2.

00
CUT DECKING

1 2 3 4 1 2 3 4 AS REQUIRED
FOR WELDING
8-20mm∅ MAIN BARS
WITH 2-10mm ∅ TIES SPACED
STUDS 5@50mm, 5@100mm, 5@150mm,
REST @ 200mm

100
100
0.35
8500 BEAM
4000 3500 1000

2.00

0.60
USE 12 GAGE
SB B1 ADDITIONAL RC BEAM
ADDITIONAL CLOSURE
SEE SECTION 9-25mm∅ MATTING
TOP BARS AS REQUIRED TOP BARS
BARS ON CENTERS
1650

sd (IF REQUIRED) (IF REQUIRED)


sd BOTHWAYS
RC BEAM
B1 B1 SEE SECTION
E E DECK PARALLEL TO BEAM DECK PERPENDICULAR TO BEAM
C1 C1 C1
9825

75
L/4 L/4 900 900

1100 3500 1225 PLAN


4000

4000
sd 50 TYP. BEARING 50 TYP. BEARING
8-25mm∅ MAIN BARS
B1

B1

B1
Sd
WITH 2-10mm ∅ TIES SPACED
5@50mm, 5@100mm, 5@150mm,

1325
S1
REST @ 200mm
B1 B1 B1 B1
D D RC BEAM
C1 sd C1 C1 SEE SECTION
RC BEAM NATURAL GRADE LINE

2575
STELL DECK RIB TYPE
SB
11000

SB

SB

Fy = 410 MPa SEE SECTION SECTION


B1

S1
B1

B1

B1

B1
sd (STEEL THICKNESS=1.0MM)

4000
sd
4000

STAIRWELL S1 S1
sd
B1

B2
DECK PARALLEL TO BEAM DECK DIRECTION CHANGE FTB 01

1425
sd 5-16mm∅ MATTING
sd B1 B1 CUT AT EACH
B1 B1 BARS ON CENTERS
C C NOTE:

2.50
LOW FLUTE
BOTHWAYS
1. LOCATE ALL ADDED REINF. AT 20MM
C1 C1 C1 S1 END CLOSURE PLATE CLEAR FROM TOP OF CONCRETE.
9-20mm∅ MATTING
3000

BARS ON CENTERS
B1

sd sd 2. ADDED REINF. AT METAL DECK EDGE


B1

B1

TAKES PRECEDENCE OVER ANY BOTHWAYS


OTHER REINF. AND IS LOCATED AT
THE OUTERMOST LAYER.

.50
B1 B1 SECTION
B B
C1 C1
1.50

5 typical slab on metal deck detail SECTION


A A S-102 fs scale Nts

1 third floor framing 2 ROOF SLAB framing L/4 L/2 L/4

CONCRETE BEAM
S-102 fs scale 1:100 mts S-102 fs scale 1:100 mts

ENDSPAN MIDSPAN DIMENSION STIRRUPS


CONCRETE BEAMS
HANDRAIL

3 - 20mm.∅ 3 - 20mm.∅ 10mm.∅ rsb PROVIDE ADD'L


B-1 2 - 20mm.∅
2 - 12mm.∅ 250mm. x 500mm.
spaced @ 5 - 50mm., TOP BARS BETWEEN
2 - 12mm.∅ 5 - 100mm., 5 - 150mm., BARS
2 - 20mm.∅
3 - 20mm.∅ 3 - 20mm.∅ and rest @ 200mm. o.c.
12mm Ø CHAIR BARS SPACE
REINFORCED SLAB @ 150mm ON CENTERS
100

10mm.∅ rsb

900
2 - 16mm.∅ 2 - 16mm.∅ SLAB ON FILL
2 - 16mm.∅ spaced @ 5 - 50mm.,
B-2 2 - 12mm.∅
2 - 12mm.∅
200mm. x 300mm. 5 - 100mm., 5 - 150mm., 12mmØ RSB SPACED @
2 - 16mm.∅
2 - 16mm.∅ 2 - 16mm.∅ and rest @ 200mm. o.c. 200mm O.C. BOTHWAYS
BEAM

3 - 16mm.∅ 3 - 16mm.∅ 10mm.∅ rsb


2 - 16mm.∅ spaced @ 5 - 50mm.,
SB 2 - 12mm.∅ 150mm. x 500mm. 5 - 100mm., 5 - 150mm., SECOND FLOOR
2 - 12mm.∅ 2 - 16mm.∅ and rest @ 200mm. o.c.
3 - 16mm.∅ 3 - 16mm.∅ 12mmØ RSB SPACED @ 200mm O.C. CONCRETE BEAM
3-12mmØ LONGITUDINAL BARS
∅10 @ 400 O.C. CONCRETE BEAM
GROUND FLOOR B.W. TEMP BARS
3 - 20mm.∅ 3 - 20mm.∅ 10mm.∅ rsb
spaced @ 5 - 50mm.,
TB 250mm. x 400mm. 5 - 100mm., 5 - 150mm.,
3 - 20mm.∅ 3 - 20mm.∅ and rest @ 200mm. o.c.

4 stair connection details 6 typical slab on metal deck plan


S-102 S-102 fs scale Nts
fs scale Nts

3 SCHEDULE OF BEAMS
S-102 fs scale Nts

REPUBLIC ACT 9266 CIVIL ENGINEER PROJECT TITLE OWNER revisions SHEET CONTENT SHEET NUMBER

DRAWINGS AND SPECIFICATION DULY SIGNED, STAMPED, THIRD FLOOR FRAMING PLAN
OR SEALED AS INSTRUMENTS OF SERVICE ARE THE ROOF SLAB FRAMING
PROPERTIES AND DOCUMENTS OF ARCHITECT FRANCIS SCHEDULE OF BEAMS
BASCON GUMABAY, WHETHER THE OBJECT FOR WHICH STAIR CONNECTION DETAIL
THEY ARE MADE IS EXECUTED OR NOT, IT SHALL BE
UNLAWFUL FOR ANY PERSON, WITHOUT THE WRITTEN
CONSENT OF THE ARCHITECT OR AUTHOR OF THE SAID
DOCUMENTS TO DUPLICATE OR TO MAKE COPIES OF PRC NO.
SLAB ON METAL DECK DETAILS
S-102
SAID DOCUMENTS FOR THE USE IN THE REPETITION OF
ptr no. date issued
AND FOR OTHER PROJECTS OR BUILDING WHETHER
EXECUTED PARTLY OR IN WHOLE PROJECT LOCATION : ENRILLE, CAGAYAN valley, Philippines address : enrile, cagayan valley, Philippines, 3501
TIN NO. place issued

You might also like