NOTES:
CN TRURTH
E
N O
A B A B
REFERENCES:
1 1
2 2
FOUNDATION PLAN 2ND FLOOR FRAMING PLAN
STRUCTURAL REQUIREMENTS:
A B
FOR APPROVAL
LEGENDS: Approval of theContractor's drawings shall not be held to relieve the contractor or any part of the
Contractor's obligation to meet the requirements of the Specifications nor of the responsibility for
the correctness of the Contractor's drawings.
2 APPROVED RFC RETURNED W/O ACTION
AWCI NOTED/ INFO/ REFERENCE FOR CONSTRUCTION
RECOMMENDED:
SECTION CHECKED DATE REVIEWED DATE
ARCHITECTURAL
50 mm SECTION HEAD, EDD
CIVIL
ELECTRICAL APPROVED:
MECHANICAL
PROTECTION
COMMUNICATION DIVISION HEAD, EDD
ROOF BEAM FRAMING PLAN ROOF FRAMING PLAN OWNER:
NATIONAL GRID CORPORATION OF THE PHILIPPINES
CONTRACTOR:
MERALCO INDUSTRIAL ENGINEERING SERVICES CORPORATION
PROJECT NAME:
NAGA (VISAYAS) SUBSTATION UPGRADING PROJECT AND
NEW NAGA (COLON) 138kV SUBSTATION PROJECT
CONTRACT No./ PROJECT CODE: DWG./ DOC. DESCRIPTION:
APPROVED: DATE:
GUARD HOUSE - FOUNDATION, ROOF BEAM
FRAMING & ROOF FRAMING PLAN
REVIEWED: PROJECT LOCATION/ NAME OF SUBSTATION: SCALE:
DRAWN/ DESIGNED: DWG. No./ DOC. No. SHT. No. REV. No.
DRAWN/
NO DATE DESCRIPTION DESGND REVWD APPRVD