During implementation, ECC ATP configuration needs to be transferred once
through CIF and in APO gATP global setting configuration setting, �Import Customization� allowed indicator needs to be activated. After implementation, both CIF and APO gATP global setting configuration setting, �Import Customization� needs to be deactivated. Manually, APO configuration needs to be updated for any changes in ECC ATP configuration. 2. Minimum bucket period for gATP is 1 day. 3. Temporary quantity assignment (TQA) indicator if you want to make it possible for several users to check the same planning object simultaneously and nevertheless obtain consistent results from the availability check (It should be available in gATP global setting configuration (Table - /SAPAPO/ATP00)). 4. Terminology APO Vs ECC: a. Business Event � Checking Rule (A,BO, PP, Etc.) b. Check Mode � Requirement Class (030, 010, etc.) c. ATP Group - Availability Check (01, 02, etc)