC
TO LINE SIDE OF LP
FA
20 20 2
2-3.5mm THW
IN 15MMORSC
20
20 TO NEAREST C.O.
ENCLOSED ACB
RATING: 20AT, 50AF,
230V, 2P
1500 mm
2
2-3.5mm THW
1800 mm
20 20
IN 15MMORSC
GROUND TERMINAL
ELECTRICAL FIRE ALARM VIBRATING BELL
GROUND FLOOR LINE
2
#8mm BARE COPPER WIRE
FIN. GRADE LINE
2
1-8.0mm BARE COPPER WIRE
16mm O x 2.40m
IN 15mmO C
I
COPPERWELD
GROUND ROD 16MMO x 240MM LENGTH
GROUNDING ROD COPPERWELD
CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL : APPROVED FOR ACCREDITATION : CONCURRED : PROJECT TITLE : PROJECT NO: 99-013 OWNER : SHEET NO:
P
B
TA
E-1
PU
I TO R I NG
IN
SK
RE
ES
VENERANDO D. SAHAGUN FE M. BARRIENTOS SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI SIX CLASSROOM DepED
F O RC E
ON
NO
EN
MCMXCIX
&
IN
G
I
T
A
E N
ER
T
IN SM
A
A S SE S
T C
M
E U G ,
DE
TN
NOTE:
THE REVIEW & APPROVAL OF THIS PLANS BY THE DPWH DOES NOT RELIEVE THE DESIGNER/CONSULTANT THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
FROM RESPONSIBILTY FOR THE SAFETY OF THE COMPLETED FACILITIES AS WELL AS FOR THE FAILURE
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
OF THE SAME DUE TO FAULTY DESIGN. ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.
B
LP
B B
F
1 2 3 4 5 6 7 8
B
UP
TO C.O.
LP
B B LP
TO FA
F
C
FA
CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL : APPROVED FOR ACCREDITATION : CONCURRED : PROJECT TITLE : PROJECT
PROJECTNO:
NO:99-017 OWNER : SHEET NO:
P
B
TA
PU
I TO R I NG
E-2
IN
SK
RE
ES
VENERANDO D. SAHAGUN FE M. BARRIENTOS SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI SIX CLASSROOM DepED
F O RC E
ON
ENCODED
ENCODEDBY: Max C.
BY:RDS
D
NO
EN
MCMXCIX
&
IN
G
I
T
A
E N
ER
T
IN SM
A
A S SE S
T C
M
E U G ,
DE
TN
3
BUREAU OF DESIGN, DPWH
PRC NO. : TIN :
GROUND FLOOR POWER LAYOUT
PTR NO. : DATE : LOCATION : DATE : 08/06/2004
DATE:5-5-00
SECOND FLOOR POWER LAYOUT
NOTE:
THE REVIEW & APPROVAL OF THIS PLANS BY THE DPWH DOES NOT RELIEVE THE DESIGNER/CONSULTANT THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
FROM RESPONSIBILTY FOR THE SAFETY OF THE COMPLETED FACILITIES AS WELL AS FOR THE FAILURE
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
OF THE SAME DUE TO FAULTY DESIGN. ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.
A
a b c d e f 2
2 2 2 2 2 2
S
F F F
a b c d e f
2 2 2 2 2 2
LP
Sab Sf Scd Sf 6
Sef Sf
B
Sgh Sij
g h i j
2 2 2 2
LP
1 2 3 4 5 6 7 8
A S EF
EF
a b c d e f S
2 2 2 2 2 2
k
Skl
F F F
a b c d e f
2 2 2 2 2 2
LP
B
UP
Sgh Sij
g h i j
2 2 2
2
LP
C
3
RAMP
UP
P
B
TA
PU
I TO R I NG
IN
SK
RE
ES
VENERANDO D. SAHAGUN FE M. BARRIENTOS SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI SIX CLASSROOM DepED
F O RC E
NO
EN
MCMXCIX
&
IN
G
I
T
A
E N
ER
T
IN SM
A
A S SE S
T C
M
E U G ,
DE
TN
NOTE:
THE REVIEW & APPROVAL OF THIS PLANS BY THE DPWH DOES NOT RELIEVE THE DESIGNER/CONSULTANT THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
FROM RESPONSIBILTY FOR THE SAFETY OF THE COMPLETED FACILITIES AS WELL AS FOR THE FAILURE
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
OF THE SAME DUE TO FAULTY DESIGN. ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.
RD RD RD RD RD RD RD RD
1000
A
7000
B
2500
C
1000
LN. OF STRUCTURE
TR
CV
PV
m
RD RD RD RD RD RD RD RD
m
50
R
E
00
W
10
E T O
E
T S T
S
R P
ROOF DRAIN LAYOUT
A S
2
S E
M
00
V
P
25 50
E
50mm PVCVTR
WTVCVP
39
Y
S
L
W
75mmPVCDS
S
P
K
AN VT
R
IC
V
G
V
C
P
m
T
5
P-1
m m
P
I m 12
mm05
C
m
SCALE : 1 : 100 METERS
W
00 m VT
T
1 50 SE
SE
R
S
P
V
C
V
C
I
P
R
P
L
P
S m m W
m
m
C
50 0m
IC
TW
V 0m
C
W
P
W
G
CV
10 10 m VT
3 2 1 4 5 4 5 6
O
00 PV E m
C
2500 1000
V
SH
C
20 12
P
00 m
m 4 m
23 50
75mm S m
50 SE
-
F
R
C
B
D
PVCWP
m
C
m S
I
4
R
C
W
75 V 3 3
O
C
C
D
D
3950
V
R
E LA
C
4 H F
D
H
-
D
2
-
L
D
W
VT
L
IC
SE
R
W
IC
D
G
V
C
P
G
m
I
R
C
P
m
m m
m
20
0m
O
m
m F
D
C
12
50
P
W
15
75mmPVCDS
V
C
2300
2000
P
m
0m
75mmPVCDS
5
SEPTIC TANK 10
P
U
LY
P
PVCSP TO
P
U
L S
W
IC
R
IN
E
G
A
AT
NEAREST SEWER
M
W m
O
T m
38
V
G
B
m
C
SYSTEM m
75 V
S
OM
M
D
RO
V
G
SS
P
m
150mmCPD 150mmCPD 150mmCPD CL
A m
75 V
S
D
CB CB CB
C
CB
P
D
P
C
m
P P
0m F
M
A
15
B
U
75mmPVCDS
C
7
100mm
5
75mmPVCDS
PVCSP
1
P
m
V
m
C
75mm 75mm
P
W
D
C
P
75mm PVCDS 75mm 100mm PVCSP 0m
m
EM
15
PVCDS PVCDS ST
D
P
SY
PVCDS
R
A
75mPVCDS
75mPVCDS
C
m E
50mm PVCVTR 0m
G
T
75mPVCDS
A
75mPVCDS
IN
B
m
15
V
C
A
m S M
R
5
m
0
V
C
V
P
T
W
m
RISER 75 V
D
C
OO
P
D
IN
WC
C
SR
V
A
50mPVCTR
2
M
P
m
S
O
m 0m
A
T
12mm GICWL m S 15
SHE CL
P
75 V
12mm GICWL
D
HE
C
P
m
m
D-4 50mm PVCVTR
D
D-4
P
C
100mm PVCWP D-3 m
RISER 0m F
D
0
5
15
B
C
FD
75mmPVCDS
D-3
75mmPVCDS
3
CS CO
ROOF LINE
50mm PVCVTW
CO
D
P
100mm PVCSP S
C
m
WC
D
V 0m
C
15
P
D-2 m M
HCR 12mm GICWL m
RO
O
75
SS
50mPVCTW
m
FD A m S
B
CL
C
75 V
D
150mm CDP
C
LAV 50mm PVCVTW
P
RISER
CO
B
20mm GICWL
C
E
N
LI
75mmPVCDS
F
O
O
R
15
0m
D
P
m
C
m
0m
15
C
D
P
S
D
V
C
P
m
m
75
B
B
B
UP
C
EM
ST
SY
E
G
A
IN
A
R
D
P
D
IN
C
A
M m
O
0m T
15
C FD FD FD
75mPVCDS
75mPVCDS
75mPVCDS
75mm 75mm 75mm
75mPVCDS
75mm PVCDS
PVCDS PVCDS PVCDS
RAMP
WATER SUPPLY
150mm CDP
GICWL
UP
TO MAIN
150mmCPD 150mmCPD 150mmCPD
38mm
CB CB CB CB
GV
1 PUMBING RO-IN LAYOUT 3 I S O M E T R I C V I E W
M
GV
P-1 P-1
TO MAIN DRAINAGE SYSTEM
150mm CDP
CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL : APPROVED FOR ACCREDITATION : CONCURRED : PROJECT TITLE : PROJECT NO: OWNER : SHEET NO:
P
B
TA
PU
I TO R I NG
IN
SK
RE
ES
DepED P-1
EMMANUEL P. CUNTAPAY SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI SIX CLASSROOM
F O RC E
NO
EN
MCMXCIX
&
IN
G
I
T
A
E N
ER
T
IN SM
A
A S SE S
T C
M
E U G ,
DE
TN
NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.
