Professional Documents
Culture Documents
DATOS
MZ = Momento ultimo
Mz := 16.62 ( 100000) kg cm
fy := 4200 kg/cm2
Vu := 11.94 1000 = 11940 kg
f´c := 250 kg/cm2
b = base b := 20 cm
f*c := ( 0.80) f´c = 200
d = peralte d := 40 cm b
r = recubrimiento r := 3 cm f´´c := 0.85 f*c = 170 kg/cm2
0.7 f´c Mz =
Asmin := bd = 2.108 cm2 Asreq := 12.932 cm2
fy 0.9 fy 0.85 d
ACERO
Asreq
#Var := = 4.537 Areal := ( 4 ) ( 2.85) = 11.4 cm2 Area de acero real
2.85
REVISION DE CONDICION
Mr := 0.9 fy 0.85 d ( Areal) = 1465128
Mr > Mz
Mr = 1465128 Mz = 1662000
BASTONES
Mbast
Mbast := Mz - Mr = 196872 Asbas := = 1.532
0.9 fy 0.85 d
Asbas
Vbas := = 0.774
1.98 #Bast := 2 1.98 = 3.96
CÁLCULO DE ESTRIBOS
CUANTÍA
Areal
p := = 0.014
( b d)
Contribución VCR del concreto Vu = 11940 kg
d
S2 := = 10 cm
4