You are on page 1of 1

10mm ∅

1.10 m. LONGITUDINAL
0.15 m. BARS SPACE @
0.3m O.C. W b
LEAN CONCRETE
L
06-10mm ∅ 50mm THK.

HORIZONTAL P A R A P E T
BARS AS SHOWN S L O P E
2.0 m. 2.0 m.
WEEP HOLES
100mm ∅

3 SECTION VIEW W/ DETAILS STONE h2 1.0 m.


EMBANKMENT
P-2 SCALE 1:10m.
MASONRY
H
FILTER CLOTH
0.15 m. 0.15 m.
h1 h
10-10mm ∅
HORIZONTAL B EXCAVATION
BARS AS SHOWN
1 S E C T I O N V I E W 2 ELEVATION VIEW
10mm ∅ VERTICAL BARS P-2 SCALE 1:30m.
P-2 SCALE 1:30m.

0.95 m. SPACE @ 0.3m O.C.

0.15 m.

1.10 m.
4 SECTION VIEW W/ DETAILS
P-2 SCALE 1:10m.

PROJECT AND LOCATION SHEET CONTENTS: DESIGNED BY: PREPARED BY: APPROVED BY: SUBMITTED BY: SET NO. SHEET NO.
Republic of the Philippines
REPAIR/ MAINTENANCE OF
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
DRAINAGE PROTECTION SECTION VIEW
ABRA 02
DISTRICT ENGINEERING OFFICE
CORDILLERA ADMINISTRATIVE REGION
WORKS ALONG ABRA - ILOCOS
SUR ROAD ELEVATION VIEW JUN MICHAEL A. VELASCO ARLON DON G. BARBERO EDWIN T. BRINGAS LORETO B. DACOROON P-2 02
ENGINEER II ENGINEER II CHIEF, MAINTENANCE SECTION ASSISTANT DISTRICT ENGINEER
Bangued, Abra
K0388+495 - K0388+661.50
QUANTITY TAKEOFF DATE: DATE: DATE: DATE:
(CARETAKER)

You might also like