You are on page 1of 1

1.

During implementation, ECC ATP configuration needs to be transferred once


through CIF and in APO gATP global setting
configuration setting, �Import Customization� allowed indicator needs to be
activated. After implementation, both CIF and
APO gATP global setting configuration setting, �Import Customization� needs to be
deactivated. Manually, APO configuration
needs to be updated for any changes in ECC ATP configuration.
2. Minimum bucket period for gATP is 1 day.
3. Temporary quantity assignment (TQA) indicator if you want to make it possible
for several users to check the same planning
object simultaneously and nevertheless obtain consistent results from the
availability check (It should be available in gATP
global setting configuration (Table - /SAPAPO/ATP00)).
4. Terminology APO Vs ECC:
a. Business Event � Checking Rule (A,BO, PP, Etc.)
b. Check Mode � Requirement Class (030, 010, etc.)
c. ATP Group - Availability Check (01, 02, etc)

You might also like