You are on page 1of 7

S I T E 0 2

A'' B''

121.00 m.
190.00 m.
191.00 m.
192.00 m.
193.00 m.

A'' B''
200.00 m.
2 E L E V A T I O N V I E W 1 P L A N V I E W
P-2 SCALE 1:100 m.
P-2 SCALE 1:100 m.

2.50 m. 0.50 m. 0.50 m. 2.50 m. 0.50 m. 0.50 m.

1.8 2.48

EM
A1EMBA 4TH LAYER BA 4TH LAYER
1.80

NK A4 NK
ME ME
NT N T
3RD LAYER 3RD LAYER

2ND LAYER 2ND LAYER


FILTER CLOTH FILTER CLOTH
1ST LAYER 1ST LAYER

MATTRESS MATTRESS
8.3
1.0

A2
6.0
0.3 A3
3 SECTION A''-A'' VIEW 4 SECTION B''-B'' VIEW
P-2 SCALE 1:50 m. P-2 SCALE 1:50 m.

PROJECT AND LOCATION SHEET CONTENTS: PREPARED BY: CHECKED BY: RECOMMENDING APPROVAL: APPROVED BY: SET NO. SHEET NO.
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REHABILITATION OF LANGIDEN FLOOD
ABRA
CONTROL AS SHOWN 2
DISTRICT ENGINEERING OFFICE P-2
CORDILLERA ADMINISTRATIVE REGION
BAAC, LANGIDEN, ABRA R.S. Sepian Construction and Trucking ENGINEER II OIC-ASSISTANT DISTRICT ENGINEER OIC-DISTRICT ENGINEER
2
Bangued, Abra
DATE: DATE: DATE: DATE:
S I T E 0 1
B'
A' 56.00 m. 35.00 m.

5.0 m.

5.0 m.

5.0 m.

5.0 m. EXISTING GABION


5.0 m.

5.0 m.

99.00 m.
98.00 m.
105.00 m. NEWLY REPAIRED GABION

112.00 m.
113.00 m.
B'
112.00 m.
112.00 m. MATTRESS

58.0 m
A' 1
P-1
P
SCALE
L A N V I E W
1:100 m.

56.00 m. 35.00 m.
7.00 m.

7.00 m.
105.00 m.
4.00 m. EMBANKMENT

0.50 m. 0.50 m. 0.50 m. 0.50 m. 0.50 m. 0.50 m. 4.70 m.


7TH LAYER 2 E L E V A T I O N V I E W 1.00 m.

1.61 m.
P-1 SCALE 1:100 m. 7TH LAYER

A7 6TH LAYER A1
0.61 m.
EM
A2
BA 5TH LAYER
A6 NK 2.50 m.
ME
NT
4TH LAYER EXISTING GABIONS MATTRESS
A5 A4 3RD LAYER
A3
A2 2ND LAYER
FILTER CLOTH A1
1ST LAYER

3 SECTION A'-A' VIEW


P-1 SCALE 1:50 m. 4 SECTION B'-B' VIEW
P-1 SCALE 1:50 m.

PROJECT AND LOCATION SHEET CONTENTS: PREPARED BY: CHECKED BY: RECOMMENDING APPROVAL: APPROVED BY: SET NO. SHEET NO.
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REHABILITATION OF LANGIDEN FLOOD
ABRA
CONTROL AS SHOWN 1
DISTRICT ENGINEERING OFFICE P-1
CORDILLERA ADMINISTRATIVE REGION
BAAC, LANGIDEN, ABRA R.S. Sepian Construction and Trucking ENGINEER II OIC-ASSISTANT DISTRICT ENGINEER OIC-DISTRICT ENGINEER
2
Bangued, Abra
DATE: DATE: DATE: DATE:
S I T E 0 1
7TH LAYER 2.00 m.

6TH LAYER 2.00 m.

5TH LAYER 2.00 m.

4TH LAYER 2.00 m.

3RD LAYER 2.00 m.

2ND LAYER 2.00 m.

1ST LAYER 2.00 m.

