CALCULATION NOTE

Activity Code Material Code Order No Rev

NC
9303 1733 005 0
Perhitungan Balok Konsol GBK Issue 0 1 2 3 4 5 Page
Date 27/08/03
Calculated LC
Checked PC

File: RC Beam Design (ACI Code) Rev.0 Approved

BENDING DESIGN CORBEL NO.


B
1.5 m 0.9 m

0.5 m Beta1 = 0.85


av
k = Beta1* 6120 / ( 6120 + fy )
As Vu
u k = 0.5041
Ah
m = fy/ 0.85f'c = 14.12
Nu
Phi = 0.9
u = Friction coefficient = 1.4
d
1.46 m 1.5 m fy (kg/cm ) 2
= 4200
a/d <1.0 OK f'c (ksc) = 350
1
1 B >0.5d O.K Section Beam :
Bw (cm) = 100
d (cm) = 146
As = Max of : H (cm) = 150
1 Af +An = 66.99 cm^2
2 2/3(Avf)+An = 77.01 cm^2 Min Nu =0.2Vu = 53.349 Tons
3 0.04(fc'/fy)b*d = 48.67 cm^2 Max Vu = min(0.2fc'bd , 56bd)
As = 77.01 cm^2 7701.3 817600 kg
D 5.00 USE 16D25
Required number of rebar 16.0
Ah ( for closed stirrup) = Max of :
1 0.5Af = 12.78 cm^2
2 1/3Avf = 18.15 cm^2
Ah = 18.15 cm^2 Ah shall be placed with in 2d/3
D 2.00
Required number of rebar 7.0 USE 7D13@325mm
Maximun Ah spacing , (mm) 325.0 Spacing shall < 100 mm
CALCULATION
Vu (Tons) 266.7 Vu < Max Vu O.K
Nu (Tons) 147.9
Mu (Tons-m) = Vu*a+Nu*(h-d) 139.29 Nu >Min Nu O.K
Ru = Mu/phi(bd^2) 7.3
p = (0.85fc'/fy)*(1-(1-2*Ru/0.85fc')^0.5) 0.0018
Af = p*b*d , (cm^2) 25.55
D 4.00
Required number of rebar 7.0
Actual p 0.002
Phi Mn =Phi* p*fy*bd^2(1-0.59pfy/fc') , (Tons-m) 145 Phi Mn > Mu O.K
An = Nu/(0.85*fy) , ( cm^2) 41.43
Avf = Vu/(0.85*u*fy) , (cm^2) 53.37
REBAR A Fy
D 10 0.79 4000

D 13 1.33 4000

D 19 2.83 4000

D 22 3.80 4000

D 25 4.91 4000

D 32 8.04 4000