Professional Documents
Culture Documents
GABION AS BUILT-BAAC FC 19M FINAL - 1 - 1 - 2019.sv$
GABION AS BUILT-BAAC FC 19M FINAL - 1 - 1 - 2019.sv$
A'' B''
121.00 m.
190.00 m.
191.00 m.
192.00 m.
193.00 m.
A'' B''
200.00 m.
2 E L E V A T I O N V I E W 1 P L A N V I E W
P-2 SCALE 1:100 m.
P-2 SCALE 1:100 m.
1.8 2.48
EM
A1EMBA 4TH LAYER BA 4TH LAYER
1.80
NK A4 NK
ME ME
NT N T
3RD LAYER 3RD LAYER
MATTRESS MATTRESS
8.3
1.0
A2
6.0
0.3 A3
3 SECTION A''-A'' VIEW 4 SECTION B''-B'' VIEW
P-2 SCALE 1:50 m. P-2 SCALE 1:50 m.
PROJECT AND LOCATION SHEET CONTENTS: PREPARED BY: CHECKED BY: RECOMMENDING APPROVAL: APPROVED BY: SET NO. SHEET NO.
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REHABILITATION OF LANGIDEN FLOOD
ABRA
CONTROL AS SHOWN 2
DISTRICT ENGINEERING OFFICE P-2
CORDILLERA ADMINISTRATIVE REGION
BAAC, LANGIDEN, ABRA R.S. Sepian Construction and Trucking ENGINEER II OIC-ASSISTANT DISTRICT ENGINEER OIC-DISTRICT ENGINEER
2
Bangued, Abra
DATE: DATE: DATE: DATE:
S I T E 0 1
B'
A' 56.00 m. 35.00 m.
5.0 m.
5.0 m.
5.0 m.
5.0 m.
99.00 m.
98.00 m.
105.00 m. NEWLY REPAIRED GABION
112.00 m.
113.00 m.
B'
112.00 m.
112.00 m. MATTRESS
58.0 m
A' 1
P-1
P
SCALE
L A N V I E W
1:100 m.
56.00 m. 35.00 m.
7.00 m.
7.00 m.
105.00 m.
4.00 m. EMBANKMENT
1.61 m.
P-1 SCALE 1:100 m. 7TH LAYER
A7 6TH LAYER A1
0.61 m.
EM
A2
BA 5TH LAYER
A6 NK 2.50 m.
ME
NT
4TH LAYER EXISTING GABIONS MATTRESS
A5 A4 3RD LAYER
A3
A2 2ND LAYER
FILTER CLOTH A1
1ST LAYER
PROJECT AND LOCATION SHEET CONTENTS: PREPARED BY: CHECKED BY: RECOMMENDING APPROVAL: APPROVED BY: SET NO. SHEET NO.
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REHABILITATION OF LANGIDEN FLOOD
ABRA
CONTROL AS SHOWN 1
DISTRICT ENGINEERING OFFICE P-1
CORDILLERA ADMINISTRATIVE REGION
BAAC, LANGIDEN, ABRA R.S. Sepian Construction and Trucking ENGINEER II OIC-ASSISTANT DISTRICT ENGINEER OIC-DISTRICT ENGINEER
2
Bangued, Abra
DATE: DATE: DATE: DATE:
S I T E 0 1
7TH LAYER 2.00 m.
0 10 20 30 40 50 60 70 80 90 100
PROJECT AND LOCATION SHEET CONTENTS: PREPARED BY: CHECKED BY: RECOMMENDING APPROVAL: APPROVED BY: SET NO. SHEET NO.
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REHABILITATION OF LANGIDEN FLOOD
ABRA
CONTROL AS SHOWN 1
DISTRICT ENGINEERING OFFICE SLD-1
CORDILLERA ADMINISTRATIVE REGION
BAAC, LANGIDEN, ABRA R.S. Sepian Construction and Trucking ENGINEER II OIC-ASSISTANT DISTRICT ENGINEER OIC-DISTRICT ENGINEER
4
Bangued, Abra
DATE: DATE: DATE: DATE:
S I T E 0 1
7TH LAYER
6TH LAYER
5TH LAYER
4TH LAYER
3RD LAYER
2ND LAYER
1ST LAYER
100 110 120 130 140 150 160 170 180 190 200
PROJECT AND LOCATION SHEET CONTENTS: PREPARED BY: CHECKED BY: RECOMMENDING APPROVAL: APPROVED BY: SET NO. SHEET NO.
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REHABILITATION OF LANGIDEN FLOOD
ABRA
CONTROL AS SHOWN 2
DISTRICT ENGINEERING OFFICE SLD-1
CORDILLERA ADMINISTRATIVE REGION
BAAC, LANGIDEN, ABRA R.S. Sepian Construction and Trucking ENGINEER II OIC-ASSISTANT DISTRICT ENGINEER OIC-DISTRICT ENGINEER
4
Bangued, Abra
DATE: DATE: DATE: DATE:
S I T E 0 1
7TH LAYER
6TH LAYER
5TH LAYER
4TH LAYER
3RD LAYER
2ND LAYER
1ST LAYER
200 210 220 230 240 250 260 270 280 290 300
PROJECT AND LOCATION SHEET CONTENTS: PREPARED BY: CHECKED BY: RECOMMENDING APPROVAL: APPROVED BY: SET NO. SHEET NO.
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REHABILITATION OF LANGIDEN FLOOD
ABRA
CONTROL AS SHOWN 2
DISTRICT ENGINEERING OFFICE SLD-1
CORDILLERA ADMINISTRATIVE REGION
BAAC, LANGIDEN, ABRA R.S. Sepian Construction and Trucking ENGINEER II OIC-ASSISTANT DISTRICT ENGINEER OIC-DISTRICT ENGINEER
4
Bangued, Abra
DATE: DATE: DATE: DATE:
S I T E 0 2
4TH LAYER
3RD LAYER
2ND LAYER
1ST LAYER
0 10 20 30 40 50 60 70 80 90 100
PROJECT AND LOCATION SHEET CONTENTS: PREPARED BY: CHECKED BY: RECOMMENDING APPROVAL: APPROVED BY: SET NO. SHEET NO.
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REHABILITATION OF LANGIDEN FLOOD
ABRA
CONTROL AS SHOWN 3
DISTRICT ENGINEERING OFFICE SLD-1
CORDILLERA ADMINISTRATIVE REGION
BAAC, LANGIDEN, ABRA R.S. Sepian Construction and Trucking ENGINEER II OIC-ASSISTANT DISTRICT ENGINEER OIC-DISTRICT ENGINEER
4
Bangued, Abra
DATE: DATE: DATE: DATE:
S I T E 0 2
4TH LAYER
3RD LAYER
2ND LAYER
1ST LAYER
100 110 120 130 140 150 160 170 180 190 200
PROJECT AND LOCATION SHEET CONTENTS: PREPARED BY: CHECKED BY: RECOMMENDING APPROVAL: APPROVED BY: SET NO. SHEET NO.
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REHABILITATION OF LANGIDEN FLOOD
ABRA
CONTROL AS SHOWN 4
DISTRICT ENGINEERING OFFICE SLD-1
CORDILLERA ADMINISTRATIVE REGION
BAAC, LANGIDEN, ABRA R.S. Sepian Construction and Trucking ENGINEER II OIC-ASSISTANT DISTRICT ENGINEER OIC-DISTRICT ENGINEER
4
Bangued, Abra
DATE: DATE: DATE: DATE: