25MM Ø SPACER BARS 128

EVERY 2.0M
16mm Ø SPIRAL
36mm Ø
76 - P3602 I MAIN BARS 150
P1602 J 100
@ 0.075M PITCH 25mm Ø CONFINEMENT
EVERY 2.00 M 200

0.200
25MM Ø 2.5 LOOPS
RINGS, 2 1/2 LOOP

2 HEIGHT OF COPING
CONFINEMENT RINGS
EVERY 2.0M
100
150

1.333
25mm Ø SPACER
ABP1601 J 0.075 0.075 SPACER BAR DETAILS

3
SCALE 1:80
@ 0.075M PITCH
1.80
76 - ABP3601 I SECTION OF BORED PILE 0.25
SCALE 1:80 LAP LENGTH

ABP1601 J
@ 0.075M PITCH

70
8mm WELD

0
SP

LA
LI

P
0.20

CE
WELDED LENGTH
BORED PILE LENGTH= 30.00 M
BORED PILE LENGTH= 30.00 M

ABP1601 J
@ 0.075M PITCH
ELEVATION 25mmØ 2 12 LOOP
SCALE 1:80
CONFINEMENT RINGS
WELDED PORTION
ABUTMENT "B"
ABUTMENT "B"

150
SPIRAL LAPS MUST BE
S = 1/2 BAR
12 X BAR DIAMETER DIAMETER
FULL STRENGTH LAP WELD E = 8mm

ABP1601 J PLAN S
CONFINEMENT RING DETAILS
@ 0.075M PITCH SCALE 1:80 FOR EACH BORED PILE AT ABUTMENT
SCALE 1:80

REINFORCEMENT SCHEDULE FOR EACH BORED PILE


76 - ABP3601 I BENDING DIAGRAM
DIMENSIONS CONCRETE
STRUCTURE
ARE BAR DIMENSIONS (M) VOLUME
COMPONENT LENGTH TOTAL UNIT TOTAL
OUT TO OUT MARK
SIZE
QUANTITY SPACING SHAPE PER BAR LENGTH WEIGHT WEIGHT ( M3 )
OF REBARS (mm) (M)
(M) (M) (kg/m) (kg)
a b c d e f
ABP1601 J
@ 0.075M PITCH BORED PILE ABP3601 36 76 AS SHOWN I 31.00 0.500 - - - - 31.50 2,394.00 7.990 19,128.84 76.34 m 3

a
ABP1601 16 402 0.075 J 4.56 - - - - - 5.18 2,082.36 1.578 3,286.66

SPACE
J BAR 25 120 2.00 K 0.150 0.100 0.200 - - - 0.70 84.00 3.853 323.65
0.075

CONF.
a
RING 25 15 2.00 J 10.82 - - - - - 12.39 185.85 3.853 716.15

GRADE 40 = 00.00 Kgs ; GRADE 60 = 25,868.13 Kgs


0.075 1.800 0.075 SUB - TOTAL = 25,868.13 Kgs
1.800
I

SECTION SECTION a GRADE 40 = 00.00 Kgs ; GRADE 60 = 25,868.13 Kgs


SCALE 1:80 SCALE 1:80 REBAR NOTES: GRAND TOTAL: GRAND TOTAL = 25,868.13 Kgs 76.34 m 3
b
- CONFINEMENT RING AND SPACERS EVERY 2.00 M c
b
- CUT-OFF LENGTH: 1.200 M a
- LAP SPLICE FOR SPIRAL MIN. 700mm N O T E : THE SCHEDULE OF REINFORCEMENT SHOWN ON THIS TABLE IS FOR REFERENCE ONLY. THE CONTRACTOR SHOULD
- SPACERS AND CONFINEMENT RINGS TO BE CHECK AND VERIFY ALL DIMENSIONS AND QUANTITIES DURING CONSTRUCTION.
WELDED. INCREASE OF 10% ON REBAR TO COMPENSATE THE REBAR SPLICING
K

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES JUNEL J. MANRIQUE
ENGINEER II
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION OF MISSING LINKS / NEW ROADS ABUTMENT "B" BORED PILE DETAILS AND
REGIONAL OFFICE NO. IV-A GENERAL AGUINALDO-MAGALLANES-NASUGBU ROAD
REINFORCEMENT SCHEDULE AND ESTIMATED PREPARED:
RUEL S. CASIMIRO MELQUIADES H. STO. DOMINGO JOVEL G. MENDOZA SAMSON L. HEBRA, CESO IV
EDSA, QUEZON CITY (EAST-WEST ROAD), INDANG SECTION, PACKAGE A CHIEF, BRIDGES AND OTHER PUBLIC ENGINEER IV, CARETAKER, PLANNING OFFICER - IN - CHARGE DIRECTOR IV
CAVITE PROVINCE (BRIDGE 10) QUANTITIES JOHN MARK B. AGUELO WORK DESIGN SECTION AND DESIGN DIVISION OFFICE OF THE ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
ENGINEER II DATE: DATE: DATE: DATE: