Furnace transformer for steel production

siemens.com/transformers

The challenge The solution


Furnace transformers are essential for Siemens designed a 100 MVA (at
steel production processes. They must 65/65/80 K) transformer for Gerdau
be able to withstand extraordinarily Cartersville with a rated voltage ratio
severe conditions and yet still provide of 34.5 kV / 1150-651 V. The total
reliable service. weight of the transformer was 96.9
tons – which equals approximately one
Our customer, Gerdau, is one of the
ton per MVA.
largest producers of long steel on the
North American continent. Their The unit was designed and manu-
production site in Cartersville, Georgia, factured at the Siemens transformer
U.S. needed a new furnace transformer plant in Dresden, Germany – the
with a higher rating to replace a unit center of competence for special
for expanding production capacities transformers for industrial applica-
and improved process reliability. tions. The selection, qualification,
audit, and approval of global suppliers
However, the dimensions needed to be
and materials as well as the research
kept to a size that would enable it to fit LV connection of the furnace transformer
and development was all performed at
into the existing transformer vault.
this location. “Siemens delivered a world
Gerdau put its trust in the German class transformer, from
Gerdau engineers, knowing that they are design to build. The highest
Gerdau is the leading manufacturer familiar with the industry’s challenges.
of long steel and a major global These include the expanding
quality one could expect.”
supplier of special steel. Gerdau has production capacities, which require Adam Myers, Project Manager,
industrial operations in 13 countries higher currents – leading to a need for Gerdau Cartersville, Georgia
with a combined installed capacity ever more powerful transformers that
of more than 25 million tons of steel are even more reliable than their
per year. predecessors.
Technical features 3. Bushing cooling Additional information on furnace
1. Winding technology transformers
In order to design and manufacture a Siemens Transformers offers AC and
robust transformer that can meet the DC electric arc furnace transformers
performance specifications of the to provide high currents (up to 180
Gerdau steel plant in Cartersville, a kA) for the electric arc. They are
special winding setup was chosen for specifically designed to withstand the
the furnace transformer. The high- exceedingly demanding conditions of
voltage winding was manufactured in metallurgical steel melt processes.
disc winding technology to enable the
incorporation of radial and axial Technical features:
cooling ducts through the winding Water-cooled copper U-tube bushings ƒ ratings up to 300 MVA
setup. are one of the standards in Siemens ƒ secondary voltage up to 2 kV
furnace transformer designs. These ƒ electrode current for steel up to
The low-voltage windings were done undergo the most stringent quality 120 kA / for ferroalloy up to 180
in layer winding technology using net controls during manufacture because kA
copper transposed conductors (NCTC). the water-conducting elements are
The winding ends of the low-voltage immersed in oil. Design options:
winding have a special clamping
ƒ Direct or indirect regulation or
design to withstand the high forces 4. Tap-changer compartment booster design
during operation. All connections
ƒ On-load or off-load tap changer
designed for carrying high current
ƒ Oil or vacuum type OLTC
were brazed.
(also reactor type OLTC)
2. Active part cooling ƒ Series reactor (built-in or
For the operational reliability and separate) for long arc stability
service life of the transformer, the ƒ Air- or water-cooled secondary
effectiveness of the cooling is critically bushing arrangements and
important. The standard cooling in designs
furnace transformers is so-called oil- ƒ Internal secondary phase closure
forced (OF) cooling. The oil/air- or (internal closed delta)
oil/water-coolers can be mounted on The furnace transformer for Gerdau is ƒ Special shield design for each
the transformer directly or installed equipped with on-load tap-changers, project, to prevent heating caused
separately. so that they can be adapted to by high magnetic fields
different voltage levels under load. The ƒ Oil-forced- or oil-directed-cooling
For large transformers like the furnace tap changer in this case is stored in the
transformer for Gerdau, however, a same tank as the active part, but
more effective cooling method was physically separated from the
needed. The experts thus decided in transformer’s core and windings by a
favor of an oil-directed (OD) circulation compartment.
through the windings.
During maintenance, only the oil in the
OLTC compartment needs to be
drained. Windings and winding
insulation parts can stay immersed in
oil during the maintenance process.

Editor © 2017:
Siemens AG
Energy Management Division
Freyeslebenstrasse 1
91058 Erlangen, Germany

Siemens Transformers
Katzwangerstrasse 150
90461 Nuernberg, Germany