0040 - (P07-P08)
0040 - (P07-P08)
KEY PLAN
S
1 2 3 4 5 6 7 8 9 10 11 12 13
W
VARIES BERTAMB
AH
MUTU
65
1200
875
65
4Ø B KERAJAAN MALAYSIA
4Ø
65
C
PROJECT TITLE:
D
350
PROJEK MASS RAPID TRANSIT LEMBAH KELANG
E
LALUAN SUNGAI BULOH - SERDANG -
P1 T40 COUPLER L = 1400 P2 T32 COUPLER L = 1120 P3 T25 COUPLER L= 875 U1 T32 SUSP. HOOK L = 2750 WALL TYPE D4 PUTRAJAYA (SSP LINE 2)
GUIDE WALL
PROJECT PACKAGE:
80
1st layer A4 T 25 40 10500 3.853 1618.411 P E N G A N G K U T A N AW A M D A R A T
40 40 6400 9.865 2525.338 L A N D PUBLIC TRA NSPORT
300 REBAR CAGE
B1 T
SPAD
64
2nd layer B2 T 25 40 9000 3.853 1387.210 C O M M I S S I O N
1050
1050
B3 40 40 6860 9.865 2706.846
1050
T
1088
1001
C2 T 40 40 6330 9.865 2497.717
D1 T 40 40 12000 9.865 4735.008 THREADED BAR (BOTH SIDE)
515 300 BLOCK D, PLATINUM SENTRAL,
45°
100 100 80 D2 T 40 40 12000 9.865 4735.008 THREADED BAR (ONE SIDE)
JALAN STESEN SENTRAL 2,
D3 T 40 40 7210 9.865 2844.951
KUALA LUMPUR SENTRAL,
1st layer 25 40 9500 3.853 1464.277
L1 L2 EX LINK L = 5182 U-LINK L = 2775 L3 L4 C- LINK L = 1194 L7 T25 STIFFENER L = 2045
D4 T 50470 KUALA LUMPUR.
E1 T 25 40 9990 3.853 1539.803 Tel : 603-2726 7000 / Fax : 603-2726 7100
L5 L6 THREADED BAR (ONE SIDE)
E2 T 40 40 12000 9.865 4735.008
E3 T 40 40 3260 9.865 1286.344 THREADED BAR (ONE SIDE) PROJECT OWNER :
Sum 52842.380
Mass Rapid Transit Corporation Sdn Bhd
Links
(902884-V)
L1 T 12 380 5182 0.888 1748.248
5th FLOOR MENARA I&P 1,
Ex-Link L2 T 16 376 5182 1.578 3075.281
NO.46, JALAN DUNGUN, BUKIT DAMANSARA,
1200 L3 T 12 950 1194 0.888 1007.048
50490 KUALA LUMPUR.
75 1050 75 C-link L4 T 16 940 1194 1.578 1771.461 TEL : +603-2081 3000 / FAX : +603-2095 2121
L5 T 12 190 2775 0.888 468.100
DETAIL B MAIN BAR U-link L6 16 188 2775 1.578 823.418 CONTRACTOR :
T
U-BOLT
Stiffener L7 T 25 56 2045 3.853 441.287
CUSTOM MADE BEAM SPACER BLOCK L8 T 25 16 4286 3.853 264.248
HANGING BAR
Sum 9599.090
Lifting
MMC - GAMUDA KVMRT (T) SDN BHD
1500
Hanging bar (934628-H)
3000
H1 T 40 8 2844 9.865 224.439
Susp. Hook U1 T 32 16 2750 6.313 277.787 For Hanging
U BOLT bar LEVEL 2, CORPORATE BUILDING (BLOCK E),
STIFFENER
U Bolt 800 - PUSAT KOMERSIAL SOUTHGATE,
CUSTOM MADE Sum 502.227 NO.2, JALAN DUA, OFF JALAN CHAN SOW LIN,
BEAM U BOLT Connection
55200 KUALA LUMPUR
1500
Coupler
TEL: +603 2385 8000 FAX: +603 9221 0993
6400 P1 T 40 276 1400 9.865 3811.682
LEAD DESIGN CONSULTANT & DETAILED DESIGN CONSULTANT :
100 CAGE A LENGTH = 2844 200 CAGE B LENGTH = 2844 412
3000
P3 T 25 44 875 3.853 148.354
75
3000
Spacer Bar 25 32 500 3.853 61.654
1500
FR2 T
FR3 T 25 48 950 3.853 175.713 AECOM Perunding Sdn Bhd (278613-X)
D:\STEVEN\2016\180047 - HKLS SHOP DRAWINGS_KELLER\04. DRAWING\WALL TYPE D4\20170523 - RESUBMISSION\20170523 - P07-P08 - RESUBMISSION\FOR APPROVAL\H02\100040 - 6.4M (P07-P08) - H02 (FOR APPROVAL).DWG
1050
1200
COUPLER ARRANGEMENT Tel: +603 2385 8000 Fax: +603 7722 3724
1500
75
STIFFENER
N.T.S GROUND ENGINEERING SPECIALIST :
TABLES ARE NOT MET, REFERENCE SHALL BE MADE TO BS 8110 IN ORDER TO 3. SSP-F-MGKT-UNGW-HKLX-CNS-RED-011055 REV. F02F
DETERMINE THE APPROPRIATE ANCHORAGE AND LAP LENGTHS. 4. SSP-F-MGKT-UNGW-HKLX-CNS-RED-011005 REV. F02B Drawn By : ARA Scale : AS SHOWN
REBAR CAGE REBAR CAGE 6. TYPE OF COUPLER TO BE ADVISED BY SUPPLIER. 5. SSP-F-MGKT-UNGW-HKLX-CNS-LOP-001233 REV. F02D
7. THE BAR BENDING SCHEDULE ARE BASED ON STANDARD PANEL LENGTH OF 6.4m 6. SSP-F-MGKT-UNGW-HKLX-CNS-LOP-001234 REV. F02D Checked By : AMH Date : 09 AUG 2017
8. MATERIAL PROPERTY 7. SSP-H-KMSB-UNGW-HKLX-CNS-LAP-000008 REV. H11 CAD file no : SSP-H-KMSB-UNGW-HKLX-CNS-RED-100040
MAIN BAR a. CONCRETE : C32/40
HANGING BAR H1 Drawing Title :
b.REINFORCEMENT : GRADE 500
U-BOLTS TO 9. THE COUPLER TOLERANCES SHALL BE WITHIN ± 75mm ONLY. HOSPITAL KUALA LUMPUR CROSSOVER
PROVIDE AT ALL DETAIL C DETAIL C 10.THE SUM OF ALL COUPLERS TOLERANCES SHALL NOT EXCEED ± 250mm.
PANEL LENGTH Disclaimer:
MAIN BARS N.T.S
This drawing is produced and issued for specific request of our client under specific purposes connected with the above captioned project only. It should not be used by
0 250 500 750 1000 1250 any other party for any other purpose without permission. This drawing remain as intellectual property of One Smart Engineering Sdn Bhd and any duplication of the REINFORCEMENT OF DIAPHRAGM WALL TYPE D4
drawing or any part of the drawing shall be treated as infringement of copyright. One Smart Engineering Sdn Bhd shall reserve the right to take legal action against any P07 TO P08 SECONDARY PANEL
HANGING BAR LAYOUT infringement of copyright of the drawing.
MILLIMETRES
SCALE 1:50
1 : 25 We accept no responsibility for the consequences of this drawing being used by any other party for any other purpose, or containing any error or omission which is due to
an error or omission in data given to ONE SMART Engineering Sdn Bhd by other parties. (SHEET 3 OF 3)
Drawings and sketches may not, without our express permission, be copied or
reproduced nor be handed over to third parties either in original or copy.
NOTES
1. THE SITE IS DEEMED TO BE FREE FROM OBSTRUCTION OF SERVICES ANY
NOTES :
ACTUAL SETTING-OUT CO-ORDINATES SHALL BE FURTHER VERIFIED BASED ON This document contains confidential information and proprietary intellectual property. It should not be shown to other parties without consent from us and from the party SHOP DRAWING Drawing No : Rev
APPROVED PRE-COM DRAWING. which commissioned it. SSP-H-KMSB-UNGW-HKLX-CNS-RED-100040
Ownership and copyright is reserved by Keller (M) Sdn. Bhd. SERVICES FOUND SHALL BE RELOCATED BY CLIENT. H02