CB CATCH BASIN
CO CLEAN OUT
CV CHECK VALVE
HB HOSE BIBB
FD FLOOR DRAIN
100
100
NGL
MH PVCDP POLYVINYL CHLORIDE DRAIN PIPE
VAR
INLET
100
PVCSP POLYVINYL CHLORIDE SOIL PIPE
350
300
WATER LEVEL 700
25
WATER
LEVEL PLASTERED W/WATERPROOFING
COMPOUND OR APPLY ONE FACE PVCVAC POLYVINYL CHLORIDE VENT. ACROSS CEILING
150 700 150
PLASTERED W/ WATERPROOFING BITUMEN TAR 150 400 150
WALLS REINFORCEMENT COMPOUND OR APPLY ONE
LEACHING 10mm VERT. & HOR. BAR FACE BITUMEN TAR
PVCVP POLYVINYL CHLORIDE VENT. PIPE
2125
CHAMBER @200mm OC BW
DIGESTIVE CHAMBER
DIGESTIVE (W. LEVEL)
150
DRAINAGE PIPE
@200mm O.C BWAYS
100mm THK. SLAB W/
1600
700
400
INLET OUTLET
150 2500 150
PVCWS POLYVINYL CHLORIDE WASTE STACK
150 1000 150 3200 150
2800
RD ROOF DRAIN
150
100mm THK. + FIM. SLAB W/
10mm REBARS @300mm O.C. BW
2 SECTION DETAIL UD URINAL DRAIN
2-10mm EXTRA
S-1a 100mm THK. + FIN. SLAB W/ CS COUNTER SINK
BARS TOP/BOT. ON 10mm REBARS @ 300mm O.C.
TWO PARALLEL SIDE BENT UP 2 OUT OF 3 AT L/4 150MM THK. CHB W/ 10mm
FROM FACE OF SUPPORT B.W. REBARS HOR. EVERY 2-LAYERS
700
VERT. @600mm O.C.
4650
1000 3200
150 150 150 150 400 150 PLUMBING NOTES:
200 600 200 1100 150 700 150 1100 75 75mm 1. GRADES OF HORIZONTAL PIPINGS
PVCDS
RUN ALL HORIZONTAL PIPINGS IN PERPECT ALIGNMENT AND AT A FORM GRADE NOT LESS THAN TWO PERCENT (2
150
100
2. CHANGE IN DIRECTION
CDP
ALL CHANGE IN DIRECTION SHALL BE MADE BY APPROPRIATE USE OF FORTY-FIVE DEGREES (45°) WYES, LONG SWEEP
900
OUTLET QUARTER BEND, SIXTH-EIIGHT OR SIXTEENTH BEND. WHEN THE CHANGE OF FLOW IS FROM HORIZONTAL TO VERTICAL A
50
2SLOPE SINGLE 1/8 BEND COMBINATION MAYBE USED ON VERTICAL STACKS AND SHORT QUARTER BENDS MAYBE USED ON WASTE
INLET
CDP LINE, TEE AND CROSSES MAYBE USED IN BENT PIPES.
(VARIABLE)
50 600 50
600 min.
2SLOPE
50
2800
2500
3. PROHIBITED FITTINGS
MH MH OUTLET
NO DOUBLE HUB OR TEE BRANCH SHALL BE USED ON HORIZONTAL SOIL AND WASTE LINES, THE DRILLINGS AND TAPPING
100
10mm BAR
OF HOUSE DRAIN, WASTE OR VENT PIPES AND USED OF SADDLE HUB AND BEND ARE PROHIBITED.
HANDLE 3-10mm (E.W.)
50 (TYP.)
100
P-3
1.
4. PIPE CLEAN-OUTS
2 600
900
8. ALL PLUMBING WORKS SHALL BE UNDER THE SUPRVISION OF A LICENSED MASTER PLUMBER AND A LICENCED PLUMBING
1 SEPTIC TANK DETAIL 4 MANHOLE DET. SECTION CONTRACTOR.
DESIGN CRITERIA
fy = 230 MPa
4. ASSUMED ALLOWABLE BEARING CAPACITY Y = 100KPa
NOTE:
WATER TABLE IS 1500 BELOW GROUND LEVEL.
CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL : APPROVED FOR ACCREDITATION : CONCURRED : PROJECT TITLE : PROJECT NO: OWNER : SHEET NO:
P
B
TA
PU
I TO R I NG
IN
SK
RE
ES
DepED P-2
EMMANUEL P. CUNTAPAY SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI SIX CLASSROOM
F O RC E
NO
EN
MCMXCIX
&
IN
G
I
T
A
E N
ER
T
IN SM
A
A S SE S
T C
M
E U G ,
DE
TN
NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.