0 10 20 30 40 50 60 70 80 90 100

PROJECT AND LOCATION SHEET CONTENTS: PREPARED BY: CHECKED BY: RECOMMENDING APPROVAL: APPROVED BY: SET NO. SHEET NO.
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REHABILITATION OF LANGIDEN FLOOD
ABRA
CONTROL AS SHOWN 1
DISTRICT ENGINEERING OFFICE SLD-1
CORDILLERA ADMINISTRATIVE REGION
BAAC, LANGIDEN, ABRA R.S. Sepian Construction and Trucking ENGINEER II OIC-ASSISTANT DISTRICT ENGINEER OIC-DISTRICT ENGINEER
4
Bangued, Abra
DATE: DATE: DATE: DATE:
S I T E 0 1
7TH LAYER

6TH LAYER

5TH LAYER

4TH LAYER

3RD LAYER

2ND LAYER

1ST LAYER

100 110 120 130 140 150 160 170 180 190 200

PROJECT AND LOCATION SHEET CONTENTS: PREPARED BY: CHECKED BY: RECOMMENDING APPROVAL: APPROVED BY: SET NO. SHEET NO.
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REHABILITATION OF LANGIDEN FLOOD
ABRA
CONTROL AS SHOWN 2
DISTRICT ENGINEERING OFFICE SLD-1
CORDILLERA ADMINISTRATIVE REGION
BAAC, LANGIDEN, ABRA R.S. Sepian Construction and Trucking ENGINEER II OIC-ASSISTANT DISTRICT ENGINEER OIC-DISTRICT ENGINEER
4
Bangued, Abra
DATE: DATE: DATE: DATE:
S I T E 0 1
7TH LAYER

6TH LAYER

5TH LAYER

4TH LAYER

3RD LAYER

2ND LAYER

1ST LAYER

200 210 220 230 240 250 260 270 280 290 300

PROJECT AND LOCATION SHEET CONTENTS: PREPARED BY: CHECKED BY: RECOMMENDING APPROVAL: APPROVED BY: SET NO. SHEET NO.
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REHABILITATION OF LANGIDEN FLOOD
ABRA
CONTROL AS SHOWN 2
DISTRICT ENGINEERING OFFICE SLD-1
CORDILLERA ADMINISTRATIVE REGION
BAAC, LANGIDEN, ABRA R.S. Sepian Construction and Trucking ENGINEER II OIC-ASSISTANT DISTRICT ENGINEER OIC-DISTRICT ENGINEER
4
Bangued, Abra
DATE: DATE: DATE: DATE:
S I T E 0 2

4TH LAYER

3RD LAYER

2ND LAYER

1ST LAYER

0 10 20 30 40 50 60 70 80 90 100

PROJECT AND LOCATION SHEET CONTENTS: PREPARED BY: CHECKED BY: RECOMMENDING APPROVAL: APPROVED BY: SET NO. SHEET NO.
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REHABILITATION OF LANGIDEN FLOOD
ABRA
CONTROL AS SHOWN 3
DISTRICT ENGINEERING OFFICE SLD-1
CORDILLERA ADMINISTRATIVE REGION
BAAC, LANGIDEN, ABRA R.S. Sepian Construction and Trucking ENGINEER II OIC-ASSISTANT DISTRICT ENGINEER OIC-DISTRICT ENGINEER
4
Bangued, Abra
DATE: DATE: DATE: DATE:
S I T E 0 2

4TH LAYER

3RD LAYER

2ND LAYER

1ST LAYER

100 110 120 130 140 150 160 170 180 190 200

PROJECT AND LOCATION SHEET CONTENTS: PREPARED BY: CHECKED BY: RECOMMENDING APPROVAL: APPROVED BY: SET NO. SHEET NO.
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REHABILITATION OF LANGIDEN FLOOD
ABRA
CONTROL AS SHOWN 4
DISTRICT ENGINEERING OFFICE SLD-1
CORDILLERA ADMINISTRATIVE REGION
BAAC, LANGIDEN, ABRA R.S. Sepian Construction and Trucking ENGINEER II OIC-ASSISTANT DISTRICT ENGINEER OIC-DISTRICT ENGINEER
4
Bangued, Abra
DATE: DATE: DATE: DATE: