WEIGH UP

V VOLUME TO WEIGH UP bbls 100 BBLS


W1 ORIGINAL MUD WEIGHT lb/gal 9 BBLS
W2 DESIRED MUD WEIGHT lb/gal 9.5 BBLS
W3 INCREASE WEIGHT lb/gal 11.6 BBLS
Volume W3 required 23.8 BBLS
Volume after weigh up 123.8 BBLS
Cut Back
V VOLUME TO CUT BACK bbls 311 BBLS
W1 ORIGINAL MUD WEIGHT lb/gal 11.6 BBLS
W2 DESIRED MUD WEIGHT lb/gal 9 BBLS
W3 CUT BACK WEIGHT lb/gal 8.5 BBLS
Volume W3 required 1617.2 BBLS
Volume after cut back 1928.2 BBLS
KCL Material
Percent Desired 2%
Fluid Weight 8.33 ppg
Sack Size 50 lbs
Fluid Volume 330 BBLS
Sacks Required 46.2 sks 2310 0.0875
Final Weight 8.4175 ppg
Hole Capacity / Barrels
Casing ID 25.5 Inches 650.25
Drill Pipe OD 0.00 Inches
Drill Pipe ID 0.00 Inches
Drill Pipe Wt 0.00 Lbs/Ft
Casing Length 115 Ft
Drill Pipe Length 3,541 Ft
Casing Volume 72.64 BBLS BBL/FT 0.63168 BBLS
Drill Pipe Volume 0.00 BBLS BBL/FT 0 BBLS
Annular Volume 72.643 BBLS BBL/FT 0.63168 BBLS
Drill Pipe Displacement 0.00 BBLS BBL/FT 0 BBLS

72.643 barrels
3051.006 gals
25933.551 Pounds
Annular Capacity / Barrels
Casing ID 6.625 Inches
Drill Pipe OD 3.5 Inches
Casing Length 11,960 Ft
Drill Pipe Length 11,960 Ft
BBL/Ft 0.0307 BBLS 31.640625
Annular Volume 367.61 BBLS
Pipe Displacement
Lb/Ft 13.3 LBS/Ft
Pipe Length 7,415 Ft
BBL/Ft 0.0048 BBLS
Pipe Disp. Vol. 35.849 BBLS
Volume Pipes/Hoses Pipe Information
Pipe/Hose ID 7.375 Inches 1.25 Combined wall Thickness
Pipe/Hose Length 47104 Ft 8.625 OD of pipe
BBL/Ft 0.0528 BBLS 7.375 ID of pipe
GAL/Ft 2.2192 GPF
Pipe/Hose Vol. 2488.84 BBLS 47104 total pipe length calc
Pipe/Hose Vol. 104531 GALS

Extra amount pumped


3689.55 extra gals
87.8465 extra bbls
1662.59 extra feet
Triplex Output Barrels Per Stroke
Pump Efficiency = bbl/stk x pump efficiency
Liner ID Square 5.75 Inches
Stroke Length 12 Inches
Pump Efficiency 95 %
BBL/Stroke Output 0.0916 BBLS 0.0964
Hydrostatic Head
Fluid Weight 11 ppg
TVD 19,148 Ft
PSI 10,953 PSI
Rectangular Tank
Tank Length 40 Inches Barrels per inch 0.124 BBLS
Tank Width 30 Inches Barrels per foot 1.484 BBLS
Tank Height 60 Inches Gallons per inch 5.195 Gals.
Tank Volume BBLS 7.42 BBLS Gallons per foot 62.338 Gals.
Tank Volume Gals. 311.7 Gals.
Round Tank
Tank Diameter 36 Inches Barrels per inch 0.105 BBLS
Tank Height 72 Inches Barrels per foot 1.260 BBLS
Tank Volume 7.6 BBLS Gallons per inch 0.002 Gals.
Tank Volume Gals. 317.4 Gals. Gallons per foot 0.030 Gals.

423.6
222

540
CaCl2 Weight Up Chart CaBr2 & ZnBr2 Weight Up Chart
Using (94-97% CaCl2) Using (94-97% CaCl2)
Beginning Fluid Weight: 8.5 PPG. Beginning Fluid Weight: 12.1 PPG.
Fluid Weight Desired: 11.6 PPG. Fluid Weight Desired: 12.3 PPG.
Beginning Fluid Volume: 300 BBLS. Beginning Fluid Volume: 500 BBLS.
Amount Of Sacks: 813.75 SKS. Amount Of Sacks: 162.5 SKS.
Volume Gain: 77.5 BBLS. Volume Gain: 15.476 BBLS.
Ending Fluid Volume: 377.5 BBLS. Ending Fluid Volume: 515.48 BBLS.

CaBr2 & ZnBr2 Weight Up Chart


Using (95% CaBr2)
Beginning Fluid Weight: 14.47 PPG.
Fluid Weight Desired: 14.6 PPG.
Beginning Fluid Volume: 298 BBLS.
Amount Of Sacks: 81 SKS.
Volume Gain: 4.0501 BBLS. X
Ending Fluid Volume: 302.05 BBLS.
Approximate Volume of Hose Feet Gallons Barrels
2" hose = 0.02 cu. ft./fooGallons per foot 0.1496 120 17.95 0.43
3" hose = 0.04 cu. ft./fooGallons per foot 0.2992 20 5.98 0.14
4" hose = 0.08 cu. ft./fooGallons per foot 0.5984 300 179.53 4.27
Filter Press Square Footage Chart
Actual Nominal Total Number Total Square
Size Size Area of Plates Footage
(MM) (Inches) (Ft2)
1000 39.375 16.85 52 876.2
1200 47.25 24.58 65 1597.7
Balancing a Pill
Amount of Pill to be Spotted: 2
Casing O.D. 7.625
Casing I.D. 6.625
Drill Pipe O.D. 3.5
Drill Pipe I.D. 2.76
Annular bbls. per ln. ft. 0.0307369584
Tubing bbls. per ln. ft. 0.0074000389
Sum of Annular & Tubing bbls. per ln. ft. 0.0381369973
Total ln. ft. of Pill Coverage: 52.4425136389
Amount of Pill to Leave in Tubing: 0.3880766387