6" CONC, HOLLOW BLOCKS

W/ Ø10MM BARS @ 3 C.H.B


Ø 10MM TIES BOTHWAYS
1 2 3 4 5 6 @ CEMENT PLASTER
8-16mm Ø VERTICAL BARS W/ 10 mmØ
0.2M O.C. FIN. CEMENT FLOOR
IES SP.4 @ 0.05m, 4 @ 0.10 m,
8-Ø 16MM
rest @ 0.15m. O.C. B.W. VERT. FIN. FLOOR Ø10MM TEMP BARS @
BARS LINE 0.50M OC BW.

0.30M
12.36m 0.10m THK. CONC. FLOORING WITH 4" CONC. SLAB
10mm Ø TEMP. BARS SP. AT 0.60m
O.C. B.E.
4" GRAVEL

0.30M
2.82m 2.82m 1.9m 2.41m 2.41m

WF1 WF1 0.30M FIN.

VARIABLE
GR. LINE EARTH FILL
0.10m thk. GRAVEL FILL
0.2M NAT. GRD. LN. 0.80m
ON FILL 3-Ø12MM CONTINUOUS

0.30M
ON FILL
Ø10MM BARS

0.50M
A A 8-12 mm Ø MATTING

0.50M
STIRUPS
BARS SP. AS SHOWN Ø10MM TRANSVERSE

0.25M
WF1 WF1

0.03M
F1 C1 F1 C1 WF1 F1 C1 WF1 F1 C1
F1 C1 F1 C1
BARS @ 0.30M. O.C.

0.80M

1.20M

0.20M
CLASS A CONTINUOUS

0.20m

0.80m
3.56m

3.56m
CONCRETE FOOTING
WF1 WF1 WF1
0.45m

0.10M 0.30M
WF1

SECTION

12MM THK. EXPANSION


B ON FILL ON FILL
B JOINT W/ MASTIC FILLER
SECTION
F1 C1 F1 C1 F1 C1 F1 C1
0.20m
PLAN
10.83m

10.83m
3.71m

3.71m
F1 C1

(DOWEL)
WF1 WF1
WF1

0.60m
WF1

S DETAIL OF FOOTING
2 SCALE NTS FOR SIZE AND SPACING
OF HORT. AND VERT. BARS
SEE CONSTRUCTION NOTES
C ON FILL ON FILL C
F1 C1 F1 C1 F1 C1 F1 C1 4" CONCRETE HOLLOW
1 2 3 4 5 6 BLOCKS
3.56m

3.56m
WF1 WF1
WF1
WF1

12.36m

WF1 WF1
D D 2.82m 2.82m 1.9m 2.41m 2.41m
F1 C1 F1 C1 F1 C1 F1 C1

WF1
5.64m 1.9m 2.41m 2.41m A A

12.36m

3.56m

3.56m
1 2 3 4 5 6
B B

s FOUNDATION PLAN
1 SCALE 1:100

10.83m
10.83m

3.71m

3.71m
TIME REQUIRED BEFORE REMOVAL OF FORMS
C C
PART OF STRUCTURE CLASSIFICATION OF PARTS TIME REQUIRED

3.56m

3.56m
A. MASSIVE FOOTINGS A. 1 DAY (24 HOURS)
FOOTINGS B. CANTILEVER FOOTINGS B. 5 DAYS (120 HOURS)
C. SLAB FOOTING C. 5 DAYS (120 HOURS)
D D
UP
A. MASSIVE WALLS - 0.30M A. UP TO 2M HIGH - 1 DAY (24 HRS.) ADD 1 DAY FOR
THICK OR MORE EVERY ADDITIONAL METER OF HEIGHT OR
WALLS AND PLASTERS 5mm THK. MARINE
B. THIN WALLS - LESS FRACTION. PLYWOOD EXTERIOR
CEILING
THAN 0.30M THICK B. UP TO 2M HIGH - 2 DAYS (48 HRS.) ADD 1 21 DAYS 5.64m 1.9m 2.41m 2.41m
C. CANTILEVER WALLS, BUTTRESSES, FOR EVERY ADDITIONAL METER OF HEIGHT BUT NOT
COUNTER-FORTS, DIAPHRAGMS MORE THAN 28 DAYS.
12.36m
C. WITHOUT LOADS, SAME AS (B)

A. RATIO OF HEIGHT TO LEAST A. 2 DAYS (48 HOURS) DIAMETER UP TO 4. 1 2 3 4 5 6


DIAMETER UP TO 4 B. ADD TO THE ABOVE 1 DAY FOR EVERY
COLUMN
B. RATIO OF HEIGHT TO LEAST ADDITIONAL METER OF HEIGHT BUT NOT
DIAMETER FROM 4 TO 15 MORE THAN 28 DAYS.
s REFLECTED CEILING PLAN
A. SIDES A. 3 DAYS (72 HOURS) 3 SCALE 1:100
BEAMS AND GIRDERS B. BOTTOMS B. UP TO 4.20M - 14 DAYS (336 HRS). ADD 21 DAY FOR
EVERY 0.30M ADDITIONAL SPAN OR FRACTION THEREOF
BUT NOT MORE THAN 28 DAYS

STRUCTURAL / CIVIL ENGINEER SEAL PROFESSIONAL ELECTRICAL ENGINEER SEAL PROJECT TITLE: REPUBLIC ACT 9266, SEC. 20 ( 4 ) OWNER: DESIGNED BY:
Drawing and specifications duly signed, stamped or sealed, as instrument of
service, are the intellectual properties and documnets of the architect/designer, RYAN REDOBLADO
S-1
MELMAR JANGERALD SABIO PRC No:
PTR No:
TIN No:
DATE ISSUED:

REGISTERED MASTER PLUMBER SEAL


INSTITUTIONALBUILDING
INSTITUTIONAL BUILDING
whether the object for which they are made is executed or not. It shall be
unlawful to any person, without the written consent of the architect or author of
the said documents, to duplicate or to make copies of said documents for use
in the repetition or and for other projects or buildings, whether executed partly
JEFFREY P. RESOLA PREPARED BY:
RYAN REDOBLADO
CHECKED BY:
3
PRC No: 0173302

PTR No:
TIN No: 760931528000
DATE ISSUED:11 / 25 / 2019 PRC No:
PTR No:
TIN No:
DATE ISSUED:
LOCATION: or in whole without their permission. All drawings are to be return when no
longer in use.
SHEET CONTENTS
DATE: 7