B1 ROOF BEAM DETAIL B2 ROOF BEAM DETAIL B3 ROOF BEAM DETAIL RB ROOF BEAM DETAIL BEND / CONC. COVER
BEAM SCHEDULE
COLUMN COLUMN
100mm THK CHB W/ 10MMØ REBAR @
EVERY 3RD-LAYER HOR. SPACE @ 800MM VERT.
SCHEDULE OF SLAB
BARS: 6-16mmØ BARS: 4-16mmØ
T(mm) REMARKS
SHORT SUPPORT LONG SUPPORT
SLAB-ID BOTTOM BARS TOP BARS BOTTOM BARS TOP BARS
DETAIL BARS: 6-16MMØ / TIES: 10MMØ DETAIL BARS: 4-16MMØ / TIES: 10MMØ
3-10MMØ CONT. BARS
SECTION: 1000 x 1000 x 300 SECTION: 600 x 600 x 300
CONTINUOUS BEND BARS INTERIOR EXTERIOR CONTINUOUS BEND BARS INTERIOR EXTERIOR
SPACING : 1 @ 0.05M SPACING : 1 @ 0.05M
2 @ 0.10M 2 @ 0.10M
REINFORCEMENT: REINFORCEMENT: 10MMØ @
3 @ 0.15M 3 @ 0.15M S-1 10MMØ @ 300 N/A 10MMØ @ 300 10MMØ @600 10MMØ @ 300 10MMØ @ 300 10MMØ @ 300 100 ONE WAY SLAB
REST @ 0.20M ( 2 SETS) REST @ 0.20M ( 2 SETS) GRAVEL BED 10MMØ BARS @ 0.30M O.C. 300
LONG SIDE : 12 -16MM Ø LONG SIDE : 8 -16MM Ø
SHORT SIDE: SHORT SIDE: SAME 10MMØ RSB SP. @ 0.23M O.C. B.W.
DEPTH OF EMBEDMENT: VARIES DEPTH OF EMBEDMENT: VARIES
F1 FOOTING DETAIL C1 COLUMN DETAIL F2 FOOTING DETAIL C2/C1 COLUMN DETAIL WF WALL FOOTING DETAIL 2"x10" PLANKS(THREAD)
3
COLUMN FOOTING DETAIL & SCHEDULE 10MMØ TOP RSB
SP. @ 0.30M O.C.
8" THK BRONZE GLASS
0.10
WITH 10mmØ SP. @ 0.60m TOP OF STAIR LANDING
SP. @ 0.30M O.C.
O.C.B.W. 5.00 5.00
0.10
0.18
5"THK CHB W/ 10MMØ RSB
SP. @ 0.60M O.C.B.W.
0.85 2.40 2.60 2.40 CONCRETE MOULDING
B3
0.85 FINISHED FLOOR LINE
2.16 1.64 1.20
0.10
C2F2 C1F1
PROPERTY LINE
PROPERTY LINE PROPERTY LINE FIREWALL B3
H
1.26
BEAM
WF WF WF ONE WAY SLAB
5" THK CHB W/ 10MMØ RSB
SP. @ 0.80M O.C. B.W.
1.50
B3
B3
SLAB ON FILL
ELEV. @ 0.20m
1.00
ELEV. @ 0.00M
WF
2.00
WF
B
WF
SLAB ON FILL
ELEV. @ 0.05M B2
GROUND FLOOR LINE
2C1 2C1 10Ø STIFFENER
10MMØ MAIN RSB
COMMON WALL
@ 1.50M 0.c
SP. @ 0.30M O.C.
WF
ONE WAY SLAB
ELEV. @ 0.20m
C1F1 SLAB ON FILL
C1F1 10MMØ TEMP. RSB NATURAL GRADE LINE(VERIFY ACTUAL) 4 TYPICAL DROP BEAM DETAIL
SP. @ 0.30M O.C.
6.50
5.00
B1
B2
B2
WF
COMMON WALL
4.50
ELEV. @ 0.20m
5"THK CHB W/ 10MMØ RSB
SP. @ 0.60M O.C.B.W.
SP.A.
FIN. FLR. LINE
0.10
TOP LINE OF PCCP(STREET GUTTER)
OPEN
VARIES
COMPACTED GRAVEL
WF NGL BASE
C2F2
B2 B3
2C1 2C1
0.60
WALLL FOOTING
WF WF
0.85
WF
WF
C1F1 C1F1
1.00
1.50
1.50
T
TO WALL FOOTING
5"THK CHB W/ 10MMØ RSB
0.12
SP. @ 0.60M O.C.B.W. 3.50 1.50 3.50 1.50
SP.A.
5.00 5.00 L OR W
1 FOUNDATION PLAN 2 SECOND FLOOR FRAMING PLAN 5 COLUMN FOOTING REINF. DETAIL
S-01 SCALE: 1:50 S-01 SCALE: 1:50 S-01 SCALE: 1:50
CIVIL ENGINEER: PRC NO.: PROJECT TITLE: APPROVAL: SHEET CONTENTS: REVISIONS: CAD BY: SHEET NO:
VALIDITY: AS-BUILT TWO STOREY RESIDENCE BEAM SCHEDULE
COLUMN FOOTING DETAIL & SCHEDULE
PTR NO.:
ISSUED AT:
SCHEDULE OF SLAB
FOUNDATION PLAN S-01
ISSUED ON: DR. POTENCIANO MALVAR SECOND FLOOR FRAMING PLAN
TIN NO.: LOCATION: MY HOMES SUBDIVISION, BRGY STA ANASTACIA, STO TOMAS OWNER
CONCRETE STAIR LANDING REINF. DETAIL
TYPICAL DROP BEAM DETAIL
4 8
ISSUED AT: BATANGAS COLUMN FOOTING REINF. DETAIL NO. DESCRIPTION DATE