You are on page 1of 97

TPSi

OBUKA

Fronius International GmbH


Perfect Welding
Generalni zastupnik za BiH:
AX-Soling doo
88340 Grude
NOVI KOMPAKTNI SUSTAV

TPS 270i C Pulse

TPS 320i C Pulse

Fronius International GmbH / Perfect Welding , Team Training / APP034 TPS/i


NOVI DVOKOMPONENTNI SUSTAV

TPS 320i / 400i / 500i / 600i

TPS 320i / 400i / 500i / 600i PULSE

TPS 400i LSC Adv

Fronius International GmbH / Perfect Welding , Team Training / APP034 TPS/i


/ 06.2014
Izvor Napajanja
Koncept i Inovacije

4 Fronius International GmbH / Perfect Welding , Team Training / APP034 TPS/i / 06.2014
KONFIGURACIJA – KOMPAKTNI IZVOR NAPAJANJA

Gorionik
TPS 320i C

Hladnjak CU 1100i

Kolica TU CAR 4

Fronius International GmbH / Perfect Welding , Team Training / APP034 TPS/i


/ 06.2014
KONFIGURACIJA – DVOKOMPONENTNI SUSTAV

Dodavač žice WF 25i

Gorionik & Šlauf paket

TPS 500i

Hladnjak CU 1400i PRO /MC

Kolica 5000

Fronius International GmbH / Perfect Welding , Team Training / APP034 TPS/i


/ 06.2014
INOVACIJE

FSC

7“ Displey na dodir

Priključak hladnjaka

SpeedNet

24V EC Pumpa

Provodna matica za
bužire
Novi priključak za
masu
MultiLock
7

Fronius International GmbH / Perfect Welding , Team Training / APP034 TPS/i


/ 06.2014
MATRICA POVEZIVANJA
Ethernet

SpeedNet

SpeedNet (u FSC-u)
RS 485 (LocalNet)

SpeedNet

2-Wire Bus

Fronius International GmbH / Perfect Welding / TPS/i


Dodavač Žice

9 Fronius International GmbH / Perfect Welding , Team Training / APP034 TPS/i / 06.2014
Inačice dodavača žice
/ WF15i
/ WF15i n.S. (no Spool)
/ 42V AC Motor
/ Vodom hlađen pogon

/ WF25i
/ 42V DC Motor
/ Zrakom hlađen pogon

/ WF30i
/ 42V AC Motor
/ Vodom hlađen pogon

/ WF25i Case D200 or Case D300

10 Fronius International GmbH / Perfect Welding , Team Training / APP034 TPS/i / 06.2014
Dodavač žice – dodatna oprema

I-kit Kranski-transport VR 5000


/ 4,100,660
/ 4,100,660,U

I-kit Aluminijski bočni klizač VR 5000


/ 4,100,671
/ 4,100,671,U

I-kit mjerač protoka plina VR 5000


/ 4,100,672
/ 4,100,672,U

Kolica Trabant VR 5000


/ 4,077,004 (2 Upravljiva kotača)
/ 4,077,008 (4 Upravljiva kotača)
11
Nosač pogona & Pogonski kotači
/ Aluminijski nosač pogona
/ Samo-otvarajući pritiskajući mehanizam
/ Jedna ručica za podešavanje pritiska
/ Pogonski kotači u boji za različite promjere žice

/ U-žljeb sa 4 kontaktne točke


/ Otporan na trošenje – HRC 60
/ Kuglični ležaj

12 Fronius International GmbH / Perfect Welding , Team Training / APP034 TPS/i / 06.2014
Hladnjak

13 Fronius International GmbH / Perfect Welding , Team Training / APP034 TPS/i / 06.2014
Inačice hladnjaka
/ CU 1100i
/ CU 1100i / 460V US Market
/ CU 1100i / MV
/ CU 1100i Basic no control
/ CU 1100i Basic / 460V no control / US Market
/ CU 1400i Pro
/ CU 1400i Pro / MC Flow-Thermo+Level Sensor
/ CU 800i
/ CU 800i Basic (no control)
/ CU 800i Basic / 460V (no control / US Market)
/ CU 800i / 460V (US Market)
14 Fronius International GmbH / Perfect Welding , Team Training / APP034 TPS/i / 06.2014
Cooling Units CU1100i – CU1400i Pro MC

1100 … Performanse hlađenja [W]


1400 … Performanse hlađenja [W]
CU ...... CoolingUnit
i .......... Intelligent Revolution Za tipove:
TPS 320i, TPS 400i & TPS 500i
Basic .. Bez prekida – Kontinuiran rad TPS 320i C
Pro .... Professional (EC Pumpe)
za više-stupanjski rad
MV .... Multivoltage 200-230V i 400 – 480V
460V … za 460V mains (USA)
MC .... MultiControl (Praćenje Protoka, Temperature
i razine)

15 Fronius International GmbH / Perfect Welding , Team Training / APP034 TPS/i / 06.2014
Inovacija: Konektor hladnjaka

/ Brzo i jednostavno spajanje hladnjaka


/ Ukopčaj i upali

16 Fronius International GmbH / Perfect Welding , Team Training / APP034 TPS/i / 06.2014
Upravljanje

17 Fronius International GmbH / Perfect Welding , Team Training / APP034 TPS/i / 06.2014
Korisničko sučelje
/ 7“ Touch-Display
/ Trenutne vrijednosti
/ Odabir parametara zavarivanja
/ USB ulaz
/ Update
/ Backup/Restore
/ Otključavanje novih opcija

/ Potenciometar
/ Upravljanje Karuselom
/ Pritiskom se odabire prikazani prozor
/ Promjena parametara - rotiranjem
/ Pritiskom se potvrđuju odabrani
parametri
/ Gumb za izlazak Žice i Plina

18 Fronius International GmbH / Perfect Welding , Team Training / APP034 TPS/i / 06.2014
Područja
Status ploča

Lijeva Desna bočna


bočna traka traka

Glavni Menu sa karuselom

19 Fronius International GmbH / Perfect Welding , Team Training / APP034 TPS/i / 06.2014
Svojstva u
zavarivanju

20 Fronius International GmbH / Perfect Welding , Team Training / APP034 TPS/i / 06.2014
OSJETI RAZLIKU – NOVI PROCESI
LSC – Low Spatter Control
STANDARD / Nova “stabilizator penetracije” funkcija
koristi se za luk u spreju kada se mijenja visina žice;
funkcija može biti uključena ili isključena
/ Uobičajena Fronius kvaliteta za
kratkospojeni i luk u spreju / LSC root karakteristika:
Visoki tlak luka za bolje formiranje korijena u
/ Optimalan za većinu materijala i mješavina
prinudnim položajima
plinova
/ LSC universal karakteristika:
Kontrola prekida kratkog spoja sa lakšim
uspostavljanjem luka i brzom regulacijom

PULSE PMC – Pulse Multi Control


/ Općepoznata kvaliteta Fronius / Povećana stabilnost procesa
impulsa / Optimirana karakteristika impulsa i poboljšano
/ Optimalan za većinu materijala i paljenje luka
mješavina plinova / Veća stabilnost sa manjim unosom energije (brzina
zavarivanja i visina luka)
/ Stabilizator penetracije za ravnomjernije mješanje
materijala

21 Fronius International GmbH / Intelligent Revolution / 20.08.3013


LSC KRATAK OPIS

/ LSC znači Low Spatter Control


/ LSC je napravljen za luk kratkog spoja koji oblikovan tako da:
minimalizira prskotine
poveća stabilnost luka
poveća kvalitetu spoja
smanji vrijeme obuke zavarivača
poveća iznos depozita
zadrži konstantnu penetraciju

22
Fronius International GmbH / Martin Willinger / Fundamentals of the LSC Process / May 2014 - v02
OSNOVE LUKA KRATKOG SPOJA

/ Svojstva luka kratkog spoja: manja kontrola i više prskotina.

23
Fronius International GmbH / Martin Willinger / Fundamentals of the LSC Process / May 2014 - v02
OSNOVE LSC UNIVERSAL (Adv.)

Preklopni spoj Kutni spoj Popuna & Završni prolaz

/ Jednolilčna karakteristika luka / Visoka stabilnost luka / Velika količina depozita


/ Minimum prskotina / Manje prskotina / Odlična penetracija zahvaljujući
/ Izvrsno kvašenje / Velika količina depozita stabilizatoru penetracije
24
Fronius International GmbH / Martin Willinger / Fundamentals of the LSC Process / May 2014 - v02
USPOREDBA LSC VS LUK KRATKOG SPOJA

25
Fronius International GmbH / Martin Willinger / Fundamentals of the LSC Process / May 2014 - v02
OSNOVE LSC ROOT (Adv.)

/ Root LSC (and LSC Adv.): lako upravljanje luka, velike sile odvajanja, odlično ojačanje korijena, minimum prskotina.

26
Fronius International GmbH / Martin Willinger / Fundamentals of the LSC Process / May 2014 - v02
OSNOVE LSC ROOT (Adv.)

1. Korak
/ Glavna struja formira kapljicu
/ Kraj žice se topi i oblikuje veliku
kapljicu.

2. Korak
/ Velika kapljica dodiruje talinu čime
premošćuje udaljenost do taline
/ Jačina struje se smanjuje na
minimum kako bi se izbjegle
prskotine i vrtloženje luka.

27
Fronius International GmbH / Martin Willinger / Fundamentals of the LSC Process / May 2014 - v02
OSNOVE LSC ROOT (Adv.)

3. Korak
/ Struja raste do odvajanja kapljice.

4. Korak
/ Prijenos kapljice se odvija pri najmanjoj
struji.
/ Udaljenost od žice do taline svladana.
/ Manjom strujom izbjegnuto progaranje i
ulazak žice u talinu.
28
Fronius International GmbH / Martin Willinger / Fundamentals of the LSC Process / May 2014 - v02
OSNOVE LSC ROOT (Adv.)

5. Korak
/ Struja se penje na najvišu vrijednost i
potiskuje talinu.
/ Rezultat je odlično ojačanje korijena

29
Fronius International GmbH / Martin Willinger / Fundamentals of the LSC Process / May 2014 - v02
USPOREDBA LSC VS LUK KRATKOG SPOJA

/ wfs: 6m/min (235ipm) / wfs: 6m/min (235ipm)


/ I: 140 amps / I: 128 amps
/ U: 18,6 V / U: 18,2 V
/ Čelik 5mm (1/5”) / Čelik 5mm (1/5”)

30
Fronius International GmbH / Martin Willinger / Fundamentals of the LSC Process / May 2014 - v02
PRIMJENE LSC (ADV.) UNIVERSAL

IndustriJE
/ Namještaj
/ Cijevi
/ Automobilska industrija

Vrste zavarenih spojeva


/ Kutni
/ Preklopni
/ Sučeoni PA (1G)
/ Rubni

31
Fronius International GmbH / Martin Willinger / Fundamentals of the LSC Process / May 2014 - v02
APPLICATIONS FOR LSC (ADV.) BRAZE

Outside Corner Braze Joint Butt Braze Joint Lap Braze Joint

1mm 1mm 1mm

/ Filler alloy: CuSi3 (ER CuSi-A) / Filler alloy: CuSi3 (ER CuSi-A) / Filler alloy: CuSi3 (ER CuSi-A)
/ Wire diameter: 1,0mm (0.040”) / Wire diameter: 1,0mm (0.040”) / Wire diameter: 1,0mm (0.040”)
/ Shielding gas: Argon 4.6 / Shielding gas: Argon 4.6 / Shielding gas: Argon 4.6
/ wfs: 3,6m/min / wfs: 3,6m/min (140 ipm) / wfs: 6,0m/min (235 ipm)
/ I: 70 Amp. / I: 72 Amp. / I: 120 Amp.
/ U: 13 Volt / U: 12,8 Volt / U: 13,5 Volt
/ Zinc thickness: 4-5µm / Zinc thickness: 4-5µm / Zinc thickness: 4-5µm
/ Electro galvanized / Electro galvanized / Electro galvanized

32
Fronius International GmbH / Martin Willinger / Fundamentals of the LSC Process / May 2014 - v02
KONTRTOLA DINAMIKE U OJAČANJU KORIJENA

Postavka Dynamic u minus Postavka Dynamic na 0 Postavka Dynamic u plus

/ Povećan tlak luka / Srednji tlak luka / Manji tlak luka


/ Veće ojačanje korijena / Za korijen na cijevima / Za poziciju PA (1G)
/ Pogodan za uske zazore / Pozicije PA (1G) do 2h / Dobar efekt kvašenja
/ Vertikalno dole i nadglavno / Dobar efekt kvašenja

33
Fronius International GmbH / Martin Willinger / Fundamentals of the LSC Process / May 2014 - v02
KORIJENI PROLAZ U USPOREDBI VERTIKALNO GORE I
VERTIKALNO DOLJE
Stick (MMA) (rutil/E6013) TIG (GTAW) Short Arc Vertical Down Short Arc Vertical Up LSC Adv. Vertical Down

