8-16mmØ VERTICAL MAIN BARS

0.25
8-16mmØ HORIZONTAL MAIN BARS
10mmØ LAT. TIES SPACE @ 5-.05,
4-.15, 3-.10, REST @ .20m BOTH
WAYS ON CENTER
10mmØ VERT. BARS SPACE
@ .60m. & 10mmØ
HOR. BARS @ EVERY 3

0.35
LAYERS OF CHB WALL

10mmØ STIRRUPS
SECTION
FLOOR BEAM 1 SPACE @ 5-.05, 4-.15, NGL. NGL.
3-.10, REST @ .20m
BOTH WAYS ON
CENTER

0.66
1 DETAIL OF BEAM

1.00
SCALE 1:15mts.
S-03

0.25
19.80

EXISTING FB1 1.40


SECTION
0.40

.30
0.70

C O N C R E T E C A N O P Y
SECTION

Y
FB1 FB1

P
1.20

O
N
FB2
2.45

A
1.20

C
E
FB1 PROPOSED CONC . SLAB PROPOSED CONC . SLAB 0.30
4.90

6.60
T

3-12mmØ CONT. BASE BARS


FB1 & 10mmØ STIRRUPS @ .40m.
E

14-16mmØ BASE ON CENTER


R
2.45

BARS AT EQUAL
FB2
C

DISTANCE BOTH
N

WAYS ON CENTER
O

FB1 FB1
C

0.30
1.20
CB CB
0.70

CONCRETE CANOPY
1.00

PROPOSED CONC . SLAB

3.40
0.70

0.68 5.83 C1F1 0.40


PLAN
PLAN
2 FLOOR BEAM LAYOUT
SCALE 1:50mts.
S-02
3 COLUMN, FOOTING & WALL FOOTING DETAIL
SCALE 1:15mts.
S-03

REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENT: DRAFTED: REVIEWED: SUBMITTED: RECOMENDED: APPROVED: SET NO. SHEET NO.
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
REGION V CY 2020 PROJECT
LOCAL PROGRAM - BUILDING & OTHER STRUCTURE - MULTI-PURPOSED /
CAMARINES SUR 5TH FACILITIES LOCAL INSFRASTRUCTURE PROGRAM COLUMN FOOTING & S 6
CONSTRUCTION / COMPLETION OF MULTI-PURPOSE BUILDING WALL FOOTING DETAIL
DISTRICT ENGINEERING OFFICE COORDINATES: N 13.490459, E 123.459477 DETAIL OF BEAM LARRY M. OLIVEROS ARMAN C. IBARRETA JOSE P. GONZAGA NIDA P. PONTILLAS NESTOR P. GORIMBAO 2 3 9
STA. TERESITA, BAAO, CAMARINES SUR BRGY.STA MARIA IRIGA CITY, CAMARINES SUR FLOOR BEAM LAYOUT DRAFSTMAN ENGINEER II CHIEF, PLANNING AND DESIGN SECTION IN-CHARGE, OFFICER OF THE ASSISTANT DISTRICT ENGINEER
DATE: DATE: DATE: DATE: DISTRICT ENGINEER DATE: