You are on page 1of 1

200 200 200 200 200 200

2-16mm∅ 2-16mm∅
4-16mm∅ 2-16mm∅

400

300
450
1500

200
2-16mm∅ 2-16mm∅ 4-16mm∅
2-16mm∅ 4-16mm∅
4-16mm∅ @ SUPPORT @ MIDSPAN

VERT. BARS
@ MIDSPAN @ SUPPORT @ MIDSPAN @ SUPPORT
8 - 16mmØ
BEAM 1 BEAM 2 ROOF/TIE BEAM
100
1500
400

TIES = 10mmØ - 1 @ 50mm,


RC CANOPY
5 @100mm,REST @ 150mm
4-12mm∅ 10mmØ STRAIGHT TOP
12-16mmØ RSB @ 129 mm

200
BARS SPACED AT 150mm
MAT BARS O.C. B.W. ON CENTER

10mmØ STRAIGTH BOTTOM


PLAN
LINTEL BEAM BARS SPACED AT 300mm
SLAB ON FILL
200 ON CENTER
N.G.L.
100

RC BEAM

300
550
450

TYPICAL CANOPY DETAIL


NOT DRAWN TO SCALE
300

TIE BEAM TIE BEAM


1500

TIES = 10mmØ - 1 @ 50mm, 110


400

10mmØ VERT.
5 @100mm,REST @ 150mm 10mmØ VERT.
BARS SPACED @
0.60M
BARS SPACED @
250

0.60M 4" CHB WALL


10mmØ HOR. BARS
4" CHB WALL EVERY 3 LATERS OF
CHB

10mmØ HOR. BARS

400
EVERY 3 LATERS OF
SECTION 10mmØ HOR. BARS
CHB

600
EVERY 3 LATERS OF
CHB DOWEL TO MATCH

400
CHB. VERT. BARS

300
200
C1F1 3-12mmØ HOR. BARS
FOOTING
SCALE 1:30 TIE BEAM
400 200

PROJECT TITLE: PREPARED BY: CHECKED BY: APPROVED: APPROVED: APPROVED:

ELMO P. PALMA JR. AGNES HOPE B. PALMARES


CONSTRUCTION OF SIDE ROOFING WITH BLEACHER
ARCHITECT 1 ENGINEER IV
ARMEN R. DEGAYO ILDEFONSO NOLI S.MOSQUERA
MOISES A. ITURIAGA AL JOY PAYAS ATTY. STEPHEN A. PALMARES, CPA
LOCATION: SITIO LUNOY,BRGY. CABUGA ,PASSI CITY ENGINEERING ASSISTANT ENGINEER IV CITY ENGINEER I BARANGAY CAPTAIN CITY MAYOR

You might also like