/ U:22,82V / I:83,44 / U:9,3V / I:123 / U:16,65 / I:140,7 / U:15,68 / I:101,7 / U:14,69 / I:145,8
/ Vs: 9cm/min / Vs: 5,5cm/min / Vs:25cm/min / Vs: 12cm/min / Vs: 25cm/min
/ E: 1,26kJ/mm / E: 1,24kJ/mm / E: 0,55kJ/mm / E: 0,80kJ/mm / E: 0,51kJ/mm
/ wfs: 3,6m/min / wfs: 2,5m/min / wfs: 3,6m/min

/ Position: gore / Position: gore / Position: Dolje / Position: gore / Position: dolje
/ Electrode Ø: 2,5mm / Filler Ø: 2,0mm / Wire Ø: 1,2mm / Wire Ø: 1,2mm / Wire Ø: 1,2mm
/ Gas: Argon / Gas: Ar+ 18%CO2 / Gas: Ar+ 18%CO2 / Gas: Ar+ 18%CO2
/ Gas flow: 10l/min / Gas flow: 12l/min / Gas flow: 12l/min / Gas flow: 10l/min

34
Fronius International GmbH / Martin Willinger / Fundamentals of the LSC Process / May 2014 - v02
USPOREDBA PROCESA
Stick LSC TIG LSC
Heat input (kJ/mm) 1,26 0,51 59% decrease + Heat input (kJ/mm) 1,24 0,51 59% decrease +
Vs (cm/min) 9 25 2,7 times faster + Vs (cm/min) 5,5 25 4,5 times faster +
Deposition rate (kg/h) 1,9 + Deposition rate (kg/h) 1,9 +
Gas consumption (l/m) 40 - Gas consumption (l/m) 181 40 78% less +
Slag removal Yes No + Slag removal No No =
Electrode changeover Often Rare + Electrode changeover Often Rare +
Penetration perfect perfect = Penetration perfect perfect =
Root reinforcement Yes Yes = Root reinforcement Yes Yes =
Operation / handling Difficult Easy + Operation / handling Difficult Easy +

Short arc vertical down LSC Short arc vertical up LSC


Heat input (kJ/mm) 0,55 0,51 = Heat input (kJ/mm) 0,80 0,51 37% less +
Vs (cm/min) 25 25 = Vs (cm/min) 12 25 2 times faster +
Deposition rate (kg/h) 1,9 1,9 = Deposition rate (kg/h) 1,3 1,9 46% more +
Gas consumption (l/m) 48 40 17% less + Gas consumption (l/m) 100 40 60% less +
Slag removal No No = Slag removal No No =
Electrode changeover Rare Rare = Electrode changeover Rare Rare =
Penetration Lack of fusing perfect + Penetration Good perfect +
Root reinforcement No Yes + Root reinforcement Minimum to 0 Yes +
Operation / handling Difficult Easy + Operation / handling Difficult Easy +
35
Fronius International GmbH / Martin Willinger / Fundamentals of the LSC Process / May 2014 - v02
USPOREDBA PROCESA

36
Fronius International GmbH / Martin Willinger / Fundamentals of the LSC Process / May 2014 - v02
USPOREDBA PROCESA

37
Fronius International GmbH / Martin Willinger / Fundamentals of the LSC Process / May 2014 - v02
EXAMPLE PLATFORMS:

38
Fronius International GmbH / Martin Willinger / Fundamentals of the LSC Process / May 2014 - v02
OFFSHORE PEDESTAL CURRENT OPERATION

Pipe manual root pass joint Outside Stick Root Pass Inside Stick “wash out” pass

/Lorem ipsumare
Pipe joints dolor situp
lined amet, consec root
for manual / Outside root pass done with Stick. /Lorem
The inside
ipsumpass
doloris sit
necessary
amet, consec
to wash
tetuer
pass adipiscing
welding. elit. Aenean commodo / Long grinding time tetuer
out the
adipiscing
root passelit.
to Aenean
avoid lack
commodo
of fusion.
/ligula
Fill &eget
Capdolor. /ligula eget dolor.
Necessary for X-ray quality
passes are done with / Low deposition rate
Submerged Arc Welding Process /Aenean
Low duty cycle Cum sociis natoque
Aenean massa. Cum sociis natoque / High H2 content massa.
pena tibus etmagnis dis parturient /pena
Low tibus etmagnis
deposition rate dis parturient
/ Slag removal
montes, nasc etur ridiculus mus. Donec montes, nasc etur ridiculus mus. Donec
quam felis, ultricies nec, pellentesque eu, / More training time /quam
Slag felis,
removal necessary
ultricies nec, pellentesque eu,
pretium quis, sem. /pretium
Long grinding
quis, sem.time

39
Fronius International GmbH / Martin Willinger / Fundamentals of the LSC Process / May 2014 - v02
OFFSHORE PEDESTAL SOLUTION

Pipe manual root pass joint Outside LSC Root Pass No “wash out” pass necessary

/Lorem ipsumare
Pipe joints dolor situp
lined amet, consec root
for manual / Outside root pass done with TPS320i /Lorem
Theinside
No inside
ipsum
wash
pass
dolor
out
is sit
necessary
pass
amet,
necessary.
consec
to wash
tetuer
pass adipiscing
welding. elit. Aenean commodo LSC /tetuer
out the
adipiscing
root passelit.
No undercuts to Aenean
avoid lack
commodo
of fusion.
/ligula
Fill &eget
Capdolor. /ligula
/ Short grinding time High eget
Necessary dolor.
qualityfor
weld.
X-ray quality
passes are done with
Submerged Arc Welding Process / High deposition rate /Aenean
Low duty cycle Cum sociis natoque
Aenean massa. Cum sociis natoque massa.
pena tibus etmagnis dis parturient / Low H2 content /pena
Low tibus etmagnis
deposition rate dis parturient
montes, nasc etur ridiculus mus. Donec montes, nasc etur ridiculus mus. Donec
/ No slag removal /quam
Slag felis,
removal necessary
quam felis, ultricies nec, pellentesque eu, ultricies nec, pellentesque eu,
pretium quis, sem. / Less training time /pretium
Long grinding
quis, sem.time

40
Fronius International GmbH / Martin Willinger / Fundamentals of the LSC Process / May 2014 - v02
SKLONOST NASTANKU H2 PUKOTINA
45
ml of diffusible H2 per 100g of deposited weld metal

40

35

30

25

20 maximum allowance of H2
15

10
Hydrogen level of different welding processes
5
/ Cellulose Electrodes (e.g. E6010): 40-60 ml/100g weld metal
0 / Rutil Electrodes (e.g. E6013): 10-15 ml/100g weld metal
X60 X80 X100 X120 / Flux cored wire: 5-20ml/100g weld metal
Pipe steel grade
/ TIG: less than 4ml/100g weld metal
/ MAG (e.g. LSC) less than 4ml/100g weld metal

41
Fronius International GmbH / Martin Willinger / Fundamentals of the LSC Process / May 2014 - v02
LSC ROOT VS. CELULOZNA ELEKTRODA

Solid Wire Ø 1,2mm (0.045”) Cellulose Electrode Ø 3,25mm (E6010)

/ Parameters: / Parameters:
wfs: 3,6 m/min I: ~ 82 Amp.
I: ~ 130 Amp. U: ~ 32 V
U: ~ 16,5 V Dyn: 50
Dyn: - 5.0 Travel Speed: ~ 17 cm/min
Travel Speed: ~ 17 cm/min E: ~ 0,9 kJ/mm
E: ~ 0,75 kJ/mm
/ Minimum prskotina / Više prskotina
/ Nema troske / Troska
/ Manje brušenja / Visok sadržaj vodika

42
Fronius International GmbH / Martin Willinger / Fundamentals of the LSC Process / May 2014 - v02
PRIMJENE LSC ROOT (ADV.)

Industries
/ Pipe Industry
/ Pipeline
/ Boiler & Pressure vessels
/ Steel construction

/ Open root welding


/ Mild Steel
/ Fine grain steel
/ Stainless steel

43
Fronius International GmbH / Martin Willinger / Fundamentals of the LSC Process / May 2014 - v02
UTJECAJ INDUKTIVITETA
/ Nepravilno postavljanje kabela

/ Pravilno postavljanje kabela

Magnetska polja se poništavaju

44
Fronius International GmbH / Martin Willinger / Fundamentals of the LSC Process / May 2014 - v02
UTJECAJ INDUKTIVITETA

Proces Induktivitet Stabilnost luka


LSC Nizak odlična
LSC Visok dobra
LSC Vrlo visok prskotine
LSC Adv. Nizak i vrlo visok odlična

/ Postavljanje kabela direktno utječe na induktivitet

45
Fronius International GmbH / Martin Willinger / Fundamentals of the LSC Process / May 2014 - v02
Usporedba konfiguracija zračno hlađenje opcije - LSC / LSC
Advanced CE

/ Konfiguracija LSC CE / Konfiguracija LSC Advance CE


Part Number Description Quantity Part Number Description Quantity
4,075,174 TPS 400i 400V /CE 1 4,075,175 TPS 400i LSC ADV 400V /CE 1
4,066,014 WP LSC 4,077,002 Carriage PickUp 5000 1
4,077,002 Carriage PickUp 5000 1 4,100,613 I-kit turning pintle mounting VR 5000 1
4,100,613 I-kit turning pintle mounting VR 5000 1 4,049,031 WF 25i/4R/G/FSC 1
4,049,031 WF 25i/4R/G/FSC 1 44,0001,1407 Feeder roll U1,2mm (0.045”) 4
44,0001,1407 Feeder roll U1,2mm (0.045”) 4 4,047,834 HP 95i CON/G/1,2m 1
4,047,834 HP 95i CON/G/1,2m 1 43,0004,0581 Ground cable 95mm² 4m 1
43,0004,0581 Ground cable 95mm² 4m 1 4,035,932 MTG 320i/FSC/JM/4,5m/45°/LED 1
4,035,932 MTG 320i/FSC/JM/4,5m/45°/LED 1 44,0350,5120 BK Fe Ø1,2/G/W/5m 1
44,0350,5120 BK Fe Ø1,2/G/W/5m 1 42,700,001 Service PAT Inverter 1
42,700,001 Service PAT Inverter 1

46
Fronius International GmbH / Martin Willinger / Fundamentals of the LSC Process / May 2014 - v02
Configuration Comparisons Air Cooled - LSC / LSC Advanced
CE/UL/CSA Version 400-460V

/ LSC Configuration 400-460V / LSC Advanced Configuration 400-460V


Part Number Description Quantity Part Number Description Quantity
4,075,174,800 TPS 400i /nc 400-460V 1 4,075,175,800 TPS 400i LSC ADV /nc 400-460V 1
4,066,014 WP LSC 4,077,002 Carriage PickUp 5000 1
4,077,002 Carriage PickUp 5000 1 4,100,613 I-kit turning pintle mounting VR 5000 1
4,100,613 I-kit turning pintle mounting VR 5000 1 4,049,031 WF 25i/4R/G/FSC 1
4,049,031 WF 25i/4R/G/FSC 1 44,0001,1407 Feeder roll U1,2mm (0.045”) 4
44,0001,1407 Feeder roll U1,2mm (0.045”) 4 4,047,834 HP 95i CON/G/1,2m 1
4,047,834 HP 95i CON/G/1,2m 1 43,0004,0581 Ground cable 95mm² 4m 1
43,0004,0581 Ground cable 95mm² 4m 1 4,035,932 MTG 320i/FSC/JM/4,5m/45°/LED 1
4,035,932 MTG 320i/FSC/JM/4,5m/45°/LED 1 44,0350,5120 BK Fe Ø1,2/G/W/5m 1
44,0350,5120 BK Fe Ø1,2/G/W/5m 1 42,700,001 Service PAT Inverter 1
42,700,001 Service PAT Inverter 1

47
Fronius International GmbH / Martin Willinger / Fundamentals of the LSC Process / May 2014 - v02
Configuration Comparisons Air Cooled - LSC / LSC Advanced
CE/UL/CSA Version Multivoltage (200-460V)

/ LSC Configuration MV / LSC Advanced Configuration MV


Part Number Description Quantity Part Number Description Quantity
4,075,174,830 TPS 400i /MV/nc 1 4,075,175,830 TPS 400i LSC ADV /MV/nc 1
4,066,014 WP LSC 4,077,002 Carriage PickUp 5000 1
4,077,002 Carriage PickUp 5000 1 4,100,613 I-kit turning pintle mounting VR 5000 1
4,100,613 I-kit turning pintle mounting VR 5000 1 4,049,031 WF 25i/4R/G/FSC 1
4,049,031 WF 25i/4R/G/FSC 1 44,0001,1407 Feeder roll U1,2mm (0.045”) 4
44,0001,1407 Feeder roll U1,2mm (0.045”) 4 4,047,834 HP 95i CON/G/1,2m 1
4,047,834 HP 95i CON/G/1,2m 1 43,0004,0581 Ground cable 95mm² 4m 1
43,0004,0581 Ground cable 95mm² 4m 1 4,035,932 MTG 320i/FSC/JM/4,5m/45°/LED 1
4,035,932 MTG 320i/FSC/JM/4,5m/45°/LED 1 44,0350,5120 BK Fe Ø1,2/G/W/5m 1
44,0350,5120 BK Fe Ø1,2/G/W/5m 1 42,700,001 Service PAT Inverter 1
42,700,001 Service PAT Inverter 1

48
Fronius International GmbH / Martin Willinger / Fundamentals of the LSC Process / May 2014 - v02
Configuration Comparisons Air Cooled - LSC / LSC Advanced
UL/CSA Version 600V

/ LSC Configuration 600V / LSC Advanced Configuration 600V


Part Number Description Quantity Part Number Description Quantity
4,075,174,800 TPS 400i /600V/nc 1 4,075,175,970 TPS 400i LSC ADV /600V/nc 1
4,066,014 WP LSC 4,077,002 Carriage PickUp 5000 1
4,077,002 Carriage PickUp 5000 1 4,100,613 I-kit turning pintle mounting VR 5000 1
4,100,613 I-kit turning pintle mounting VR 5000 1 4,049,031 WF 25i/4R/G/FSC 1
4,049,031 WF 25i/4R/G/FSC 1 44,0001,1407 Feeder roll U1,2mm (0.045”) 4
44,0001,1407 Feeder roll U1,2mm (0.045”) 4 4,047,834 HP 95i CON/G/1,2m 1
4,047,834 HP 95i CON/G/1,2m 1 43,0004,0581 Ground cable 95mm² 4m 1
43,0004,0581 Ground cable 95mm² 4m 1 4,035,932 MTG 320i/FSC/JM/4,5m/45°/LED 1
4,035,932 MTG 320i/FSC/JM/4,5m/45°/LED 1 44,0350,5120 BK Fe Ø1,2/G/W/5m 1
44,0350,5120 BK Fe Ø1,2/G/W/5m 1 42,700,001 Service PAT Inverter 1
42,700,001 Service PAT Inverter 1

49
Fronius International GmbH / Martin Willinger / Fundamentals of the LSC Process / May 2014 - v02
OSNOVE PMC PROCESA
PMC - PULSE MULTI CONTROL - PREGLED
Jednolična Penetracija
Više opcija za fino podešavanje parametara
Stabilizator penetracije održava penetraciju
Parametri početka i kraja zavarivanja se mogu još preciznije konstantnom i uz promjenu udaljenosti dizne od
ugađati. metalne kupke. Od pomoći pri zavarivanju uskih i
nepristupačnih žljebova.

Povećana Stabilnost Luka


Zahvaljujući Speed Net komunikaciji i postignutoj Visokoj stabilnosti luka
omogućene su veće brzine zavarivanja s minimum do 0 greški u zavaru.
VELIKA STABILNOST LUKA = VISOKE PERFORMANSE ZAVARIVANJA

Univerzalna primjena
PMC se može koristiti sa različitim dodatnim Jednostavno postavljanje
materijalima, npr. Nisko i Visoko legirani
čelici, Aluminij i njegove legure, itd. Također, Parametri kao što je Stabilnost luka
primjena je ista za razne promjere žica i pomažu zavarivačima u postavljanju
smjese plinova. parametara kojima će dobiti savršen
zavar pri svakom prolazu.

51
Fronius International GmbH / first name last name / Titel of presentation / xx.xx.20xx - v02
STABILIZATOR PENETRACIJE U POZICIJI VERTIKALNO PREMA GORE

Stabilizator penetracije na OFF Stabilizator penetracije na ON


/ Nejednolika penetracija / Jednolika penetration

A B A A B A
Position A (short CTWD) Position B (long CTWD) Position A (short CTWD) Position B (long CTWD)
wfs = = wfs ↓ ↑
Amp. ↑ ↓ Amp. = =
Volts = = Volts ↓ ↑
Penetration ↑ ↓ Penetration = =

52
Fronius International GmbH / Martin Willinger / Fundamentals of the LSC Process / May 2014 - v02
OPIS: STABILIZATOR PENETRACIJE “OFF”
/ A change in the contact tube distance (CTWD) causes a
current change in characteristic lines with constant voltage
characteristics (CV)
/ The penetration depth is mainly determined by the welding
current
/ Example: Macro: “P-Stab” = Off / 0 m/min
Pos.2: CTWD = 20mm Pos 1.: CTWD = 10mm
vd = 21 m/min vd = 21 m/min
Penetration = 3.4mm Penetration = 4.2 mm

2 1

PGM2851 / „Steel dynamic PMC“ / G3Si1 ø1,0mm / 82% Ar 18%CO2 / CTWD 10mm bis 20mm / Schweißgeschw. 100cm/min
53
Constant WFS 11,9m/min  Welding current variable

54
PRINCIPLE: PENETRATION STABILIZER “ON”
/ When changing the contact tube distance (CTWD) a
constant current behavior (CC) can only be obtained by
a wire feed adjustment
/ The maximum feed change is determined by the setting
of the Penetration Stabilizer
/ Example: Macro: “P-Stab” = 5 m/min
Pos.2: CTWD = 20mm Pos 1.: CTWD = 10mm
vd = 23 m/min vd = 18 m/min
Penetration = 3.9mm Penetration = 4.1 mm

2 1
2 1

PGM2851 / „Steel dynamic PMC“ / G3Si1 ø1,0mm / 82% Ar 18%CO2 / CTWD 10mm bis 20mm / Schweißgeschw.100cm/min
55
Constant Current 320A  WFS variable

56
COMPARISON: 10mm FILLET WELD VERTICAL UP
(PF/3Fu) a7 / Z3/8”
Conventional MAG FCAW LSC + Penetration stabilizer LSC + Penetration stabilizer

/ Wire size: 1,2mm (0.045”) / Wire size: 1,2mm (0.045“) / Wire size: 1,2mm (0.045”) / Wire size: 1,0mm (0.040”)
/ Filler metal: / Filler metal: / Filler metal: / Filler metal:
G3Si1 (ER70S-6) E81T-Ni (rutil) G3Si1 (ER70S-6) G3Si1 (ER70S-6)
/ U:18,4 / I:183 / U:22,7 / I:152 / U:18 / I:171 / U:19,8 / I:154
/ vs: 10cm/min / vs: 10cm/min / vs: 10cm/min / vs: 10cm/min
/ E: 2,02 kJ/mm / E: 2,07 kJ/mm / E: 1,84 kJ/mm / E: 1,77 kJ/mm
/ wfs: 5,2m/min (205ipm) / wfs: 8m/min (315ipm) / wfs: 5,2m/min (205ipm) / wfs: 7,5m/min (295ipm)
/ Gas: Ar+18%CO2 / Gas: Ar+18%CO2 / Gas: Ar+18%CO2 / Gas: Ar+18%CO2
/ Gas flow: 12l/min / Gas flow: 15l/min / Gas flow: 10l/min / Gas flow: 10l/min

57
Fronius International GmbH / Martin Willinger / Fundamentals of the LSC Process / May 2014 - v02
PRINCIPLE PULSED ARC

I/U

Arc length changes can appear during welding due to surface variations, increased travel speed

58
Fronius International GmbH / Martin Willinger / Fundamentals of the PMC Process Sales Meeting NA 2014 / Aug. 2014 - v01
PRINCIPLE PMC ARC + ARC LENGTH STABILIZER

I/U

PMC adds dedicated short circuits to increase travel speed, penetration and arc stability.

59
Fronius International GmbH / Martin Willinger / Fundamentals of the PMC Process Sales Meeting NA 2014 / Aug. 2014 - v01
ARC LENGTH STABILIZER

/ Regardless of the welding position, the weld geometry or interference, the properties of the
controlled, faulted arc remain the same

AL-Stab = 0 AL-Stab = 0.5 AL-Stab = 2

60
PULSE VS PMC USING ARC LENGTH STABILIZER

61
Fronius International GmbH / Martin Willinger / Fundamentals of the PMC Process Sales Meeting NA 2014 / Aug. 2014 - v01
EXAMPLE: ARC LENGTH – STABILIZER
/ Adjusted process characteristics are maintained
Optimized for butt-weld Arc changed by changing weld
AL-corr. = -3 joint
AL-stab = 0 AL-corr. = -3
AL-stab = 0

Initial set:
AL-Corr. = 0
AL-Stab = 0

Result using Stabilizer Result using Stabilizer


AL-corr. = 0 AL-corr. = 0
AL-Stab = 0.5 AL-Stab = 0.5

62
ARC LENGTH STABILIZER SETTINGS

Arc length stabilizer set to 0.0 Arc length stabilizer set to 0.5 Arc length stabilizer set to 2.0

/ No dedicated short circuits / Low amount of dedicated short circuits / Large amount of dedicated short
/ Good arc stability / Increased arc stability circuits
/ Low travel speed / Increased travel speed / Increased arc stability
/ Applications: / Applications: / High travel speeds
- Cap passes - Root and fill passes / Applications:
- 1F / PA position - Fillet welds - Lap joints
- …….. - Out of position welds - Vertical down welds
- ……. - ……..

63
Fronius International GmbH / first name last name / Titel of presentation / xx.xx.20xx - v02
COMBINATION: “AL-STAB” + “PENETRATION-STABILIZER”
/ Constant short arc + a constant Penetration
/ Stabilizes the welding process when disturbances occur, the
welding seam position or shape or the contact tube distance
changes
/ Example: Macro: G3Si1 ø1.0mm, 18% CO2 Rest Ar
P-Stab = 5m/min, AL-Stab = 0.5
Pos.2: CTWD = 10mm Pos 1.: CTWD = 10 mm
vd = 23 m/min vd = 18 m/min
Penetration = 4.2mm Penetration = 4.2 mm

2 1

PGM2851 / „Steel dynamic PMC“ / G3Si1 ø1,0mm / 82% Ar 18%CO2 / CTWD 10mm bis 20mm / Schweißgeschw. 100cm/min
64
PROCESS COMPARISON 10MM SAND BLASTED STEEL

Pulse PMC Universal PMC PCS

5mm 5mm 5mm

/ Synergic line: 2785 / Synergic line: 2850 / Synergic line: 2890


/ Wfs: 11m/min (435ipm) / Wfs: 11m/min (435ipm) / Wfs: 11m/min (435ipm)
/ I (rms): 345,7 Amp. / I (rms): 329,5 Amp. / I (rms): 321,2 Amp.
/ U (rms): 29,25 Volt / U (rms): 25,42 Volt / U (rms): 24,71 Volt
/ vs: 50cm/min (20ipm) / vs: 50cm/min (20ipm) / vs: 50cm/min (20ipm)
/ Real Energy: 1,152 kJ/mm / Real Energy: 0,924 kJ/mm / Real Energy: 0,924 kJ/mm
/ Arc length stabilizer. 1.0 / Arc length stabilizer: 1.0

65
Fronius International GmbH / Martin Willinger / Fundamentals of the PMC Process Sales Meeting NA 2014 / Aug. 2014 - v01
PROCESS COMPARISON 10MM SAND BLASTED STEEL

Std. universal Std. Dynamic LSC Univ.

5mm 5mm 5mm

/ Synergic line: 2566 / Synergic line: 2630 / Synergic line: 2765


/ Wfs: 11m/min (435ipm) / Wfs: 11m/min (435ipm) / Wfs: 11m/min (435ipm)
/ I (rms): 353,7 Amp. / I (rms): 345,5 Amp. / I (rms): 348,6 Amp.
/ U (rms): 29,23 Volt / U (rms): 28,42 Volt / U (rms): 28,35 Volt
/ vs: 50cm/min (20ipm) / vs: 50cm/min (20ipm) / vs: 50cm/min (20ipm)
/ Real Energy: 1,176 kJ/mm / Real Energy: 1,128 kJ/mm / Real Energy: 1,140 kJ/mm

66
Fronius International GmbH / Martin Willinger / Fundamentals of the PMC Process Sales Meeting NA 2014 / Aug. 2014 - v01
PROCESS COMPARISON 8MM SAND BLASTED STEEL

Pulse PMC Universal PMC PCS

5mm 5mm 5mm

/ Synergic line: 2785 / Synergic line: 2850 / Synergic line: 2890


/ Wfs: 12,2m/min (480ipm) / Wfs: 12,2m/min (480ipm) / Wfs: 12,2m/min (480ipm)
/ I (rms): 365,1 Amp. / I (rms): 341,3 Amp. / I (rms): 346,2 Amp.
/ U (rms): 30,45 Volt / U (rms): 27,37 Volt / U (rms): 28,72 Volt
/ vs: 65cm/min (20ipm) / vs: 65cm/min (20ipm) / vs: 65cm/min (20ipm)
/ Real Energy: 1,049 kJ/mm / Real Energy: 0,860 kJ/mm / Real Energy: 0,967 kJ/mm
/ Arc length stabilizer. 0.3 / Arc length stabilizer: 0.3

67
Fronius International GmbH / first name last name / Titel of presentation / xx.xx.20xx - v02
PROCESS COMPARISON 8MM SAND BLASTED STEEL

Std. Universal Std. Dynamic LSC Univ.

5mm 5mm 5mm

/ Synergic line: 2566 / Synergic line: 2630 / Synergic line: 2765


/ Wfs: 12,2m/min (480ipm) / Wfs: 12,2m/min (480ipm) / Wfs: 12,2m/min (480ipm)
/ I (rms): 310 Amp. / I (rms): 359,9 Amp. / I (rms): 299,8 Amp.
/ U (rms): 27,55 Volt / U (rms): 29,46 Volt / U (rms): 26,37 Volt
/ vs: 65cm/min (20ipm) / vs: 65cm/min (20ipm) / vs: 65cm/min (20ipm)
/ Real Energy: 1,000 kJ/mm / Real Energy: 1,040 kJ/mm / Real Energy: 1,096 kJ/mm

68
Fronius International GmbH / first name last name / Titel of presentation / xx.xx.20xx - v02
PROCESS COMPARISON 5MM HOT ROLLED STEEL

Pulse PMC Universal PMC PCS

5mm 5mm 5mm

/ Synergic line: 2785 / Synergic line: 2850 / Synergic line: 2890


/ wfs: 9,4m/min (370ipm) / wfs: 9,4m/min (370ipm) / wfs: 9,4m/min (370ipm)
/ I (rms): 259,2 Amp. / I (rms): 254,9 Amp. / I (rms): 302,2 Amp.
/ U (rms): 28,75 Volt / U (rms): 25,66 Volt / U (rms): 26,54 Volt
/ vs: 55cm/min (21.5ipm) / vs: 55cm/min (21.5ipm) / vs: 55cm/min (21.5ipm)
/ Real Energy: 1,014 kJ/mm / Real Energy: 0,796 kJ/mm / Real Energy: 0,861 kJ/mm
/ Arc length stabilizer. 0.3 / Arc length stabilizer: 0.3

69
Fronius International GmbH / Martin Willinger / Fundamentals of the PMC Process Sales Meeting NA 2014 / Aug. 2014 - v01
PROCESS COMPARISON 5MM HOT ROLLED STEEL

Std. Universal Std. Dynamic LSC Univ.

5mm 5mm 5mm

/ Synergic line: 2566 / Synergic line: 2630 / Synergic line: 2765


/ wfs: 9,4m/min (370ipm) / wfs: 9,4m/min (370ipm) / wfs: 9,4m/min (370ipm)
/ I (rms): 256,5 Amp. / I (rms): 253 Amp. / I (rms): 244,7 Amp.
/ U (rms): 28,15 Volt / U (rms): 26,6 Volt / U (rms): 26,52 Volt
/ vs: 55cm/min (21.5ipm) / vs: 55cm/min (21.5ipm) / vs: 55cm/min (21.5ipm)
/ Real Energy: 0,981 kJ/mm / Real Energy: 0,970 kJ/mm / Real Energy: 0,894 kJ/mm

70
Fronius International GmbH / Martin Willinger / Fundamentals of the PMC Process Sales Meeting NA 2014 / Aug. 2014 - v01
PROCESS COMPARISON 3MM SAND BLASTED STEEL

Pulse PMC Universal PMC PCS

/ Synergic line: 2785 / Synergic line: 2850 / Synergic line: 2890


/ wfs: 8,8m/min (345ipm) / wfs: 8,8m/min (345ipm) / wfs: 8,8m/min (345ipm)
/ I (rms): 314,1 Amp. / I (rms): 302 Amp. / I (rms): 297,3 Amp.
/ U (rms): 26,63 Volt / U (rms): 22,96 Volt / U (rms): 22,75 Volt
/ vs: 80cm/min (31.5ipm) / vs: 80cm/min (31.5ipm) / vs: 80cm/min (31.5ipm)
/ Real Energy: 0,585 kJ/mm / Real Energy: 0,450 kJ/mm / Real Energy: 0,457 kJ/mm
/ Arc length stabilizer. 2.0 / Arc length stabilizer: 2.0

71
Fronius International GmbH / Martin Willinger / Fundamentals of the PMC Process Sales Meeting NA 2014 / Aug. 2014 - v01
PROCESS COMPARISON 3MM SAND BLASTED STEEL

Std. Universal Std. Dynamic LSC Univ.

/ Synergic line: 2566 / Synergic line: 2630 / Synergic line: 2765


/ wfs: 8,8m/min (345ipm) / wfs: 8,8m/min (345ipm) / wfs: 8,8m/min (345ipm)
/ I (rms): 304,1 Amp. / I (rms): 302,5 Amp. / I (rms): 299,5 Amp.
/ U (rms): 27,55 Volt / U (rms): 27,21 Volt / U (rms): 26,39 Volt
/ vs: 80cm/min (31.5ipm) / vs: 80cm/min (31.5ipm) / vs: 80cm/min (31.5ipm)
/ Real Energy: 0,637 kJ/mm / Real Energy: 0,607 kJ/mm / Real Energy: 0,592 kJ/mm

72
Fronius International GmbH / Martin Willinger / Fundamentals of the PMC Process Sales Meeting NA 2014 / Aug. 2014 - v01
PROCESS HEAT INPUT (“REAL ENERGY”) COMPARISON
1,4
1,2
1
0,8 10mm sand blasted
kJ/mm

0,6 8mm sand blasted


5mm mill scale
0,4 3mm sand blasted
0,2
0
Pulse PMC PMC Std. Std. LSC
Univ. PCS Univ. Dyn. Univ.

73
Fronius International GmbH / first name last name / Titel of presentation / xx.xx.20xx - v02
CTWD HEAT INPUT COMPARISON

/ PMC achieves the lowest and most consistence heat input

1,6
1,4
1,2
1
CTWD 10mm
0,8
CTWD 15mm
0,6 CTWD 20mm
0,4
0,2
0
Std. Univ. LSC Univ. Pulse PMC Univ.

/ Same wire feed speed was used for all processes (10m/min)
/ Penetration stabilizer was set to max. on PMC and LSC
/ Arc length stabilizer was used on PMC
74
Fronius International GmbH / first name last name / Titel of presentation / xx.xx.20xx - v02
RESULT: SMOOTH WELD APPEARANCE, LESS STRESS
UTILIZING ARC LENGTH STABILIZER
Standard (CV) Pulsed Arc PMC

/ Stress raiser / Stress raiser / Smooth weld appearance


/ Increased stress / Increased stress / Less stress in the weld
/ Decreased travel speed / Decreased travel speed / High travel speed possible
/ Good penetration profile / Good penetration profile / Excellent penetration profile
/ Smooth lines of force

75
Fronius International GmbH / Product Launch Perfect Welding 2015
OUTSTANDING PERFORMANCE USING PMC

/ Standard / Std. Dynamic / LSC Univ. / Pulse / PMC-PCS / PMC


3mm
8mm
10mm

76
Fronius International GmbH / Product Launch Perfect Welding 2015
AGENDA

/ PMC Heat Input Comparison


 Different transfer modes

/ Fume Generation During Welding


 Comparing CV, FCW with PMC

/ Welding of Galvanized Steel

77
Fronius International GmbH / Product Launch Perfect Welding 2015
PMC FUME GENERATION COMPARISON

1,4mm (0.052“) FCW Std. (CV) 1,4mm (0.052“) Solid Std. (CV) 1,4mm (0.052“) PMC

/Lorem
Filler ipsum
alloy:dolor
E71 sit1Mamet, consec
H8 (rutil) /Lorem
Filler ipsum
alloy:dolor sit amet,
ER70S-3 consec
/ G2Si1 /Lorem
Filler ipsum
alloy:dolor sit amet,
ER70S-3 consec
/ G2Si1
tetuer adipiscing elit. Aenean commodo tetuer adipiscing elit. Aenean commodo tetuer adipiscing elit. Aenean commodo
/ligula
Synergic line: 2739 (Std.)
eget dolor.
/ligula
Synergic line: 2711 (Std.)
eget dolor.
/ligula
Synergic line: 2904 (PMC)
eget dolor.
/ Gas: 82%Ar + 18%CO2 / Gas: 82%Ar + 18%CO2 / Gas: 82%Ar + 18%CO2
/Aenean massa. Cum
wfs: 17m/min sociis natoque
(670ipm) /Aenean massa. Cum
wfs: 13m/min sociis natoque
(510ipm) /Aenean massa. Cum
wfs: 13m/min sociis natoque
(510ipm)
pena tibus etmagnis dis parturient pena tibus etmagnis dis parturient pena tibus etmagnis dis parturient
/montes,
I (rms):nasc
432,8eturAridiculus mus. Donec /montes,
I (rms):nasc
429,5
eturAridiculus mus. Donec /montes,
I (rms):nasc
426,2eturAridiculus mus. Donec
/quam felis, 33,17
V (rms): ultriciesVnec, pellentesque eu, /quam felis, 34,2
V (rms): ultricies
V nec, pellentesque eu, /quam felis, 32V
V (rms): ultricies nec, pellentesque eu,
pretium quis, sem. pretium quis, sem. pretium quis, sem.
/ CTWD: 18mm / CTWD: 18mm / CTWD: 18mm

78
Fronius International GmbH / Product Launch Perfect Welding 2015
NEW PROCESS:

PMC MIX Drive

79
Fronius International GmbH / Product Launch Perfect Welding 2015
80
PMC-MIX ADVANTAGES

SEAM APPEARANCE
ripples like TIG

FREQUENCY
up to 15Hz EASIER ADJUSTMENT

ARC compared to SynchroPulse

stable arc also when robot/torch


position is changing
REDUCED HEAT INPUT
compared to Synchro Pulse

 better gap bridgability

81 Fronius International GmbH / Product Launch Perfect Welding 2015


PROCESS DIAGRAM

82
HIGHSPEED VIDEO

83
DIFFERENCE TO SYNCHOPULSE

/ PMC – MIX generate less heat input compared to synchropulse


/ PMC – MIX easier to adjust as „Synchropulse“
84
/ Only two parameters to configure the ripples of the weldseam
APPLICATIONS OF „PMC MIX“ FOR ROBACTA DRIVE

/ aluminium applications
/ seam appearance nearly like TIG
e.g. bicycle frames
/ flange weld
/ Instead of „CMT + Pulse“ is used

85
NEW PROCESS:

PMC MIX Push

86
Fronius International GmbH / Product Launch Perfect Welding 2015
APPLICATIONS OF „PMC MIX“ FOR PUSH SYSTEMS

87
APPLICATIONS OF „PMC MIX“ FOR PUSH SYSTEMS

88
APPLICATIONS OF „PMC MIX“ FOR PUSH SYSTEMS
/ PMC Mix with less heat input than SynchroPulse
/ Short arc process gives more stability in low power phase
/ Three new corrections
/ „Number of pulse cycles“ for the high power phase e.g. 10 up to 150 pulse cycles
/ „Time adjustment“ for the shortarc process e.g. 200ms up to 1,5 sec
/ „Power correction“ for the shortarc process e.g. ± 20%
/ Longer low power phase than PMC Mix Drive
/ Better penetration in low power phase

89
APPLICATIONS OF „PMC MIX“ FOR PUSH SYSTEMS
/ PMC Mix is a process combination of pulse arc and short arc welding process
This combines both the advantages of both welding processes
Stability in lower power process phase due to short arc and controlled
Heat input due to pulse arc in high process power phase

/ PMC Mix is used especially for welding in positions


For automated welding as well as for manual welding
Like for example ship building, steelwork,…

/ One of the big advantages is at vertical up welding. Due to the pulsing,


the pendular movement is not needed any more. What means, it is
possible to weld vertical up with a continuous leading up of the welding torch.
- Easier for the welder
- Easy to mechanize
90 - Faster welding speed due to smaller „a“ measure
APPLICATIONS OF „PMC MIX“ FOR PUSH SYSTEMS
1.2 Steel wire
18% CO2 82% Ar
PMC mix UP

/ vertical up welding without „weave motion“


/ simple to mechanize
/ vertical up seams smaller than a 5

91
92
93
Fronius International GmbH / Product Launch Perfect Welding 2015
NEW FUNCTION.

TEACH MODE

94
Fronius International GmbH / Product Launch Perfect Welding 2015
FUNCTION TEACHMODE FOR ROBACTA DRIVE

95
Fronius International GmbH / Product Launch Perfect Welding 2015
Thank you for your
attention

96
Fronius International GmbH / Product Launch Perfect Welding 2015
All information is without guarantee in spite of careful editing - liability excluded.
Intellectual property and copyright: all rights reserved. Copyright law and other laws protecting intellectual property apply to the content of this presentation and the documentation enclosed (including texts, pictures, graphics, animations
etc.) unless expressly indicated otherwise. It is not permitted to use, copy or alter the content of this presentation for private or commercial purposes without explicit consent of Fronius.

You might also like